Reference health

Two-stage adjustable robust optimal dispatching model for multi-energy virtual power plant considering multiple uncertainties and carbon trading

https://doi.org/10.1016/j.jclepro.2022.130400
CiteStamped reference-health badge
25/25 checkable references clean · checked 2026-07-23

Every reference with a DOI in the deposited reference list resolved to a known work in Crossref or DataCite at the dated check, and none carried a retraction, withdrawal, or removal notice.

16 without a DOI — not checked. A reference deposited without a DOI is never matched by title or guessed at; it stays outside the checked set, and this line discloses that.

The 25 checked references that resolve
resolves10.1016/j.apenergy.2019.01.238
Coordinated operation of electric vehicle charging and wind power generation as a virtual power plant: A multi-stage risk constrained approach
resolves10.1016/j.applthermaleng.2018.12.108
Robust scheduling of thermal, cooling and electrical hub energy system under market price uncertainty
resolves10.1109/TPWRS.2016.2525009
A Multi-Band Uncertainty Set Based Robust SCUC With Spatial and Temporal Budget Constraints
resolves10.1016/j.applthermaleng.2017.05.069
Stochastic risk-constrained scheduling of smart energy hub in the presence of wind power and demand response
resolves10.1016/j.energy.2020.118805
An improved Shapley value-based profit allocation method for CHP-VPP
resolves10.1109/TPWRS.2013.2288017
Uncertainty Sets for Robust Unit Commitment
resolves10.1016/j.jclepro.2020.123446
Optimal dispatching of electric-thermal interconnected virtual power plant considering market trading mechanism
resolves10.1016/j.enconman.2016.09.072
Multi-objective stochastic scheduling optimization model for connecting a virtual power plant to wind-photovoltaic-electric vehicles considering uncertainties and demand response
resolves10.1016/j.ijepes.2018.12.012
A CVaR-robust-based multi-objective optimization model and three-stage solution algorithm for a virtual power plant considering uncertainties and carbon emission allowances
resolves10.1016/j.apenergy.2016.03.020
A bi-level stochastic scheduling optimization model for a virtual power plant connected to a wind–photovoltaic–energy storage system considering the uncertainty and demand response
resolves10.1016/j.apenergy.2019.05.027
A multi-objective robust scheduling model and solution algorithm for a novel virtual power plant connected with power-to-gas and gas storage tank considering uncertainty and demand response
resolves10.1016/j.apenergy.2020.115707
Robust stochastic optimal dispatching method of multi-energy virtual power plant considering multiple uncertainties
resolves10.1016/j.apenergy.2019.04.130
Bi-level multi-time scale scheduling method based on bidding for multi-operator virtual power plant
resolves10.3390/en11113171
Probabilistic Load Flow Method Based on Modified Latin Hypercube-Important Sampling
resolves10.1109/TSG.2017.2773039
Risk-Constrained Optimal Energy Management for Virtual Power Plants Considering Correlated Demand Response
resolves10.1016/j.apenergy.2019.03.205
Model predictive control based robust scheduling of community integrated energy system with operational flexibility
resolves10.1016/j.ijhydene.2015.08.038
Mixed integer linear programing based approach for optimal planning and operation of a smart urban energy network to support the hydrogen economy
resolves10.1016/j.ijepes.2016.01.044
Optimal planning and scheduling of energy hub in presence of wind, storage and demand response under uncertainty
resolves10.1109/60.986449
Market constrained optimal planning for wind energy conversion systems over multiple installation sites
resolves10.1016/j.ijepes.2020.106047
Multi-stage stochastic framework for energy management of virtual power plants considering electric vehicles and demand response programs
resolves10.1016/j.jclepro.2019.119106
Dispatching optimization model of gas-electricity virtual power plant considering uncertainty based on robust stochastic optimization theory
resolves10.1016/j.energy.2020.117013
A two-stage optimization model for Park Integrated Energy System operation and benefit allocation considering the effect of Time-Of-Use energy price
resolves10.1016/j.orl.2013.05.003
Solving two-stage robust optimization problems using a column-and-constraint generation method
resolves10.1109/TSG.2015.2401337
Unit Commitment Model in Smart Grid Environment Considering Carbon Emissions Trading
resolves10.17775/CSEEJPES.2015.00020
Initial exploration of wind farm cluster hierarchical coordinated dispatch based on virtual power generator concept
The 16 references without a DOI — listed, not checked
no DOI — not checkedRisk-based scheduling of smart apartment building under market price uncertainty using robust optimization approach
no DOI — not checkedDecentralized optimal dispatching modeling for wind power integrated power system with virtual power plant
no DOI — not checked10.1016/j.jclepro.2022.130400_bib5
no DOI — not checkedFast and dynamic robust optimization of integrated electricity-gas system operation with carbon trading
no DOI — not checkedTwo-stage robust optimal scheduling of regional integrated energy system considering network constraints and uncertainties in source and load
no DOI — not checkedBi-level coordination mechanism and operation strategy of multi-time scale multiple virtual power plants
no DOI — not checkedEconomic dispatch of microgrid based on two stage robust optimization
no DOI — not checkedOptimal dispatch of virtual power plant considering risk adjusted return on capital constraints
no DOI — not checkedRisk-averse probabilistic framework for scheduling of virtual power considering demand response and uncertainties
no DOI — not checkedGame model of electricity market involving virtual power plant composed of wind power and electric vehicles
no DOI — not checkedModeling ellipsoidal uncertainty set considering conditional correlation of wind power generation
no DOI — not checkedEnsemble spectral clustering algorithm for load profiles considering dual-scale similarities
no DOI — not checkedVirtual power plants providing AGC FM service considering uncertainty of electric vehicles
no DOI — not checkedTwo-stage robust optimization model of day-ahead scheduling considering carbon emissions trading
no DOI — not checkedW-S-C capture coordination in virtual power plant considering source-load uncertainty
no DOI — not checkedLow-carbon economic dispatch based on virtual power plant made up of carbon capture unit and wind power under double carbon constraint
What this badge says. CiteStamped means the CHECKABLE references of this work were clean at the dated check: each resolved to a known work in a public registry, and none carried a retraction notice at that time. It says nothing about the quality, findings, or importance of the work itself, and nothing about references deposited without a DOI.

checked 2026-07-23 — re-checked daily as this page is visited; titles and statuses come from Crossref and DataCite and are not part of the signed record

Embed this badge

Both snippets point at the live badge image and link back to this page. The badge re-renders from the daily check, so an embed never goes stale by more than a day of visits.

<a href="https://citestamp.com/citestamped/10.1016/j.jclepro.2022.130400"><img src="https://citestamp.com/citestamped/10.1016/j.jclepro.2022.130400/badge.svg" alt="CiteStamped reference-health badge" width="460" height="64"></a>
[![CiteStamped reference-health badge](https://citestamp.com/citestamped/10.1016/j.jclepro.2022.130400/badge.svg)](https://citestamp.com/citestamped/10.1016/j.jclepro.2022.130400)