Reference health

MIP formulations and heuristics for two-level production-transportation problems

https://doi.org/10.1016/j.cor.2012.02.011
CiteStamped reference-health badge
30/30 checkable references clean · checked 2026-07-23

Every reference with a DOI in the deposited reference list resolved to a known work in Crossref or DataCite at the dated check, and none carried a retraction, withdrawal, or removal notice.

9 without a DOI — not checked. A reference deposited without a DOI is never matched by title or guessed at; it stays outside the checked set, and this line discloses that.

The 30 checked references that resolve
resolves10.1016/S0377-2217(02)00331-4
The single-item lot-sizing problem with immediate lost sales
resolves10.1016/0167-6377(89)90001-1
Computational complexity of uncapacitated multi-echelon production planning problems
resolves10.1007/BFb0121006
Uncapacitated lot-sizing: The convex hull of solutions
resolves10.1287/mnsc.47.7.993.9800
Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs
resolves10.1016/j.cor.2007.10.014
A cross entropy-Lagrangean hybrid algorithm for the multi-item capacitated lot-sizing problem with setup times
resolves10.1007/s10107-004-0518-7
Exploring relaxation induced neighborhoods to improve MIP solutions
resolves10.1080/07408170600733244
A Lagrangean heuristic for integrated production and transportation planning problems in a dynamic, multi-item, two-layer supply chain
resolves10.1287/opre.35.6.832
Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition
resolves10.1002/(SICI)1520-6750(199908)46:5<463::AID-NAV2>3.0.CO;2-S
Time-partitioning heuristics: Application to one warehouse, multiitem, multiretailer lot-sizing problems
resolves10.1007/s10107-003-0395-5
Local branching
resolves10.1007/s10107-004-0570-3
The feasibility pump
resolves10.1287/mnsc.47.6.851.9813
A Tabu-Search Heuristic for the Capacitated Lot-Sizing Problem with Set-up Carryover
resolves10.1287/mnsc.44.6.859
Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
resolves10.1287/opre.51.5.735.16752
A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse
resolves10.1287/mnsc.1070.0781
A Constant Approximation Algorithm for the One-Warehouse Multiretailer Problem
resolves10.1007/PL00011411
The uncapacitated lot-sizing problem with sales and safety stocks
resolves10.1287/opre.35.6.820
Generating Alternative Mixed-Integer Programming Models Using Variable Redefinition
resolves10.1016/j.orl.2010.04.001
Uncapacitated two-level lot-sizing
resolves10.1016/0925-5273(94)90042-6
Lagrangian heuristics for the capacitated multi-item lot-sizing problem with backordering
resolves10.1080/00207540412331327718
An integrated approach for production and distribution planning in supply chain management
resolves10.1287/ijoc.1030.0042
A General Heuristic for Production Planning Problems
resolves10.1007/BF01582225
Polyhedra for lot-sizing with Wagner—Whitin costs
resolves10.1016/j.omega.2006.11.004
Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms☆
resolves10.1016/j.cor.2003.08.002
A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers
resolves10.1007/s10479-011-1022-0
The one-warehouse multi-retailer problem: reformulation, classification, and computational results
resolves10.1287/opre.51.3.487.14949
Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
resolves10.1016/j.ejor.2007.11.052
Lagrangean relaxation based heuristics for lot sizing with setup times
resolves10.1287/mnsc.1050.0378
Integrated Lot Sizing in Serial Supply Chains with Production Capacities
resolves10.1007/s10107-005-0663-7
Approximate extended formulations
resolves10.1287/mnsc.15.9.506
A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
The 9 references without a DOI — listed, not checked
no DOI — not checkedDenizel M, Solyali O, Süral H. Tight formulations for the two and three level serial lot-sizing problems. In: International workshop on lot-sizing, IWLS2010; 2010.
no DOI — not checkedOn discrete lot-sizing and scheduling on identical parallel machines
no DOI — not checkedPlant location set covering and economic lot sizes: an O(mn) algorithm for structured problems
no DOI — not checkedLISCOS. EU GROWTH project LISCOS, Large scale integrated supply chain optimization software; 1999–2003.
no DOI — not checkedMelo RA. Mixed integer programming formulations and heuristics for joint production and transportation problems. PhD thesis, Ecole Polytechnique de Louvain, Université catholique de Louvain; 2011.
no DOI — not checkedPochet Y. Lot-sizing problems: reformulations and cutting plane algorithms. PhD thesis, Université Catholique de Louvain, Belgium; 1987.
no DOI — not checked10.1016/j.cor.2012.02.011_bib30
no DOI — not checkedRardin RL, Choe U. Tighter relaxations of fixed charge network flow problems. Technical Report J-79-18, ISYE; 1979.
no DOI — not checkedSeeanner F, Meyr H. Multi-stage simultaneous lot-sizing and scheduling for flow line production. Technical Report, Fachgebiet Produktion and Supply Chain Management, Technische Universität Darmstadt; 2010.
What this badge says. CiteStamped means the CHECKABLE references of this work were clean at the dated check: each resolved to a known work in a public registry, and none carried a retraction notice at that time. It says nothing about the quality, findings, or importance of the work itself, and nothing about references deposited without a DOI.

checked 2026-07-23 — re-checked daily as this page is visited; titles and statuses come from Crossref and DataCite and are not part of the signed record

Embed this badge

Both snippets point at the live badge image and link back to this page. The badge re-renders from the daily check, so an embed never goes stale by more than a day of visits.

<a href="https://citestamp.com/citestamped/10.1016/j.cor.2012.02.011"><img src="https://citestamp.com/citestamped/10.1016/j.cor.2012.02.011/badge.svg" alt="CiteStamped reference-health badge" width="460" height="64"></a>
[![CiteStamped reference-health badge](https://citestamp.com/citestamped/10.1016/j.cor.2012.02.011/badge.svg)](https://citestamp.com/citestamped/10.1016/j.cor.2012.02.011)