On the public citation graph

Capture and Reuse of Project Knowledge in Construction

https://doi.org/10.1002/9781444315448
0 signed · 57 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4661085openalex-extracted
Using a Mixed Method in Developing a Decision Support Framework Through Knowledge Management Processes for Key Stakeholders in Delivering Sustainable Retrofit Building Projects
inferred← citeshttps://doi.org/10.1007/978-3-031-88322-4_5openalex-snapshot
Gaps in Circular Economy Business Model Theoretical Frameworks
inferred← citeshttps://doi.org/10.1007/978-981-15-8079-6_195openalex-snapshot
Application of Knowledge Management and BIM Technology for Maintenance Management of Concrete Structures
inferred← citeshttps://doi.org/10.1007/s11092-018-9278-4openalex-snapshot
Adopting and adapting: school leaders in the age of data-informed decision making
inferred← citeshttps://doi.org/10.1007/s12205-012-1468-xopenalex-snapshot
A diagnostic model for assessing the knowledge management practices of construction firms
inferred← citeshttps://doi.org/10.1016/j.asej.2022.101790openalex-snapshot
Capitalising knowledge management (KM) for improving project delivery in construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2018.05.014openalex-snapshot
Knowledge dynamics-integrated map as a blueprint for system development: Applications to safety risk management in Wuhan metro project
inferred← citeshttps://doi.org/10.1016/j.autcon.2019.102977openalex-snapshot
A lessons-learned tool for organizational learning in construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2024.105466openalex-snapshot
Construction risk identification using a multi-sentence context-aware method
inferred← citeshttps://doi.org/10.1016/j.eswa.2021.114776openalex-snapshot
A knowledge-based risk management tool for construction projects using case-based reasoning
inferred← citeshttps://doi.org/10.1016/j.ijproman.2016.05.009openalex-snapshot
How to reduce the negative impacts of knowledge heterogeneity in engineering design team: Exploring the role of knowledge reuse
inferred← citeshttps://doi.org/10.1016/j.ijproman.2016.07.001openalex-snapshot
Application of the Systemic Lessons Learned Knowledge model for Organisational Learning through Projects
inferred← citeshttps://doi.org/10.1016/j.ijproman.2017.04.010openalex-snapshot
Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication
inferred← citeshttps://doi.org/10.1016/j.rser.2013.07.056openalex-snapshot
The impact of sustainable construction and knowledge management on sustainability goals. A review of the Venezuelan renewable energy sector
inferred← citeshttps://doi.org/10.1016/j.sbspro.2012.08.039openalex-snapshot
Uncovering Tacit Knowledge in Construction Industry: Communities of Practice Approach
inferred← citeshttps://doi.org/10.1061/(asce)ae.1943-5568.0000380openalex-snapshot
Integrated Change and Knowledge Management Approach for Energy Retrofits
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0001456openalex-snapshot
Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
inferred← citeshttps://doi.org/10.1061/(asce)cp.1943-5487.0000229openalex-snapshot
Information Retrieval from Civil Engineering Repositories: Importance of Context and Granularity
inferred← citeshttps://doi.org/10.1061/(asce)cp.1943-5487.0000484openalex-snapshot
Process Knowledge Capture in BIM-Based Mechanical, Electrical, and Plumbing Design Coordination Meetings
inferred← citeshttps://doi.org/10.1061/(asce)me.1943-5479.0000076openalex-snapshot
Motivating Knowledge Sharing in Engineering and Construction Organizations: Power of Social Motivations
inferred← citeshttps://doi.org/10.1061/(asce)me.1943-5479.0000109openalex-snapshot
Case Study of Knowledge Management Implementation in a Medium-Sized Construction Sector Firm
inferred← citeshttps://doi.org/10.1061/(asce)me.1943-5479.0000934openalex-snapshot
BIM-Supported Knowledge Management: Potentials and Expectations
inferred← citeshttps://doi.org/10.1061/9780784412329.182openalex-snapshot
Exploratory Study of Sustainability Knowledge Management in Capital Project Offices
inferred← citeshttps://doi.org/10.1061/9780784413029.029openalex-snapshot
Integration of Change and Knowledge Management Processes in Energy-Efficient Retrofit Projects
inferred← citeshttps://doi.org/10.1080/01446190802621044openalex-snapshot
Managing construction project change: a knowledge management perspective
inferred← citeshttps://doi.org/10.1080/01446193.2013.778417openalex-snapshot
Teaming/timing sequences in hotel development projects
inferred← citeshttps://doi.org/10.1080/01446193.2016.1180416openalex-snapshot
Tacit and explicit knowledge in construction management
inferred← citeshttps://doi.org/10.1080/09537287.2020.1774676openalex-snapshot
Capturing and reusing knowledge: analysing the what, how and why for construction planning and control
inferred← citeshttps://doi.org/10.1080/15623599.2019.1629864openalex-snapshot
Enhancing project delivery performances in construction through experiential learning and personal constructs: competency development
inferred← citeshttps://doi.org/10.1080/15623599.2025.2505687openalex-snapshot
Open repository development framework for knowledge sharing: best practices in the architecture, engineering, and construction industry
inferred← citeshttps://doi.org/10.1080/17452007.2014.896782openalex-snapshot
Design management of sustainability values: a learning organization perspective
inferred← citeshttps://doi.org/10.1108/jedt-10-2020-0413openalex-snapshot
Criticality of project knowledge and experience in the delivery of construction projects
inferred← citeshttps://doi.org/10.1108/jsit-08-2013-0041openalex-snapshot
Evaluating knowledge management systems efficacy and effectiveness in a design science context
inferred← citeshttps://doi.org/10.1145/2362456.2362460openalex-snapshot
Rethinking lessons learned capturing
inferred← citeshttps://doi.org/10.1145/2494188.2494229openalex-snapshot
On the Implications of Lessons Learned Use for Lessons Learned Content
inferred← citeshttps://doi.org/10.1177/2055563615592739openalex-snapshot
Developing government expertise in strategic contracting for public–private partnerships
inferred← citeshttps://doi.org/10.1504/mejm.2017.087517openalex-snapshot
Key knowledge management strategies implemented in the Kingdom of Saudi Arabia construction industry: an empirical study
inferred← citeshttps://doi.org/10.18687/laccei2016.1.1.072openalex-snapshot
Renewable Energy Infrastructure. Importance to Reach Sustainability goals. Venezuelan situation in 2016
inferred← citeshttps://doi.org/10.20868/upm.thesis.29360openalex-snapshot
Modelo de Gestión del Conocimiento para la Competitividad del Sector de las Construcciones Petroleras, Petroquímicas y Energéticas Venezolanas
inferred← citeshttps://doi.org/10.22215/etd/2021-14703openalex-snapshot
Knowledge Sharing Strategies for Smart Architectural Development: Facilitating Interdisciplinary Collaborative Design
inferred← citeshttps://doi.org/10.29007/59pdopenalex-snapshot
Engineering and Construction Expertise Transfusion at the U.S. Army Corps of Engineers: A KM case study
inferred← citeshttps://doi.org/10.31127/tuje.1496562openalex-snapshot
The Involvement of Project Stakeholders in the Briefing Process: Evaluations through a Construction Project
inferred← citeshttps://doi.org/10.31705/wcs.2023.19openalex-snapshot
Application of experiential knowledge and personal constructs into construction claims management
inferred← citeshttps://doi.org/10.3311/ccc2020-068openalex-snapshot
A BIM-Based Conceptual Model to Manage Knowledge in Construction Design
inferred← citeshttps://doi.org/10.3390/buildings13112745openalex-snapshot
Investigating Stakeholder Perspectives on the Knowledge Management of Construction Projects: A Case Study of the Vietnamese Construction Industry
inferred← citeshttps://doi.org/10.3390/ijerph17113928openalex-snapshot
A Decision Method for Construction Safety Risk Management Based on Ontology and Improved CBR: Example of a Subway Project
inferred← citeshttps://doi.org/10.3390/su16209074openalex-snapshot
BIM-Supported Knowledge Collaboration: A Case Study of a Highway Project in China
inferred← citeshttps://doi.org/10.3390/su7078132openalex-snapshot
Managing Knowledge to Promote Sustainability in Australian Transport Infrastructure Projects
inferred← citeshttps://doi.org/10.37190/arc230309openalex-snapshot
Briefing with artificial intelligence for requirement elicitation: Three cases with ChatGPT for exploration of possibilities
inferred← citeshttps://doi.org/10.37246/grid.1278725openalex-snapshot
Strategies for improving briefing framework: an evaluation study with industry practitioners
inferred← citeshttps://doi.org/10.3763/aedm.2010.0133openalex-snapshot
Linking Individual, Team and Organizational Learning in Construction Project Team Settings
inferred← citeshttps://doi.org/10.3990/1.9789036550420openalex-snapshot
The good, the bad and the tacit
inferred← citeshttps://doi.org/10.4018/978-1-4666-4185-3.ch005openalex-snapshot
Knowledge Management
inferred← citeshttps://doi.org/10.55927/jpp.v1i2.2085openalex-snapshot
The Axiology Aspect should be Encouraged, Not the Jargon as Kampung Inggris Sawai
inferred← citeshttps://doi.org/10.58837/chula.the.2018.130openalex-snapshot
Development of causal relationship model of knowledge sharing in construction projects
inferred← citeshttps://doi.org/10.59287/irapd.485openalex-snapshot
Requirement Elicitation with End User: A Case Study for Research Laboratory
inferred← citeshttps://doi.org/10.59287/pcsapd.341openalex-snapshot
Design and Construction of Anka Bilim School: A Review for Process
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.