On the public citation graph
Transmission Network Investment in Liberalized Power Markets
0 signed · 24 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What points at this work
Incoming claims: where this work appears in other papers’ reference lists and arguments.
inferred← citeshttps://doi.org/10.2139/ssrn.4523079openalex-extracted
A Negotiation Mechanism for Incentivizing Transmission Expansion Planning Considering Generation Expansion Planning Equilibrium
inferred← citeshttps://doi.org/10.1007/978-3-030-72040-7_9openalex-snapshot
A Survey on Modeling Approaches for Generation and Transmission Expansion Planning Analysis
inferred← citeshttps://doi.org/10.1016/j.apenergy.2023.121292openalex-snapshot
The social welfare effect of electricity user connection price policy reform
inferred← citeshttps://doi.org/10.1016/j.apenergy.2024.124721openalex-snapshot
Integrating local market operations into transmission investment: A tri-level optimization approach
inferred← citeshttps://doi.org/10.1016/j.bdr.2023.100417openalex-snapshot
Cost optimization model design of fresh food cold chain system in the context of big data
inferred← citeshttps://doi.org/10.1016/j.egyr.2022.09.168openalex-snapshot
Overview of transmission expansion planning in the market environment
inferred← citeshttps://doi.org/10.1016/j.egyr.2023.06.036openalex-snapshot
The levelized cost of energy and modifications for use in electricity generation planning
inferred← citeshttps://doi.org/10.1016/j.eneco.2020.105048openalex-snapshot
Generalized FTRs for hedging inter-nodal pricing risk
inferred← citeshttps://doi.org/10.1016/j.eneco.2022.106218openalex-snapshot
Putting wind and solar in their place: Internalising congestion and other system-wide costs with enhanced contracts for difference in Great Britain
inferred← citeshttps://doi.org/10.1016/j.eneco.2022.106351openalex-snapshot
Seven outstanding issues in energy network regulation
inferred← citeshttps://doi.org/10.1016/j.eneco.2024.108054openalex-snapshot
Transmission benefits and cost allocation under ambiguity
inferred← citeshttps://doi.org/10.1016/j.eneco.2025.108591openalex-snapshot
Can Proactive Electric Transmission Planning Cost-Effectively Mitigate Carbon Emissions? A Western North America Case Study
inferred← citeshttps://doi.org/10.1016/j.enpol.2023.113437openalex-snapshot
Overbuilding transmission: A case study and policy analysis of the Indian power sector
inferred← citeshttps://doi.org/10.1016/j.epsr.2024.110304openalex-snapshot
Grid-enhancing technologies: Progress, challenges, and future research directions
inferred← citeshttps://doi.org/10.1016/j.epsr.2024.110617openalex-snapshot
An incentive regulation approach for balancing stakeholder interests in transmission merchant investment
inferred← citeshttps://doi.org/10.1016/j.ijepes.2021.107432openalex-snapshot
Adaptive robust vulnerability analysis of power systems under uncertainty: A multilevel OPF-based optimization approach
inferred← citeshttps://doi.org/10.1016/j.jup.2024.101796openalex-snapshot
Merchant investment in electricity transmission networks
inferred← citeshttps://doi.org/10.1016/j.rser.2021.111056openalex-snapshot
Review of Cooperative Game Theory applications in power system expansion planning
inferred← citeshttps://doi.org/10.1016/j.softx.2024.101982openalex-snapshot
HOPE: Holistic Optimization Program for Electricity
inferred← citeshttps://doi.org/10.1016/j.tej.2020.106905openalex-snapshot
Shareholders v. ratepayers in New England
inferred← citeshttps://doi.org/10.1016/j.tej.2022.107110openalex-snapshot
How can energy storage catalyze GCC electricity policy? Issues and options
inferred← citeshttps://doi.org/10.1109/tpwrs.2021.3068052openalex-snapshot
Optimal Transmission Investment With Regulated Incentives Based Upon Forward Considerations of Firm and Intermittent Resources With Batteries
inferred← citeshttps://doi.org/10.3390/en14227753openalex-snapshot
Synergies between Renewable Energy and Flexibility Investments: A Case of a Medium-Sized Industry
inferred← citeshttps://doi.org/10.3390/en18133497openalex-snapshot
Optimisation Study of Investment Decision-Making in Distribution Networks of New Power Systems—Based on a Three-Level Decision-Making Model
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.