Every reference with a DOI in the deposited reference list resolved to a known
work in Crossref or DataCite at the dated check, and none carried a retraction,
withdrawal, or removal notice.
The 35 references without a DOI — listed, not checked
no DOI — not checked10.1016/j.resourpol.2015.04.001_bib1001
no DOI — not checkedAnderson, F., and Greber, J., 2013. Forecasts iron-clad in reliance on mining, News Paper Report, 16 May 2013, Australian Financial Review, General News, p. 12, Australia.
no DOI — not checkedReserve Estimation of an open pit mine under price uncertainty by real option approach
no DOI — not checkedAPI, 2010. West Pilbara Iron Ore Project, Project update – July 2010. Retrieved from 〈www.apijv.com.au〉
no DOI — not checkedAquila Resources, 2012. West Pilbara iron ore project capital and operating cost revision, Asx Release, 8th October 2012, retrieved from 〈http://www.aquilaresources.com.au/files/west%20pilbara%20iron%20ore%20project%20-〉.
no DOI — not checkedArchambeault, L., 2007. Application of artificial intelligence to ROs project valuation and mine optimisation, The Australasian Institute of Mining and Metallurgy, In: Proceedings of Project Evaluation Conference 2007, pp. 159–168, Melbourne, Victoria, retrieved from 〈http://www.ausimm.com.au/publications/epublication.aspx?ID=2416〉
no DOI — not checkedBuckeridge, F., Gillespie, B., and Loadsman, S., 2010. Optimising extended mining operations through value driver modelling, Price Waterhouse Coopers – Australia, retrieved from 〈http://www.pwc.com.au/publications/index.htm〉.
no DOI — not checkedCambridge Economic Policy Associates Ltd, 2013. Advice on estimation of the risk free rate and market risk premium: report prepared for the Australian Energy Regulator (Final report), CEPA, Final Report, March 12, 2013, Australia, retrieved from 〈http://www.aer.gov.au/sites/default/files/JIA%20Appendix%20E%20-%20Officer%20and%20Bishop%20%20Term%20of%20risk%20free%20rate.pdf〉.
no DOI — not checked10.1016/j.resourpol.2015.04.001_bib8
no DOI — not checked10.1016/j.resourpol.2015.04.001_bib1004
no DOI — not checkedEdelmann, J., Koivuniemi, J., 2004. The future development of mobile services and applications examined through the real options approach. In: Telektronikk, Proceedings of the 16th Conference of the International Society for Professional Innovation Management (ISPIM), Oslo, Norway, June 20–23, 2004. Retrieved from 〈http://www.tbrc.fi/publication.php?PUBID=371&h=7cc91cd0f〉
no DOI — not checkedEls, F., 2012. Not one Chinese iron mine makes money at $80 – There׳s your new price floor, News report, October 4, 2012, Mining.com., retrieved from 〈http://www.mining.com/not-one-chinese-iron-mine-makes-money-at-80-theres-your-new-price-floor-47859/〉
no DOI — not checkedEvatt, G.W., Jonhson, P.V., Duck, P.W. and Howell, S.D., 2010. Mine valuation in the presence of a stochastic ore-grade uncertainty. In: Proceedings of the World Congress on Engineering—WCE, III, June 30 – July 2, 2010, London, U.K.
no DOI — not checkedFitzGerald, B., 2013. Resource players must pedal fast to stand still, News Paper Report, 16 May 2013, Australian, Budget Supplement, p. 20, Australia.
no DOI — not checkedGroeneveld, B., Topal, E., and Leenders, B., 2010. Robust versus flexible open pit mine design. In: Proceedings of the Mine Planning and Equipment Selection (MPES) Conference, Fremantle, WA, 1–3 Dec. 2010.
no DOI — not checkedGuj, P., Garzon, R., 2007. Modern asset pricing—a valuable real option complement to discounted cash flow modeling of mining project. In: Proceedings of the Project Evaluation Conference, Melbourne, Vic, 19–20 June 2007. Retrieved from 〈http://www.alexanderresearch.com.au/images/stories/literature/2007_guj_and_garzon_map_ausimm.pdf〉.
no DOI — not checked10.1016/j.resourpol.2015.04.001_bib1006
no DOI — not checkedHerbelot, O., 1994. Option Valuation of Flexibility Investment: The Case of Scrubber for Coal- fire Power Plant (Ph.D. Thesis). Massachusetts Institute of Technology, MIT-CEEPR 94-001WP.
no DOI — not checkedIndexMundi, 2013. Iron Ore Monthly Price – US Dollars per Dry Metric Ton, IndexMundi.com, retrieved from 〈http://www.indexmundi.com/commodities/?commodity=iron-ore&months=360〉
no DOI — not checkedInfoMine, 2013. Chart and Data, InfoMine.com, retrieved from 〈http://www.infomine.com/ChartsAndData/ChartBuilder.aspx?〉gf=140263.USD.t|140262.USD.t&df=20120501&dt=20130524&dr=1y
no DOI — not checkedIron Ore Holding, 2013. Buckland Project, retrieved from 〈http://www.ironoreholdings.com/locations/western_hub/buckland_project.phtml〉
no DOI — not checkedReal options in engineering system design
no DOI — not checkedKazakidis, V.N., & Scoble, M., 2002. Planning for flexibility in underground mine production systems, MIT, retrieved from 〈www.ardent.mit.edu/real_options/Real_opts.../kazakidis%20&Scoble.pdf〉
no DOI — not checkedReal options based analysis in pharmaceutical partnerships for research and development
no DOI — not checkedKohut, B., 2013. Playing The Price of Iron Ore in 2013 And Beyond. The Bull Newsletter, retrieved from 〈http://www.thebull.com.au/articles/a/36238-playing-the-price-of-iron-ore-in-2013-and-beyond.html〉
no DOI — not checkedMacro Business, 2012. The Long Term Price of Iron Ore, Macro Business, retrieved from 〈http://www.macrobusiness.com.au/2012/09/the-long-term-price-of-iron-ore/〉
no DOI — not checkedMartinez, L.A., and McKibben, J., 2010. Understanding real options in perspective mine project valuation: a simple abstract discounted cash flow analysis for mine project valuation, (R. Castro, X. Emery, & R. Kuyvenhoven, Eds.) Minin 2010, 223–234, Gecamin.
no DOI — not checkedMcNab, B., Jankoviv, A., David, D., and Payne, P., 2009. Processing of magnetite iron ore – comparing grinding options. In: Proceedings of the Iron Ore Conference, 27–29 July 2009, Perth, Western Australia.
no DOI — not checkedMetals Economics Group, 2012. Capital costs: junior-owned feasibility-stage iron ore projects, Strategic Report, October 2012, retrieved from 〈www.metalseconomics.com〉.
no DOI — not checkedPapadakis, M., 2013. Iron ore price drops forecast to continue, News Paper Report, 16 May 2013, Australian Financial Review, Companies and Markets, p. 33, Australia.
no DOI — not checkedHybrid real option valuation of risky product development projects
no DOI — not checkedR2Mining, 2013. Australasian CostMine, retrieved from 〈http://www.r2mining.com/〉
no DOI — not checkedStrike Resources, 2013. Apurimac Iron Ore Project, retrieved from 〈http://strikeresources.com.au/projects/apurimac-iron-ore-project/〉
no DOI — not checkedTopal, E., Shafiee, S., and Nehring, M., 2009. Adjusted real option valuation to maximise mining project value – a case study using century mine. In: Proceedings of the Project Evaluation Conference Melbourne, Vic, 21 – 22 April 2009, Melbourne, Australia.
no DOI — not checkedTreadgold, T., 2013. Mining titan who matters now more than ever, Special Correspondent, retrieved from 〈http://www.royhill.com.au/sites/default/files/tim%20treadgold׳s%20article.pdf〉
checked 2026-07-25 — re-checked daily as this page is visited;
titles and statuses come from Crossref and DataCite and are not part of the signed record
Both snippets point at the live badge image and link back to this page. The
badge re-renders from the daily check, so an embed never goes stale by more than a day of visits.