Every reference with a DOI in the deposited reference list resolved to a known
work in Crossref or DataCite at the dated check, and none carried a retraction,
withdrawal, or removal notice.
The 39 checked references that resolve
resolves10.1016/S0098-1354(03)00171-6A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants
resolves10.1021/ie800194bShort-Term Scheduling of Multistage Batch Plants with Unlimited Intermediate Storage
resolves10.1002/aic.14412Optimal maintenance scheduling of a gas engine power plant using generalized disjunctive programming
resolves10.1016/j.cie.2014.11.001Hybrid genetic optimization for solving the batch-scheduling problem in a pharmaceutical industry
resolves10.1021/ie010399fA Simple New Continuous-Time Formulation for Short-Term Scheduling of Multipurpose Batch Processes
resolves10.1021/ie970927gEffective Continuous-Time Formulation for Short-Term Scheduling. 1. Multipurpose Batch Processes
resolves10.1021/ie9709289Effective Continuous-Time Formulation for Short-Term Scheduling. 2. Continuous and Semicontinuous Processes
resolves10.1002/aic.690440714Cyclic scheduling of continuous parallel‐process units with decaying performance
resolves10.1016/j.ejor.2010.06.002MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: A benchmark scheduling problem of the pharmaceutical industry
resolves10.1021/bp0501571Medium Term Planning of Biopharmaceutical Manufacture using Mathematical Programming
resolves10.1021/ie5008807Optimal Production and Maintenance Planning of Biopharmaceutical Manufacturing under Performance Decay
resolves10.1016/j.compchemeng.2014.03.017Simultaneous regular and non-regular production scheduling of multipurpose batch plants: A real chemical–pharmaceutical case study
resolves10.1021/ie901433bOptimization of Preventive Maintenance in Chemical Process Plants
resolves10.1021/ie000431qInteractions of Maintenance and Production Planning for Multipurpose Process PlantsA System Effectiveness Approach
resolves10.1021/ie050341rOptimal Shutdown Policy for Maintenance of Cracking Furnaces in Ethylene Plants
resolves10.1021/ie060480oImproved Unit-Specific Event-Based Continuous-Time Model for Short-Term Scheduling of Continuous Processes: Rigorous Treatment of Storage Requirements
resolves10.1021/ie0601403Continuous-Time Models for Short-Term Scheduling of Multipurpose Batch Plants: A Comparative Study
resolves10.1002/btpr.1959Capacity optimization and scheduling of a multiproduct manufacturing facility for biotech products
resolves10.1002/btpr.1860Capacity planning for batch and perfusion bioprocesses across multiple biopharmaceutical facilities
resolves10.1016/j.ejor.2011.06.021Discrete and continuous time representations and mathematical models for large production scheduling problems: A case study from the pharmaceutical industry
resolves10.1016/B978-0-444-63428-3.50296-4Optimisation of Maintenance Planning into the Production of Biopharmaceuticals with Performance Decay using a Continuous-time Formulation
checked 2026-07-22 — re-checked daily as this page is visited;
titles and statuses come from Crossref and DataCite and are not part of the signed record
Both snippets point at the live badge image and link back to this page. The
badge re-renders from the daily check, so an embed never goes stale by more than a day of visits.