On the public citation graph

Multicriteria Scheduling : Theory, Models and Algorithms

0 signed · 532 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1016/0004-3702(91)90036-jopenalex-snapshot
Society of mind

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4571164openalex-extracted
inferred← citeshttps://doi.org/10.2139/ssrn.4845214openalex-extracted
Solver Based Heuristics for Rolling Stocks Corrective Maintenance Scheduling
inferred← citeshttps://doi.org/10.1002/9780470611432.ch1openalex-snapshot
Introduction to Flexibility and Robustness in Scheduling
inferred← citeshttps://doi.org/10.1002/9780470611432.ch10openalex-snapshot
Scheduling Operation Groups: A Multicriteria Approach to Provide Sequential Flexibility
inferred← citeshttps://doi.org/10.1002/9781118648766.ch4openalex-snapshot
Multi‐Criteria Optimization
inferred← citeshttps://doi.org/10.1002/9781118731598.ch4openalex-snapshot
A Comparison of Local Search Metaheuristics for a Hierarchical Flow Shop Optimization Problem with Time Lags
inferred← citeshttps://doi.org/10.1002/9781118731598.ch9openalex-snapshot
Metaheuristics for Biobjective Flow Shop Scheduling
inferred← citeshttps://doi.org/10.1002/mcda.1660openalex-snapshot
A Sort & Search method for multicriteria optimization problems with applications to scheduling theory
inferred← citeshttps://doi.org/10.1002/nav.20309openalex-snapshot
Scheduling multiple products on parallel machines with setup costs
inferred← citeshttps://doi.org/10.1002/nav.20488openalex-snapshot
Optimization of schedule stability and efficiency under processing time variability and random machine breakdowns in a job shop environment
inferred← citeshttps://doi.org/10.1002/nav.22103openalex-snapshot
Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work
inferred← citeshttps://doi.org/10.1002/net.20466openalex-snapshot
Column generation algorithm for sensor coverage scheduling under bandwidth constraints
inferred← citeshttps://doi.org/10.1002/net.21469openalex-snapshot
Balancing profits and costs on trees
inferred← citeshttps://doi.org/10.1002/net.22040openalex-snapshot
Min‐sum controllable risk problems with concave risk functions of the same value range
inferred← citeshttps://doi.org/10.1007/11508380_32openalex-snapshot
Towards a Coordination Model for Parallel Cooperative P2P Multi-objective Optimization
inferred← citeshttps://doi.org/10.1007/11730095_18openalex-snapshot
Multiobjective Scheduling of Jobs with Incompatible Families on Parallel Batch Machines
inferred← citeshttps://doi.org/10.1007/11785231_36openalex-snapshot
A New Inter-island Genetic Operator for Optimization Problems with Block Properties
inferred← citeshttps://doi.org/10.1007/3-540-32539-5_105openalex-snapshot
Ein System zur Lösung multikriterieller Probleme der Ablaufplanung
inferred← citeshttps://doi.org/10.1007/978-0-387-34747-9_50openalex-snapshot
Autonomous Search and Rescue Rotorcraft Mission Stochastic Planning with Generic DBNs
inferred← citeshttps://doi.org/10.1007/978-0-387-34747-9_51openalex-snapshot
Solving multi-objective scheduling problems—An integrated systems approach
inferred← citeshttps://doi.org/10.1007/978-1-4419-8191-2_20openalex-snapshot
Fuzzy Logic-Based Production Scheduling and Rescheduling in the Presence of Uncertainty
inferred← citeshttps://doi.org/10.1007/978-1-4471-4561-5openalex-snapshot
Online Scheduling in Manufacturing
inferred← citeshttps://doi.org/10.1007/978-1-4471-4561-5_2openalex-snapshot
Outline of Scheduling
inferred← citeshttps://doi.org/10.1007/978-1-4471-6272-8_1openalex-snapshot
Overview of Manufacturing Scheduling
inferred← citeshttps://doi.org/10.1007/978-1-4471-6272-8_10openalex-snapshot
Multi-Objective Scheduling
inferred← citeshttps://doi.org/10.1007/978-1-4471-6272-8_5openalex-snapshot
Objectives
inferred← citeshttps://doi.org/10.1007/978-1-4471-6272-8_8openalex-snapshot
Exact Algorithms
inferred← citeshttps://doi.org/10.1007/978-1-4614-1123-9_6openalex-snapshot
Just-in-Time Scheduling with Equal-Size Jobs
inferred← citeshttps://doi.org/10.1007/978-1-4614-4472-5_1openalex-snapshot
Introduction
inferred← citeshttps://doi.org/10.1007/978-1-4614-4472-5_2openalex-snapshot
Semiconductor Manufacturing Process Description
inferred← citeshttps://doi.org/10.1007/978-1-4614-4472-5_3openalex-snapshot
Modeling and Analysis Tools
inferred← citeshttps://doi.org/10.1007/978-1-4614-4472-5_4openalex-snapshot
Dispatching Approaches
inferred← citeshttps://doi.org/10.1007/978-1-4614-4472-5_5openalex-snapshot
Deterministic Scheduling Approaches
inferred← citeshttps://doi.org/10.1007/978-1-4614-4472-5_6openalex-snapshot
Order Release Approaches
inferred← citeshttps://doi.org/10.1007/978-1-4614-4472-5_7openalex-snapshot
Production Planning Approaches
inferred← citeshttps://doi.org/10.1007/978-1-4614-4472-5_8openalex-snapshot
State of the Practice and Future Needs for Production Planning and Control Systems
inferred← citeshttps://doi.org/10.1007/978-3-030-14568-2_1openalex-snapshot
Introduction
inferred← citeshttps://doi.org/10.1007/978-3-030-29821-0_19openalex-snapshot
An IP Formulation for a Machine-Sequencing Problem to Minimize Job Deviations and Set-Ups
inferred← citeshttps://doi.org/10.1007/978-3-030-45715-0_13openalex-snapshot
Fixed Jobs Multi-agent Scheduling Problem with Renewable Resources
inferred← citeshttps://doi.org/10.1007/978-3-030-50812-8openalex-snapshot
Multi-objective Management in Freight Logistics: Increasing Capacity, Service Level, Sustainability, and Safety with Optimization Algorithms
inferred← citeshttps://doi.org/10.1007/978-3-030-58808-3_46openalex-snapshot
Mixed Integer Linear Programming Models for Scheduling Elective Surgical Procedures
inferred← citeshttps://doi.org/10.1007/978-3-031-70984-5_6openalex-snapshot
Just in Time (JIT)
inferred← citeshttps://doi.org/10.1007/978-3-319-07124-4_44openalex-snapshot
Scheduling Heuristics
inferred← citeshttps://doi.org/10.1007/978-3-319-07153-4_44-1openalex-snapshot
Scheduling Heuristics
inferred← citeshttps://doi.org/10.1007/978-3-319-07956-1_6openalex-snapshot
Makespan Minimization on Multiple Machines Subject to Machine Unavailability and Total Completion Time Constraints
inferred← citeshttps://doi.org/10.1007/978-3-319-09174-7_17openalex-snapshot
A Constraint Generation Approach for the Two-Machine Flow Shop Problem with Jobs Selection
inferred← citeshttps://doi.org/10.1007/978-3-319-13826-8_7openalex-snapshot
Discrete Cuckoo Search Applied to Job Shop Scheduling Problem
inferred← citeshttps://doi.org/10.1007/978-3-319-27523-9_15openalex-snapshot
Multi-criteria Scheduling
inferred← citeshttps://doi.org/10.1007/978-3-319-27523-9_4openalex-snapshot
Multi-criteria Models and Decision-Making
inferred← citeshttps://doi.org/10.1007/978-3-319-41000-5_41openalex-snapshot
A Comparative Approach of Ant Colony System and Mathematical Programming for Task Scheduling in a Mineral Analysis Laboratory
inferred← citeshttps://doi.org/10.1007/978-3-319-54157-0_29openalex-snapshot
A Fitness Landscape Analysis of Pareto Local Search on Bi-objective Permutation Flowshop Scheduling Problems
inferred← citeshttps://doi.org/10.1007/978-3-319-98977-8_5openalex-snapshot
The Total Earliness/Tardiness Minimization on a Single Machine with Arbitrary Due Dates
inferred← citeshttps://doi.org/10.1007/978-3-540-30582-8_48openalex-snapshot
Comparison of Multipath Algorithms for Load Balancing in a MPLS Network
inferred← citeshttps://doi.org/10.1007/978-3-540-48584-1_7openalex-snapshot
An Evolutionary Approach for Solving the Multi-Objective Job-Shop Scheduling Problem
inferred← citeshttps://doi.org/10.1007/978-3-540-70928-2_36openalex-snapshot
Combinatorial Optimization of Stochastic Multi-objective Problems: An Application to the Flow-Shop Scheduling Problem
inferred← citeshttps://doi.org/10.1007/978-3-540-75771-9openalex-snapshot
Evolutionary Computation in Practice
inferred← citeshttps://doi.org/10.1007/978-3-540-75771-9_12openalex-snapshot
Technology Transfer: Academia to Industry
inferred← citeshttps://doi.org/10.1007/978-3-540-78532-3_2openalex-snapshot
Quantum-inspired genetic algorithms for flow shop scheduling
inferred← citeshttps://doi.org/10.1007/978-3-540-87700-4_68openalex-snapshot
The Parallel Predator-Prey Model: A Step towards Practical Application
inferred← citeshttps://doi.org/10.1007/978-3-642-02026-1_37openalex-snapshot
Bicriteria Scheduling on Single-Machine with Inventory Operations
inferred← citeshttps://doi.org/10.1007/978-3-642-02836-6_3openalex-snapshot
A Multi-Objective Ant-Colony Algorithm for Permutation Flowshop Scheduling to Minimize the Makespan and Total Flowtime of Jobs
inferred← citeshttps://doi.org/10.1007/978-3-642-02836-6_4openalex-snapshot
Multi-objective Simulated Annealing for Permutation Flow Shop Problems
inferred← citeshttps://doi.org/10.1007/978-3-642-02836-6_9openalex-snapshot
Scheduling Practice and Recent Developments in Flow Shop and Job Shop Scheduling
inferred← citeshttps://doi.org/10.1007/978-3-642-03751-1_11openalex-snapshot
A Study on Dominance-Based Local Search Approaches for Multiobjective Combinatorial Optimization
inferred← citeshttps://doi.org/10.1007/978-3-642-11218-8_5openalex-snapshot
ParadisEO-MOEO: A Software Framework for Evolutionary Multi-Objective Optimization
inferred← citeshttps://doi.org/10.1007/978-3-642-12052-7_5openalex-snapshot
Fuzzy Lead Time Management
inferred← citeshttps://doi.org/10.1007/978-3-642-17144-4_4openalex-snapshot
An Introduction to Multiobjective Metaheuristics for Scheduling and Timetabling
inferred← citeshttps://doi.org/10.1007/978-3-642-24270-0_32openalex-snapshot
Tradeoff Exploration between Reliability, Power Consumption, and Execution Time
inferred← citeshttps://doi.org/10.1007/978-3-642-32147-4_38openalex-snapshot
Two-Agent Scheduling on an Unbounded Serial Batching Machine
inferred← citeshttps://doi.org/10.1007/978-3-642-32726-1_10openalex-snapshot
On the Integration of Theoretical Single-Objective Scheduling Results for Multi-objective Problems
inferred← citeshttps://doi.org/10.1007/978-3-642-36318-4_7openalex-snapshot
An Introduction to Multicriteria Decision Aid: The PROMETHEE and GAIA Methods
inferred← citeshttps://doi.org/10.1007/978-3-642-38756-2_33openalex-snapshot
Bi-criteria Scheduling on Multiple Machines Subject to Machine Availability Constraints
inferred← citeshttps://doi.org/10.1007/978-3-642-41575-3_1openalex-snapshot
Two Agents Competing for a Shared Machine
inferred← citeshttps://doi.org/10.1007/978-3-642-41880-8_1openalex-snapshot
Multiagent Scheduling Fundamentals
inferred← citeshttps://doi.org/10.1007/978-3-642-41880-8_2openalex-snapshot
Problems, Algorithms and Complexity
inferred← citeshttps://doi.org/10.1007/978-3-642-41880-8_3openalex-snapshot
Single Machine Problems
inferred← citeshttps://doi.org/10.1007/978-3-642-41880-8_4openalex-snapshot
Batching Scheduling Problems
inferred← citeshttps://doi.org/10.1007/978-3-642-41880-8_5openalex-snapshot
Parallel Machine Scheduling Problems
inferred← citeshttps://doi.org/10.1007/978-3-642-41880-8_6openalex-snapshot
Scheduling Problems with Variable Job Processing Times
inferred← citeshttps://doi.org/10.1007/978-3-658-41751-2openalex-snapshot
Methoden des bestärkenden Lernens für die Produktionsablaufplanung
inferred← citeshttps://doi.org/10.1007/978-3-8349-6688-9_4openalex-snapshot
Mehrkriterielles Job-Shop-Scheduling mit alternativen Maschinenfolgen
inferred← citeshttps://doi.org/10.1007/978-3-8350-9064-4_4openalex-snapshot
Nachbarschaftssuche bei mehrkriteriellen Flow Shop Problemen
inferred← citeshttps://doi.org/10.1007/978-981-13-6557-7_3openalex-snapshot
Reliability-Aware Fault-Tolerant Scheduling
inferred← citeshttps://doi.org/10.1007/978-981-19-8851-6_56-1openalex-snapshot
Energy-Efficient Manufacturing Scheduling: A Systematic Literature Review
inferred← citeshttps://doi.org/10.1007/978-981-97-3820-5_56openalex-snapshot
Energy-Efficient Manufacturing Scheduling: A Systematic Literature Review
inferred← citeshttps://doi.org/10.1007/s00170-008-1395-7openalex-snapshot
A block approach to earliness-tardiness scheduling problems
inferred← citeshttps://doi.org/10.1007/s00170-008-1439-zopenalex-snapshot
Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times
inferred← citeshttps://doi.org/10.1007/s00170-008-1771-3openalex-snapshot
A fitness-based weighting mechanism for multicriteria flowshop scheduling using genetic algorithms
inferred← citeshttps://doi.org/10.1007/s00170-010-3094-4openalex-snapshot
Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects
inferred← citeshttps://doi.org/10.1007/s00291-007-0098-zopenalex-snapshot
A multi-objective iterated greedy search for flowshop scheduling with makespan and flowtime criteria
inferred← citeshttps://doi.org/10.1007/s00450-009-0062-zopenalex-snapshot
Multi-objective scheduling for real-time data warehouses
inferred← citeshttps://doi.org/10.1007/s00453-007-9091-9openalex-snapshot
Preemptive Scheduling on Uniform Parallel Machines with Controllable Job Processing Times
inferred← citeshttps://doi.org/10.1007/s10009-012-0263-9openalex-snapshot
Tradeoff exploration between reliability, power consumption, and execution time for embedded systems
inferred← citeshttps://doi.org/10.1007/s10100-010-0162-7openalex-snapshot
Job scheduling with forbidden setups and two objectives using genetic algorithms and penalties
inferred← citeshttps://doi.org/10.1007/s10287-016-0259-0openalex-snapshot
Direct solution to constrained tropical optimization problems with application to project scheduling
inferred← citeshttps://doi.org/10.1007/s10287-020-00374-5openalex-snapshot
Tropical optimization technique in bi-objective project scheduling under temporal constraints
inferred← citeshttps://doi.org/10.1007/s10288-005-0063-0openalex-snapshot
Counting and enumeration complexity with application to multicriteria scheduling
inferred← citeshttps://doi.org/10.1007/s10288-010-0137-5openalex-snapshot
Metaheuristics for multiobjective optimisation
inferred← citeshttps://doi.org/10.1007/s10288-013-0244-1openalex-snapshot
Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost
inferred← citeshttps://doi.org/10.1007/s10288-017-0341-7openalex-snapshot
Competitive multi-agent scheduling with an iterative selection rule
inferred← citeshttps://doi.org/10.1007/s10288-020-00434-1openalex-snapshot
Min-max controllable risk problems
inferred← citeshttps://doi.org/10.1007/s10288-021-00480-3openalex-snapshot
Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost
inferred← citeshttps://doi.org/10.1007/s10288-023-00535-7openalex-snapshot
An efficient iterated greedy algorithm for a multi-objective no-wait flow shop problem with sequence dependent setup times
inferred← citeshttps://doi.org/10.1007/s10479-006-0065-0openalex-snapshot
Setup coordination between two stages of a production system: A multi-objective evolutionary approach
inferred← citeshttps://doi.org/10.1007/s10479-012-1099-0openalex-snapshot
Two-agent scheduling on uniform parallel machines with min-max criteria
inferred← citeshttps://doi.org/10.1007/s10479-014-1770-8openalex-snapshot
Using the gravitational emulation local search algorithm to solve the multi-objective flexible dynamic job shop scheduling problem in Small and Medium Enterprises
inferred← citeshttps://doi.org/10.1007/s10479-015-1939-9openalex-snapshot
Tropical optimization problems with application to project scheduling with minimum makespan
inferred← citeshttps://doi.org/10.1007/s10479-015-2054-7openalex-snapshot
Single machine scheduling with two competing agents, arbitrary release dates and unit processing times
inferred← citeshttps://doi.org/10.1007/s10479-018-2775-5openalex-snapshot
Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic
inferred← citeshttps://doi.org/10.1007/s10479-019-03296-xopenalex-snapshot
A bi-criteria optimization model for medical device sterilization
inferred← citeshttps://doi.org/10.1007/s10479-021-04043-xopenalex-snapshot
Generating bicriteria schedules for correlated parallel machines involving tardy jobs and weighted completion time
inferred← citeshttps://doi.org/10.1007/s10479-024-06289-7openalex-snapshot
Moderate exponential-time algorithms for scheduling problems
inferred← citeshttps://doi.org/10.1007/s10479-024-06325-6openalex-snapshot
Scheduling technicians and tasks through an adaptive multi-objective biased random-key genetic algorithm
inferred← citeshttps://doi.org/10.1007/s10700-007-9026-6openalex-snapshot
Multi-objective genetic algorithm for single machine scheduling problem under fuzziness
inferred← citeshttps://doi.org/10.1007/s10732-011-9181-3openalex-snapshot
On dominance-based multiobjective local search: design, implementation and experimental analysis on scheduling and traveling salesman problems
inferred← citeshttps://doi.org/10.1007/s10732-018-9378-9openalex-snapshot
Multicriteria scheduling optimization using an elitist multiobjective population heuristic: the h-NSDE algorithm
inferred← citeshttps://doi.org/10.1007/s10845-008-0191-4openalex-snapshot
Heuristics for minimizing total completion time and maximum lateness on identical parallel machines with setup times
inferred← citeshttps://doi.org/10.1007/s10845-009-0370-yopenalex-snapshot
Ant colony optimization algorithm for a Bi-criteria 2-stage hybrid flowshop scheduling problem
inferred← citeshttps://doi.org/10.1007/s10845-013-0850-yopenalex-snapshot
Swarm lexicographic goal programming for fuzzy open shop scheduling
inferred← citeshttps://doi.org/10.1007/s10845-015-1129-2openalex-snapshot
An effective L-MONG algorithm for solving multi-objective flow-shop inverse scheduling problems
inferred← citeshttps://doi.org/10.1007/s10845-015-1141-6openalex-snapshot
Single machine interfering jobs problem with flowtime objective
inferred← citeshttps://doi.org/10.1007/s10852-007-9063-8openalex-snapshot
Combining Metaheuristics and Exact Methods for Solving Exactly Multi-objective Problems on the Grid
inferred← citeshttps://doi.org/10.1007/s10878-019-00507-wopenalex-snapshot
Bicriteria scheduling of equal length jobs on uniform parallel machines
inferred← citeshttps://doi.org/10.1007/s10878-019-00512-zopenalex-snapshot
Exponential time algorithms for just-in-time scheduling problems with common due date and symmetric weights
inferred← citeshttps://doi.org/10.1007/s10878-021-00697-2openalex-snapshot
Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work
inferred← citeshttps://doi.org/10.1007/s10878-025-01353-9openalex-snapshot
Bicriterion parallel-machine scheduling of equal-length jobs to minimize total tardiness and number of tardy jobs
inferred← citeshttps://doi.org/10.1007/s10951-005-6813-1openalex-snapshot
Pre-Emptive Scheduling Problems with Controllable Processing Times
inferred← citeshttps://doi.org/10.1007/s10951-007-0033-9openalex-snapshot
Bicriteria robotic cell scheduling
inferred← citeshttps://doi.org/10.1007/s10951-007-0049-1openalex-snapshot
A multi-criteria approach for scheduling semiconductor wafer fabrication facilities
inferred← citeshttps://doi.org/10.1007/s10951-009-0111-2openalex-snapshot
Parallel machine match-up scheduling with manufacturing cost considerations
inferred← citeshttps://doi.org/10.1007/s10951-009-0112-1openalex-snapshot
Theoretical aspects of multicriteria flight gate scheduling: deterministic and fuzzy models
inferred← citeshttps://doi.org/10.1007/s10951-009-0157-1openalex-snapshot
A university-timetabling problem and its solution using Benders’ partitioning—a case study
inferred← citeshttps://doi.org/10.1007/s10951-010-0201-1openalex-snapshot
Scheduling two agents on uniform parallel machines with makespan and cost functions
inferred← citeshttps://doi.org/10.1007/s10951-010-0208-7openalex-snapshot
A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates
inferred← citeshttps://doi.org/10.1007/s10951-011-0252-yopenalex-snapshot
Single-machine multi-agent scheduling problems with a global objective function
inferred← citeshttps://doi.org/10.1007/s10951-011-0256-7openalex-snapshot
Multi-criteria scheduling: an agent-based approach for expert knowledge integration
inferred← citeshttps://doi.org/10.1007/s10951-012-0303-zopenalex-snapshot
A survey on offline scheduling with rejection
inferred← citeshttps://doi.org/10.1007/s10951-012-0304-yopenalex-snapshot
Scheduling satellite launch missions: an MILP approach
inferred← citeshttps://doi.org/10.1007/s10951-013-0311-7openalex-snapshot
Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption
inferred← citeshttps://doi.org/10.1007/s10951-014-0386-9openalex-snapshot
Multipurpose machine scheduling with rejection and identical job processing times
inferred← citeshttps://doi.org/10.1007/s10951-014-0410-0openalex-snapshot
Two-agent scheduling with agent specific batches on an unbounded serial batching machine
inferred← citeshttps://doi.org/10.1007/s10951-014-0414-9openalex-snapshot
Scheduling two agent task chains with a central selection mechanism
inferred← citeshttps://doi.org/10.1007/s10951-015-0459-4openalex-snapshot
MP or not MP: that is the question
inferred← citeshttps://doi.org/10.1007/s10951-017-0551-zopenalex-snapshot
Parallel machine makespan minimization subject to machine availability and total completion time constraints
inferred← citeshttps://doi.org/10.1007/s10951-018-0588-7openalex-snapshot
An approximation scheme for the bi-scenario sum of completion times trade-off problem
inferred← citeshttps://doi.org/10.1007/s10951-019-00610-0openalex-snapshot
Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times
inferred← citeshttps://doi.org/10.1007/s10951-019-00630-wopenalex-snapshot
A review of four decades of time-dependent scheduling: main results, new topics, and open problems
inferred← citeshttps://doi.org/10.1007/s10951-021-00711-9openalex-snapshot
Tabu search for a parallel-machine scheduling problem with periodic maintenance, job rejection and weighted sum of completion times
inferred← citeshttps://doi.org/10.1007/s10951-023-00781-xopenalex-snapshot
Bicriteria two-machine flowshop scheduling: approximation algorithms and their limits
inferred← citeshttps://doi.org/10.1007/s10951-023-00795-5openalex-snapshot
A review and classification of scheduling objectives in unpaced flow shops for discrete manufacturing
inferred← citeshttps://doi.org/10.1007/s10951-024-00812-1openalex-snapshot
Scheduling two interfering job sets on identical parallel machines with makespan and total completion time minimization
inferred← citeshttps://doi.org/10.1007/s11227-018-2248-2openalex-snapshot
HYSTERY: a hybrid scheduling and mapping approach to optimize temperature, energy consumption and lifetime reliability of heterogeneous multiprocessor systems
inferred← citeshttps://doi.org/10.1007/s11269-015-1200-yopenalex-snapshot
Multi-Objective Optimization Model for the Allocation of Water Resources in Arid Regions Based on the Maximization of Socioeconomic Efficiency
inferred← citeshttps://doi.org/10.1007/s11277-019-06128-0openalex-snapshot
An Online Cost-Based Job Scheduling Method by Cellular Automata in Cloud Computing Environment
inferred← citeshttps://doi.org/10.1007/s11573-020-01000-1openalex-snapshot
Energy costs vs. carbon dioxide emissions in short-term production planning
inferred← citeshttps://doi.org/10.1007/s11590-006-0020-7openalex-snapshot
Heuristic for a new multiobjective scheduling problem
inferred← citeshttps://doi.org/10.1007/s11590-014-0796-9openalex-snapshot
A new approach for bicriteria partitioning problem
inferred← citeshttps://doi.org/10.1007/s11590-017-1141-xopenalex-snapshot
Complexities of four problems on two-agent scheduling
inferred← citeshttps://doi.org/10.1007/s11590-020-01576-1openalex-snapshot
A note on competing-agent Pareto-scheduling
inferred← citeshttps://doi.org/10.1007/s12351-012-0125-yopenalex-snapshot
A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
inferred← citeshttps://doi.org/10.1007/s12351-015-0193-xopenalex-snapshot
The single machine serial batch scheduling problems with rejection
inferred← citeshttps://doi.org/10.1007/s12351-015-0195-8openalex-snapshot
Multiobjective large scale job sequencing optimization based on a synergy of compensatory and non compensatory methods
inferred← citeshttps://doi.org/10.1007/s12351-019-00468-2openalex-snapshot
Decomposition based extended project scheduling for make-to-order production
inferred← citeshttps://doi.org/10.1007/s12351-023-00799-1openalex-snapshot
Bicriteria fabrication scheduling of two-component jobs on a single machine
inferred← citeshttps://doi.org/10.1007/s12351-024-00880-3openalex-snapshot
Algebraic solution of project scheduling problems with temporal constraints
inferred← citeshttps://doi.org/10.1007/s40305-022-00403-xopenalex-snapshot
Single-Machine Preemptive Scheduling with Release Dates Involving the Total Weighted Late Work Criterion
inferred← citeshttps://doi.org/10.1007/springerreference_72263openalex-snapshot
Flow Shop Scheduling Problem
inferred← citeshttps://doi.org/10.1016/b978-1-78548-311-0.50006-xopenalex-snapshot
Optimization Issues in Chemotherapy Delivery
inferred← citeshttps://doi.org/10.1016/j.adhoc.2010.09.011openalex-snapshot
Achieving Max–Min lifetime and fairness with rate allocation for data aggregation in sensor networks
inferred← citeshttps://doi.org/10.1016/j.advengsoft.2011.05.015openalex-snapshot
Solving a bi-objective flowshop scheduling problem by a Multi-objective Immune System and comparing with SPEA2+ and SPGA
inferred← citeshttps://doi.org/10.1016/j.aime.2024.100144openalex-snapshot
A simulated annealing metaheuristic approach to hybrid flow shop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.amc.2006.01.068openalex-snapshot
Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach
inferred← citeshttps://doi.org/10.1016/j.amc.2014.05.048openalex-snapshot
Single-machine bicriterion group scheduling with deteriorating setup times and job processing times
inferred← citeshttps://doi.org/10.1016/j.amc.2019.124688openalex-snapshot
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
inferred← citeshttps://doi.org/10.1016/j.artint.2015.05.006openalex-snapshot
Constrained clustering by constraint programming
inferred← citeshttps://doi.org/10.1016/j.asoc.2016.12.041openalex-snapshot
Modelling and scheduling multi-objective flow shop problems with interfering jobs
inferred← citeshttps://doi.org/10.1016/j.asoc.2017.08.014openalex-snapshot
A bi-objective batch processing problem with dual-resources on unrelated-parallel machines
inferred← citeshttps://doi.org/10.1016/j.asoc.2018.07.011openalex-snapshot
A decomposition-based kernel of Mallows models algorithm for bi- and tri-objective permutation flowshop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.asoc.2020.106480openalex-snapshot
Grey Wolf production scheduling for the capital goods industry
inferred← citeshttps://doi.org/10.1016/j.ast.2006.09.001openalex-snapshot
Application of hybrid metaheuristics in sensor management
inferred← citeshttps://doi.org/10.1016/j.cam.2024.116380openalex-snapshot
Polynomial time algorithms to find Pareto optimal schedules of bicriteria lot scheduling problems with splitable jobs on a single parallel-batch machine
inferred← citeshttps://doi.org/10.1016/j.camwa.2012.02.051openalex-snapshot
On optimizing a bi-objective flowshop scheduling problem in an uncertain environment
inferred← citeshttps://doi.org/10.1016/j.cie.2009.12.009openalex-snapshot
A novel artificial immune system for solving multiobjective scheduling problems subject to special process constraint
inferred← citeshttps://doi.org/10.1016/j.cie.2011.05.013openalex-snapshot
Decision support for multi-objective flow shop scheduling by the Pareto Iterated Local Search methodology
inferred← citeshttps://doi.org/10.1016/j.cie.2013.02.018openalex-snapshot
On the identical parallel-machine rescheduling with job rework disruption
inferred← citeshttps://doi.org/10.1016/j.cie.2014.12.001openalex-snapshot
A dispatching rule-based genetic algorithm for multi-objective job shop scheduling using fuzzy satisfaction levels
inferred← citeshttps://doi.org/10.1016/j.cie.2017.07.029openalex-snapshot
A further study on two-agent scheduling on an unbounded serial-batch machine with batch delivery cost
inferred← citeshttps://doi.org/10.1016/j.cie.2021.107525openalex-snapshot
Bicriteria scheduling to minimize total late work and maximum tardiness with preemption
inferred← citeshttps://doi.org/10.1016/j.cie.2022.107969openalex-snapshot
Preemptive scheduling to minimize total weighted late work and weighted number of tardy jobs
inferred← citeshttps://doi.org/10.1016/j.cie.2022.108040openalex-snapshot
Two-stage no-wait hybrid flow shop with inter-stage flexibility for operating room scheduling
inferred← citeshttps://doi.org/10.1016/j.cie.2023.109618openalex-snapshot
A novel indicator for sustainability in production planning using Center of Gravity-based assessment of Pareto fronts
inferred← citeshttps://doi.org/10.1016/j.cie.2025.111065openalex-snapshot
The generalized energy-aware flexible job shop scheduling model: A constraint programming approach
inferred← citeshttps://doi.org/10.1016/j.compind.2018.10.010openalex-snapshot
The design space of production planning and control for industry 4.0
inferred← citeshttps://doi.org/10.1016/j.cor.2003.12.002openalex-snapshot
Earliness–tardiness scheduling with setup considerations
inferred← citeshttps://doi.org/10.1016/j.cor.2004.07.016openalex-snapshot
Pareto and scalar bicriterion optimization in scheduling deteriorating jobs
inferred← citeshttps://doi.org/10.1016/j.cor.2005.02.006openalex-snapshot
Best compromise solution for a new multiobjective scheduling problem
inferred← citeshttps://doi.org/10.1016/j.cor.2005.02.032openalex-snapshot
A bicriterion approach to time/cost trade-offs in scheduling with convex resource-dependent job processing times and release dates
inferred← citeshttps://doi.org/10.1016/j.cor.2005.09.014openalex-snapshot
Parallel partitioning method (PPM): A new exact method to solve bi-objective problems
inferred← citeshttps://doi.org/10.1016/j.cor.2005.11.021openalex-snapshot
Minimizing total earliness and tardiness on a single machine using a hybrid heuristic
inferred← citeshttps://doi.org/10.1016/j.cor.2007.07.007openalex-snapshot
Bicriterion scheduling with equal processing times on a batch processing machine
showing the first 200 of 531 · page through all 531
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.