Reference health

Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options

https://doi.org/10.1061/(asce)co.1943-7862.0000447
CiteStamped reference-health badge
4/4 checkable references clean · checked 2026-07-26

Every reference with a DOI in the deposited reference list resolved to a known work in Crossref or DataCite at the dated check, and none carried a retraction, withdrawal, or removal notice.

38 without a DOI — not checked. A reference deposited without a DOI is never matched by title or guessed at; it stays outside the checked set, and this line discloses that.

The 4 checked references that resolve
resolves10.1109/HICSS.2008.36
A Real-Options Approach to Modeling Investments in Competitive, Dynamic  Retail Markets
resolves10.4324/9780203003886
Unsustainable Transport
resolves10.1515/9781400830176
Investment under Uncertainty
resolves10.1596/0-8213-5556-2
Public Money for Private Infrastructure
The 38 references without a DOI — listed, not checked
no DOI — not checkedPPP infrastructure investment: Critical aspects and prospectsPolicy, finance and management for public-private partnership
no DOI — not checkedASCE. (2009). “Report card for America’s infrastructure.” 〈http://www.infrastructurereportcard.org/sites/default/files/RC2009_roads.pdf〉 (Oct. 10 2009).
no DOI — not checkede_1_3_1_4_1
no DOI — not checkede_1_3_1_6_1
no DOI — not checkede_1_3_1_8_1
no DOI — not checkede_1_3_1_9_1
no DOI — not checkede_1_3_1_10_1
no DOI — not checkede_1_3_1_11_1
no DOI — not checkedApplication of real options in PPP infrastructure projects: Opportunities and challengesPolicy, finance and management for public-private partnership
no DOI — not checkede_1_3_1_13_1
no DOI — not checkede_1_3_1_14_1
no DOI — not checkedReal options: A practitioners guide
no DOI — not checkedCuttaree V. (2008). “Successes and failures of PPP projects.” The World Bank Washington DC.
no DOI — not checkedApplied systems analysis: Engineering planning and technology management
no DOI — not checkedDe Neufville R. Lee Y. S. and Scholtes S. (2008). “Flexibility in hospital infrastructure design.” Proc. IEEE Conf. on Infrastructure Systems IEEE Washington DC 8–10.
no DOI — not checkedNew generation whole-life costing—Property and construction decision-making under uncertainty
no DOI — not checkedFederal Highway Administration. (2008). “Glossary of terms.” 〈http://www.fhwa.dot.gov/reports/pppwave/08.htm〉 (Jun. 4 2010).
no DOI — not checkede_1_3_1_22_1
no DOI — not checkede_1_3_1_23_1
no DOI — not checkede_1_3_1_24_1
no DOI — not checkede_1_3_1_25_1
no DOI — not checkede_1_3_1_26_1
no DOI — not checkedHodges J. (2006). “PPP highway experiences: Chile and Mexico.” The World Bank Regional Workshop on Public-Private Partnership (PPP) in Highways Belgrade Serbia.
no DOI — not checkede_1_3_1_28_1
no DOI — not checkedOptions, futures, and other derivatives
no DOI — not checkedFinancial modeling of PPPPolicy, finance and management for public-private partnership
no DOI — not checkedLee S. (2007). “Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach.” Ph.D. thesis University of Colorado Boulder CO.
no DOI — not checkedInvestment science
no DOI — not checkedMandri-Perrott C. (2006). “Mobilizing private capital and management into infrastructure development.” The World Bank Infrastructure Economics and Finance Dept. (IEF) Workshop Riga Latvia.
no DOI — not checkede_1_3_1_35_1
no DOI — not checkedQueiroz C. (2007). “International experience with transport PPP projects.” The World Bank Regional Workshop on Public-Private Partnership (PPP) in Highways Riga Latvia.
no DOI — not checkedQueiroz C. and Izaguirre A. (2008). “Worldwide trends in private participation in roads: Growing activity growing government support.” PPIAF Gridline Note No. 37. The World Bank Washington DC.
no DOI — not checkede_1_3_1_38_1
no DOI — not checkede_1_3_1_39_1
no DOI — not checkedTransportation Research Board. (2000). “Highway capacity manual.” Washington DC.
no DOI — not checkedTRANSYT. (2007). “Evaluation of demand risk mitigation in PPP projects.” EIB University Research Sponsorship Program Transport Research Center.
no DOI — not checkedU.S. General Accounting Office. (1999). “Public-private partnership: Related to building and facility partnerships.” 〈http://www.gao.gov/special.pubs/Gg99071.pdf〉 (Nov. 15 2009).
no DOI — not checkede_1_3_1_43_1
What this badge says. CiteStamped means the CHECKABLE references of this work were clean at the dated check: each resolved to a known work in a public registry, and none carried a retraction notice at that time. It says nothing about the quality, findings, or importance of the work itself, and nothing about references deposited without a DOI.

checked 2026-07-26 — re-checked daily as this page is visited; titles and statuses come from Crossref and DataCite and are not part of the signed record

Embed this badge

Both snippets point at the live badge image and link back to this page. The badge re-renders from the daily check, so an embed never goes stale by more than a day of visits.

<a href="https://citestamp.com/citestamped/10.1061/(asce)co.1943-7862.0000447"><img src="https://citestamp.com/citestamped/10.1061/(asce)co.1943-7862.0000447/badge.svg" alt="CiteStamped reference-health badge" width="460" height="64"></a>
[![CiteStamped reference-health badge](https://citestamp.com/citestamped/10.1061/(asce)co.1943-7862.0000447/badge.svg)](https://citestamp.com/citestamped/10.1061/(asce)co.1943-7862.0000447)