On the public citation graph

Sequencing of parts and robot moves in a robotic cell

0 signed · 295 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/1520-6750(198710)34:5<721::aid-nav3220340512>3.0.co;2-hopenalex-snapshot
Complexity of sequencing tasks in assembly cells attended by one or two robots
inferredcites →https://doi.org/10.1002/rob.4620040105openalex-snapshot
Movement coordination for single‐track robot systems
inferredcites →https://doi.org/10.1007/978-3-642-48708-8openalex-snapshot
Minimax Algebra
inferredcites →https://doi.org/10.1007/bf00167515openalex-snapshot
A scheduling model for multirobot assembly cells
inferredcites →https://doi.org/10.1007/bf00186470openalex-snapshot
A knowledge-based system for the strategic control level of robots in flexible manufacturing cells
inferredcites →https://doi.org/10.1007/bf02248590openalex-snapshot
Dynamic analysis of repetitive decision-free discreteevent processes: The algebra of timed marked graphs and algorithmic issues
inferredcites →https://doi.org/10.1007/bf03543074openalex-snapshot
Dynamic analysis of repetitive decision-free discrete—Event processes: Applications to production systems
inferredcites →https://doi.org/10.1080/00207548508904690openalex-snapshot
A structure for sequencing robot activities in machine tending applications
inferredcites →https://doi.org/10.1080/00207548508904774openalex-snapshot
Performance evaluation of a flexible manufacturing cell with random multiproduct feedback flow
inferredcites →https://doi.org/10.1080/00207548808947876openalex-snapshot
Cyclic scheduling for improvement
inferredcites →https://doi.org/10.1080/00207548908942561openalex-snapshot
Operational characteristics of multi-robot systems with cooperation
inferredcites →https://doi.org/10.1080/03155986.1987.11732027openalex-snapshot
Mathematical Analysis Of A Robotized Production Cell
inferredcites →https://doi.org/10.1080/07408178408974693openalex-snapshot
On Optimizing Bin Picking and Insertion Plans for Assembly Robots
inferredcites →https://doi.org/10.1108/eb004786openalex-snapshot
Operating and idle times for cyclic multi‐machine servicing
inferredcites →https://doi.org/10.1109/70.88013openalex-snapshot
Operational analysis of an autonomous assembly robotic station
inferredcites →https://doi.org/10.1109/tac.1985.1103925openalex-snapshot
A linear-system-theoretic view of discrete-event processes and its use for performance evaluation in manufacturing
inferredcites →https://doi.org/10.1115/1.3140740openalex-snapshot
Coordination of Robots Sharing Assembly Tasks
inferredcites →https://doi.org/10.1115/1.3454046openalex-snapshot
Optimal Programming of Working Cycles for Industrial Robots
inferredcites →https://doi.org/10.1137/0217053openalex-snapshot
Efficient Solutions to Some Transportation Problems with Applications to Minimizing Robot Arm Travel
inferredcites →https://doi.org/10.1147/rd.294.0401openalex-snapshot
Scheduling algorithms for flexible flow lines
inferredcites →https://doi.org/10.1287/opre.12.5.655openalex-snapshot
Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.1126092openalex-extracted
inferred← citeshttps://doi.org/10.2139/ssrn.1128744openalex-extracted
A Note on Productivity Gains in Flexible Robotic Cells
inferred← citeshttps://doi.org/10.2139/ssrn.2559376openalex-extracted
A (10/7)-Approximation Algorithm for an Optimum Cyclic Solution in Additive Travel-Time Robotic Cells
inferred← citeshttps://doi.org/10.1002/(sici)1099-1425(199901/02)2:1<35::aid-jos15>3.0.co;2-jopenalex-snapshot
Cyclic scheduling in 3-machine robotic flow shops
inferred← citeshttps://doi.org/10.1002/9781118600283.ch4openalex-snapshot
Production Planning
inferred← citeshttps://doi.org/10.1002/9781119005384.biblioopenalex-snapshot
General Bibliography
inferred← citeshttps://doi.org/10.1002/9781119005384.ch4openalex-snapshot
Production Planning
inferred← citeshttps://doi.org/10.1002/9781119036821.ch8openalex-snapshot
Modeling, Analysis, Scheduling, and Control of Cluster Tools in Semiconductor Fabrication
inferred← citeshttps://doi.org/10.1002/asjc.2429openalex-snapshot
MPC‐based robust contouring control for a robotic machining system
inferred← citeshttps://doi.org/10.1007/0-387-33815-2openalex-snapshot
Stochastic processes, optimization, and control theory : applications in financial engineering, queueing networks, and manufacturing systems : a volume in honor of Suresh Sethi
inferred← citeshttps://doi.org/10.1007/11925231_41openalex-snapshot
A Polynomial Algorithm for 2-Cyclic Robotic Scheduling
inferred← citeshttps://doi.org/10.1007/3-540-32539-5_113openalex-snapshot
Robotic Cells: Configurations, Conjectures and Cycle Functions
inferred← citeshttps://doi.org/10.1007/978-1-4613-1187-4_8openalex-snapshot
Layout planning in cellular manufacturing
inferred← citeshttps://doi.org/10.1007/978-1-4614-1123-9_5openalex-snapshot
Mixed-Integer Programming Models for Flowshop Scheduling Problems Minimizing the Total Earliness and Tardiness
inferred← citeshttps://doi.org/10.1007/978-1-4614-5152-5_6openalex-snapshot
The No-Wait Flow Shop
inferred← citeshttps://doi.org/10.1007/978-3-030-27652-2_4openalex-snapshot
On Estimating LON-Based Measures in Cyclic Assignment Problem in Non-permutational Flow Shop Scheduling Problem
inferred← citeshttps://doi.org/10.1007/978-3-030-76307-7_17openalex-snapshot
A Branch-and-Bound Method to Minimize the Total Flow Time in a Permutation Flow Shop with Blocking and Setup Times
inferred← citeshttps://doi.org/10.1007/978-3-030-85902-2_54openalex-snapshot
FMS Scheduling Integration for Mass Customization
inferred← citeshttps://doi.org/10.1007/978-3-031-24457-5_36openalex-snapshot
A Novel Mathematical Model for Mixed-Blocking Permutation Flow Shop Scheduling Problem with Batch Delivery
inferred← citeshttps://doi.org/10.1007/978-3-031-36121-0_12openalex-snapshot
A Branch-and-Bound for the Blocking Permutation Flow Shop with Total Tardiness Criterion
inferred← citeshttps://doi.org/10.1007/978-3-319-04705-8_33openalex-snapshot
A New Constructive Heuristic for the Fm|block|ΣT
inferred← citeshttps://doi.org/10.1007/978-3-319-15702-3_26openalex-snapshot
Modelling a Robotic Cell and Analysis Its Throughput by Petri Nets
inferred← citeshttps://doi.org/10.1007/978-3-319-31093-0_13openalex-snapshot
Robotics and Control Systems
inferred← citeshttps://doi.org/10.1007/978-3-642-46955-8_26openalex-snapshot
The 1-part m-machine cyclic scheduling problem in robotic cells
inferred← citeshttps://doi.org/10.1007/978-3-642-56656-1_46openalex-snapshot
Steuerung und Optimierung von Cluster Tools in der Halbleiterfertigung
inferred← citeshttps://doi.org/10.1007/978-3-642-58300-1_57openalex-snapshot
Scheduling in Robotic Cells
inferred← citeshttps://doi.org/10.1007/bf01324877openalex-snapshot
Schedule efficiency in a robotic production cell
inferred← citeshttps://doi.org/10.1007/s00170-017-1470-zopenalex-snapshot
An optimization model for cyclic scheduling problem in flexible robotic cells
inferred← citeshttps://doi.org/10.1007/s00291-006-0040-9openalex-snapshot
Cyclic hoist scheduling in large real-life electroplating lines
inferred← citeshttps://doi.org/10.1007/s10479-020-03526-7openalex-snapshot
Increasing flexibility and productivity in Industry 4.0 production networks with autonomous mobile robots and smart intralogistics
inferred← citeshttps://doi.org/10.1007/s10489-019-01457-wopenalex-snapshot
A discrete gravitational search algorithm for the blocking flow shop problem with total flow time minimization
inferred← citeshttps://doi.org/10.1007/s10696-005-5991-7openalex-snapshot
A note on productivity gains in flexible robotic cells
inferred← citeshttps://doi.org/10.1007/s10696-023-09528-4openalex-snapshot
Energy efficient scheduling of a two machine robotic cell producing multiple part types
inferred← citeshttps://doi.org/10.1007/s10732-010-9127-1openalex-snapshot
On the asymptotic behavior of subtour-patching heuristics in solving the TSP on permuted Monge matrices
inferred← citeshttps://doi.org/10.1007/s10845-011-0505-9openalex-snapshot
Cyclic scheduling of a robotic flexible cell with load lock and swap
inferred← citeshttps://doi.org/10.1007/s10878-005-1778-8openalex-snapshot
Robotic-Cell Scheduling: Special Polynomially Solvable Cases of the Traveling Salesman Problem on Permuted Monge Matrices
inferred← citeshttps://doi.org/10.1007/s10951-005-2861-9openalex-snapshot
Sequencing and Scheduling in Robotic Cells: Recent Developments
inferred← citeshttps://doi.org/10.1007/s10951-005-5314-6openalex-snapshot
Scheduling in Reentrant Robotic Cells: Algorithms and Complexity
inferred← citeshttps://doi.org/10.1007/s10951-006-8501-1openalex-snapshot
A faster polynomial algorithm for 2-cyclic robotic scheduling
inferred← citeshttps://doi.org/10.1007/s10951-007-0033-9openalex-snapshot
Bicriteria robotic cell scheduling
inferred← citeshttps://doi.org/10.1007/s10951-015-0448-7openalex-snapshot
Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times
inferred← citeshttps://doi.org/10.1007/s10951-022-00762-6openalex-snapshot
An improved approximation algorithm for a scheduling problem with transporter coordination
inferred← citeshttps://doi.org/10.1007/s11740-017-0784-xopenalex-snapshot
Mobile robot scheduling for cycle time optimization in flow-shop cells, a case study
inferred← citeshttps://doi.org/10.1016/0166-218x(95)00039-topenalex-snapshot
On a scheduling problem in a robotized analytical system
inferred← citeshttps://doi.org/10.1016/0166-218x(95)00114-7openalex-snapshot
Batch scheduling in a two-machine flow shop with limited buffer
inferred← citeshttps://doi.org/10.1016/0278-6125(95)98882-7openalex-snapshot
Scheduling single-gripper gantry robots in tightly coupled serial production lines: Optimum vs. push/pull concept based sequences
inferred← citeshttps://doi.org/10.1016/0377-2217(93)90026-jopenalex-snapshot
Manufacturing cell operating characteristics
inferred← citeshttps://doi.org/10.1016/0377-2217(93)90247-kopenalex-snapshot
The complexity of scheduling jobs in repetitive manufacturing systems
inferred← citeshttps://doi.org/10.1016/0377-2217(94)90002-7openalex-snapshot
Scheduling with resource management in manufacturing systems
inferred← citeshttps://doi.org/10.1016/j.apm.2015.11.021openalex-snapshot
Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times
inferred← citeshttps://doi.org/10.1016/j.apm.2017.11.018openalex-snapshot
An estimation of distribution algorithm for scheduling problem of flexible manufacturing systems using Petri nets
inferred← citeshttps://doi.org/10.1016/j.asej.2012.11.002openalex-snapshot
Scheduling and sequencing in four machines robotic cell: Application of genetic algorithm and enumeration techniques
inferred← citeshttps://doi.org/10.1016/j.asoc.2023.110219openalex-snapshot
Discrete komodo algorithm for traveling salesman problem
inferred← citeshttps://doi.org/10.1016/j.cie.2010.03.013openalex-snapshot
Complexity of cyclic scheduling problems: A state-of-the-art survey
inferred← citeshttps://doi.org/10.1016/j.cie.2015.04.013openalex-snapshot
Efficient heuristic algorithms for the blocking flow shop scheduling problem with total flow time minimization
inferred← citeshttps://doi.org/10.1016/j.cie.2017.02.009openalex-snapshot
A framework for stochastic scheduling of two-machine robotic rework cells with in-process inspection system
inferred← citeshttps://doi.org/10.1016/j.cie.2017.08.005openalex-snapshot
Cyclic job shop robotic cell scheduling problem: Ant colony optimization
inferred← citeshttps://doi.org/10.1016/j.cie.2020.106511openalex-snapshot
An improved lower bound for the blocking permutation flow shop with total completion time criterion
inferred← citeshttps://doi.org/10.1016/j.cie.2024.110672openalex-snapshot
Dynamic workload balancing to part input sequencing for integrated scheduling decision-making of flexible manufacturing systems
inferred← citeshttps://doi.org/10.1016/j.cor.2005.09.015openalex-snapshot
Scheduling in a three-machine robotic flexible manufacturing cell
inferred← citeshttps://doi.org/10.1016/j.cor.2007.10.007openalex-snapshot
Pure cycles in flexible robotic cells
inferred← citeshttps://doi.org/10.1016/j.cor.2009.06.025openalex-snapshot
Bicriteria robotic operation allocation in a flexible manufacturing cell
inferred← citeshttps://doi.org/10.1016/j.cor.2010.09.005openalex-snapshot
An analysis of cyclic scheduling problems in robot centered cells
inferred← citeshttps://doi.org/10.1016/j.cor.2011.10.007openalex-snapshot
A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times
inferred← citeshttps://doi.org/10.1016/j.cor.2012.04.008openalex-snapshot
A branch and bound algorithm for the cyclic job-shop problem with transportation
inferred← citeshttps://doi.org/10.1016/j.cor.2012.09.006openalex-snapshot
Two-machine robotic cell scheduling problem with sequence-dependent setup times
inferred← citeshttps://doi.org/10.1016/j.cor.2016.03.007openalex-snapshot
Multi-degree cyclic flow shop robotic cell scheduling problem: Ant colony optimization
inferred← citeshttps://doi.org/10.1016/j.cor.2017.09.018openalex-snapshot
Cyclic scheduling of parts and robot moves in m-machine robotic cells
inferred← citeshttps://doi.org/10.1016/j.cor.2026.107470openalex-snapshot
Robotic flow shop scheduling problem with combined buffer conditions
inferred← citeshttps://doi.org/10.1016/j.dam.2004.02.012openalex-snapshot
Robotic cell scheduling with operational flexibility
inferred← citeshttps://doi.org/10.1016/j.dam.2008.03.021openalex-snapshot
Identical part production in cyclic robotic cells: Concepts, overview and open questions
inferred← citeshttps://doi.org/10.1016/j.dam.2008.03.025openalex-snapshot
A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case
inferred← citeshttps://doi.org/10.1016/j.ejor.2003.07.011openalex-snapshot
A linear time approximation algorithm for movement minimization in conveyor flow shop processing
inferred← citeshttps://doi.org/10.1016/j.ejor.2003.09.013openalex-snapshot
Approximation algorithms for k-unit cyclic solutions in robotic cells
inferred← citeshttps://doi.org/10.1016/j.ejor.2004.06.040openalex-snapshot
A review of TSP based approaches for flowshop scheduling
inferred← citeshttps://doi.org/10.1016/j.ejor.2004.09.019openalex-snapshot
Scheduling dual gripper robotic cell: One-unit cycles
inferred← citeshttps://doi.org/10.1016/j.ejor.2005.03.021openalex-snapshot
Cyclic scheduling of a 2-machine robotic cell with tooling constraints
inferred← citeshttps://doi.org/10.1016/j.ejor.2006.07.030openalex-snapshot
Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints
inferred← citeshttps://doi.org/10.1016/j.ejor.2010.03.002openalex-snapshot
Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models
inferred← citeshttps://doi.org/10.1016/j.ejor.2018.01.034openalex-snapshot
On the existence of dominating 6-cyclic schedules in four-machine robotic cells
inferred← citeshttps://doi.org/10.1016/j.eswa.2011.01.093openalex-snapshot
A predictive approach for dispatching of tasks in a pull-type robotic cell
inferred← citeshttps://doi.org/10.1016/j.eswa.2015.03.026openalex-snapshot
An efficient Discrete Artificial Bee Colony algorithm for the blocking flow shop problem with total flowtime minimization
inferred← citeshttps://doi.org/10.1016/j.eswa.2016.05.040openalex-snapshot
A computational evaluation of constructive and improvement heuristics for the blocking flow shop to minimise total flowtime
inferred← citeshttps://doi.org/10.1016/j.eswa.2017.01.006openalex-snapshot
Efficient heuristics for the parallel blocking flow shop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.eswa.2018.12.039openalex-snapshot
An iterated greedy algorithm for solving the total tardiness parallel blocking flow shop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.eswa.2021.115535openalex-snapshot
An iterated greedy algorithm for the parallel blocking flow shop scheduling problem and sequence-dependent setup times
inferred← citeshttps://doi.org/10.1016/j.ifacol.2016.07.599openalex-snapshot
Good Production Cycles for Circular Robotic Cells
inferred← citeshttps://doi.org/10.1016/j.ijpe.2011.10.006openalex-snapshot
Multiple part-type scheduling in flexible robotic cells
inferred← citeshttps://doi.org/10.1016/j.ijpe.2020.107615openalex-snapshot
Search algorithm of the assembly sequence of products by using past learning results
inferred← citeshttps://doi.org/10.1016/j.jmsy.2015.03.003openalex-snapshot
Optimal multi-degree cyclic scheduling of multiple robots without overlapping in robotic flowshops with parallel machines
inferred← citeshttps://doi.org/10.1016/j.omega.2007.01.003openalex-snapshot
Some heuristic algorithms for total tardiness minimization in a flowshop with blocking
inferred← citeshttps://doi.org/10.1016/j.rcim.2003.10.003openalex-snapshot
Minimum makespan task sequencing with multiple shared resources
inferred← citeshttps://doi.org/10.1016/j.rcim.2010.02.002openalex-snapshot
Robotic material handler scheduling in flexible manufacturing systems for mass customization
inferred← citeshttps://doi.org/10.1016/j.rcim.2015.09.001openalex-snapshot
Sensitivity-analysis based method in single-robot cells cost-effective design and optimization
inferred← citeshttps://doi.org/10.1016/j.rcim.2017.03.004openalex-snapshot
Pure cycles in two-machine dual-gripper robotic cells
inferred← citeshttps://doi.org/10.1016/j.rcim.2019.02.002openalex-snapshot
Energy conscious scheduling of a material handling robot in a manufacturing cell
inferred← citeshttps://doi.org/10.1016/j.rcim.2021.102207openalex-snapshot
Bicriteria scheduling of a material handling robot in an m -machine cell to minimize the energy consumption of the robot and the cycle time
inferred← citeshttps://doi.org/10.1016/j.robot.2017.01.009openalex-snapshot
Scheduling of two-machine robotic rework cells: In-process, post-process and in-line inspection scenarios
inferred← citeshttps://doi.org/10.1016/j.robot.2017.09.020openalex-snapshot
Approximate optimal method for cyclic solutions in multi-robotic cell with processing time window
inferred← citeshttps://doi.org/10.1016/j.swevo.2016.02.001openalex-snapshot
A new cuckoo search algorithm for 2-machine robotic cell scheduling problem with sequence-dependent setup times
inferred← citeshttps://doi.org/10.1016/s0166-218x(00)00316-4openalex-snapshot
Makespan minimization for flow-shop problems with transportation times and a single robot
inferred← citeshttps://doi.org/10.1016/s0166-218x(99)00206-1openalex-snapshot
Parallel machine scheduling with a common server
inferred← citeshttps://doi.org/10.1016/s0167-6377(00)00046-8openalex-snapshot
Part sequencing in three-machine no-wait robotic cells
inferred← citeshttps://doi.org/10.1016/s0360-8352(97)00325-2openalex-snapshot
Petri net modeling and scheduling for cyclic job shops with blocking
inferred← citeshttps://doi.org/10.1016/s0377-2217(96)00333-5openalex-snapshot
Scheduling in robotic cells: Complexity and steady state analysis
inferred← citeshttps://doi.org/10.1016/s0377-2217(96)00388-8openalex-snapshot
Combinatorial optimization models for production scheduling in automated manufacturing systems
inferred← citeshttps://doi.org/10.1016/s0377-2217(99)00258-1openalex-snapshot
Scheduling no-wait robotic cells with two and three machines
inferred← citeshttps://doi.org/10.1016/s0895-7177(01)00084-xopenalex-snapshot
Cycles and permutations in robotic cells
inferred← citeshttps://doi.org/10.1016/s0898-1221(99)00157-1openalex-snapshot
Timed petri nets in modeling and analysis of simple schedules for manufacturing cells
inferred← citeshttps://doi.org/10.1016/s0925-5273(01)00132-3openalex-snapshot
Optimal moves of the material handling system in a robotic cell
inferred← citeshttps://doi.org/10.1016/s1474-6670(17)36624-7openalex-snapshot
Dynamic Scheduling for Minimal Flow Time and Maximum Reliability *
inferred← citeshttps://doi.org/10.1016/s1474-6670(17)39492-2openalex-snapshot
Testing Module for Cyclic Robotic Cells
inferred← citeshttps://doi.org/10.1016/s1474-6670(17)40593-3openalex-snapshot
Hierarchical Derivation of Schedules for Manufacturing Cells
inferred← citeshttps://doi.org/10.1023/a:1007930010707openalex-snapshot
Sequencing of Parts in Robotic Cells
inferred← citeshttps://doi.org/10.1023/a:1008045414118openalex-snapshot
Cyclic Scheduling of Operations for a Part Type in an FMS Handled by a Single Robot: A Parametric Critical-Path Approach
inferred← citeshttps://doi.org/10.1023/a:1009613700772openalex-snapshot
A Genetic Approach for Solving a Scheduling Problem in a Robotized Analytical System
inferred← citeshttps://doi.org/10.1023/a:1012260622596openalex-snapshot
A taboo search approach for deadlock-free scheduling of automated manufacturing systems
inferred← citeshttps://doi.org/10.1023/a:1018909801944openalex-snapshot
Current trends in deterministic scheduling
inferred← citeshttps://doi.org/10.1023/a:1018921310489openalex-snapshot
A two-phase approach for design of supervisory controllers for robot cells: Model checking and Markov decision models
inferred← citeshttps://doi.org/10.1023/a:1018936219150openalex-snapshot
Design and operational issues in AGV-served manufacturing systems
inferred← citeshttps://doi.org/10.1023/a:1018952722784openalex-snapshot
Scheduling large robotic cells without buffers
inferred← citeshttps://doi.org/10.1023/a:1018980928352openalex-snapshot
Minimizing the number of robots to meet a given cyclic schedule
inferred← citeshttps://doi.org/10.1023/a:1018995317468openalex-snapshot
Cyclic scheduling in robotic flowshops
inferred← citeshttps://doi.org/10.1023/a:1020911406530openalex-snapshot
Steady-State Analysis and Scheduling of Cyclic Job Shops with Overtaking
inferred← citeshttps://doi.org/10.1023/a:1023952906934openalex-snapshot
A Classification for Hoist Scheduling Problems
inferred← citeshttps://doi.org/10.1023/a:1024008726557openalex-snapshot
Complexity of One-Cycle Robotic Flow-Shops
inferred← citeshttps://doi.org/10.1023/b:flex.0000036033.12568.5eopenalex-snapshot
The Lazy Cook Problem, or Scheduling Two Parallel Machines to Optimize Vehicle Utilization
inferred← citeshttps://doi.org/10.1023/b:josh.0000036861.28456.5dopenalex-snapshot
Robotic Cells with Parallel Machines: Throughput Maximization in Constant Travel-Time Cells
inferred← citeshttps://doi.org/10.1051/ro/2019116openalex-snapshot
Scheduling job shop problems with operators with respect to the maximum lateness
inferred← citeshttps://doi.org/10.1057/jors.2009.158openalex-snapshot
Transforming part-sequencing problems in a robotic cell into a GTSP
inferred← citeshttps://doi.org/10.1080/00207540500337544openalex-snapshot
Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots
inferred← citeshttps://doi.org/10.1080/00207540601100262openalex-snapshot
Scheduling in robotic cells: process flexibility and cell layout
inferred← citeshttps://doi.org/10.1080/00207540802552659openalex-snapshot
Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
inferred← citeshttps://doi.org/10.1080/00207540903225205openalex-snapshot
A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows
inferred← citeshttps://doi.org/10.1080/00207540903280556openalex-snapshot
Minimising idle times in cluster tools in the semiconductor industry
inferred← citeshttps://doi.org/10.1080/00207540903491799openalex-snapshot
Bicriteria robotic cell scheduling with controllable processing times
inferred← citeshttps://doi.org/10.1080/00207543.2011.588268openalex-snapshot
On the optimality of 1-unit cycles in flow-shop networks
inferred← citeshttps://doi.org/10.1080/00207543.2011.596999openalex-snapshot
Sequencing and scheduling in a three-machine robotic cell
inferred← citeshttps://doi.org/10.1080/00207543.2011.642823openalex-snapshot
Cycle time analysis in reentrant robotic cells with swap ability
inferred← citeshttps://doi.org/10.1080/00207543.2013.802390openalex-snapshot
An efficient iterated local search algorithm for the total tardiness blocking flow shop problem
inferred← citeshttps://doi.org/10.1080/00207543.2013.828164openalex-snapshot
A modified shifting bottleneck heuristic and disjunctive graph for job shop scheduling problems with transportation constraints
inferred← citeshttps://doi.org/10.1080/00207543.2014.883471openalex-snapshot
Scheduling rotationally arranged robotic cells served by a multi-function robot
inferred← citeshttps://doi.org/10.1080/00207543.2017.1397792openalex-snapshot
A review of recent theoretical development in scheduling dual-gripper robotic cells
inferred← citeshttps://doi.org/10.1080/00207543.2021.1887533openalex-snapshot
Reinforcement learning for robotic flow shop scheduling with processing time variations
inferred← citeshttps://doi.org/10.1080/00207543.2021.1894369openalex-snapshot
Simultaneous part input sequencing and robot scheduling for mass customisation
inferred← citeshttps://doi.org/10.1080/00207543.2023.2217272openalex-snapshot
Investigation of scheduling integration of flexible manufacturing systems for mass customisation
inferred← citeshttps://doi.org/10.1080/00207543.2026.2709145openalex-snapshot
Enhancing manufacturing flexibility and efficiency through AMR-facilitated shared robotic arms in extended robotic flow shop
inferred← citeshttps://doi.org/10.1080/00207549608905099openalex-snapshot
Sequencing of robot activities and parts in two-machine robotic cells
inferred← citeshttps://doi.org/10.1080/03155986.1999.11732366openalex-snapshot
On A Conjecture About Robotic Cells: New Simplified Proof For The Three-Machine Case
inferred← citeshttps://doi.org/10.1080/07408170590885279openalex-snapshot
Minimizing cycle time in large robotic cells
inferred← citeshttps://doi.org/10.1080/07408170590918290openalex-snapshot
Two-machine shop scheduling with an uncapacitated interstage transporter
inferred← citeshttps://doi.org/10.1080/07408170600735587openalex-snapshot
A (10/7)-approximation algorithm for an optimum cyclic solution in additive travel-time robotic cells
inferred← citeshttps://doi.org/10.1080/07408170801965108openalex-snapshot
Robotic cells with parallel machines and multiple dual gripper robots: a comparative overview
inferred← citeshttps://doi.org/10.1080/07408170902789092openalex-snapshot
Throughput optimization in dual-gripper interval robotic cells
inferred← citeshttps://doi.org/10.1080/0740817x.2010.491505openalex-snapshot
Robotic cells with stochastic processing times
inferred← citeshttps://doi.org/10.1080/0740817x.2011.618174openalex-snapshot
Scheduling robotic cells served by a dual-arm robot
inferred← citeshttps://doi.org/10.1080/0740817x.2014.937019openalex-snapshot
Approximations to optimal sequences in single-gripper and dual-gripper robotic cells with circular layouts
inferred← citeshttps://doi.org/10.1080/0740817x.2015.1047475openalex-snapshot
Scheduling in two-machine robotic cells with a self-buffered robot
inferred← citeshttps://doi.org/10.1080/0951192x.2012.684722openalex-snapshot
Analysis of flexible robotic cells with improved pure cycle
inferred← citeshttps://doi.org/10.1080/0951192x.2013.874576openalex-snapshot
Scheduling multiple parts in hybrid flow shop robotic cells served by a single robot
inferred← citeshttps://doi.org/10.1080/0951192x.2014.964322openalex-snapshot
Bottleneck-based scheduling method of multi-robot cells with residency constraints
inferred← citeshttps://doi.org/10.1080/0951192x.2016.1210231openalex-snapshot
Multi-degree cyclic flow shop robotic cell scheduling problem with multiple robots
inferred← citeshttps://doi.org/10.1080/0951192x.2017.1305504openalex-snapshot
Scheduling method of robotic cells with robot-collaborated process and residency constraints
inferred← citeshttps://doi.org/10.1080/0951192x.2020.1718767openalex-snapshot
Wafer sojourn time fluctuation analysis for time-constrained dual-arm multi-cluster tools with activity time variation
inferred← citeshttps://doi.org/10.1080/15458830.1996.11770744openalex-snapshot
Lot Scheduling in a Two-Machine Cell with Swapping Devices
inferred← citeshttps://doi.org/10.1080/17509653.2007.10671024openalex-snapshot
Scheduling of two and three machine robotic cells with fuzzy methodology
inferred← citeshttps://doi.org/10.1109/70.781993openalex-snapshot
Multiple-part cyclic hoist scheduling using a sieve method
inferred← citeshttps://doi.org/10.1109/70.938389openalex-snapshot
Scheduling in dual gripper robotic cells for productivity gains
inferred← citeshttps://doi.org/10.1109/70.975998openalex-snapshot
Geometric approach and taboo search for scheduling flexible manufacturing systems
inferred← citeshttps://doi.org/10.1109/70.988976openalex-snapshot
Multicyclic hoist scheduling with constant processing times
inferred← citeshttps://doi.org/10.1109/access.2017.2763778openalex-snapshot
Petri Net-Based Efficient Determination of Optimal Schedules for Transport-Dominant Single-Arm Multi-Cluster Tools
inferred← citeshttps://doi.org/10.1109/coase.2016.7743573openalex-snapshot
Optimal scheduling analysis of treelike hybrid multi-cluster tools
inferred← citeshttps://doi.org/10.1109/coase.2016.7743574openalex-snapshot
Optimal one-wafer cyclic scheduling analysis of transport-dominant single-arm multi-cluster tools
inferred← citeshttps://doi.org/10.1109/coase.2019.8843254openalex-snapshot
Implementation of a Rapidly Executing Robot Controller
inferred← citeshttps://doi.org/10.1109/etfa.1995.496672openalex-snapshot
Application of timed Petri nets to modeling the schedules of manufacturing cells
inferred← citeshttps://doi.org/10.1109/etfa.1996.573255openalex-snapshot
A two-phase approach for design of supervisory controllers for robot cells: model checking and Markov decision models
inferred← citeshttps://doi.org/10.1109/etfa.1996.573319openalex-snapshot
Hierarchies of place/transition refinements in Petri nets
inferred← citeshttps://doi.org/10.1109/iccie.2009.5223704openalex-snapshot
On scheduling models: An overview
inferred← citeshttps://doi.org/10.1109/iccie.2010.5668353openalex-snapshot
Hybrid genetic algorithms for flowshop scheduling with synchronous material movement
inferred← citeshttps://doi.org/10.1109/icinfa.2014.6932643openalex-snapshot
Hybrid algorithm based scheduling optimization in robotic cell with dual-gripper
inferred← citeshttps://doi.org/10.1109/icnsc.2015.7116047openalex-snapshot
Modeling and scheduling of cluster tools dealing with wafer revisiting: A brief review
inferred← citeshttps://doi.org/10.1109/icra.2014.6907030openalex-snapshot
LCM cycle based optimal scheduling in robotic cell with parallel workstations
inferred← citeshttps://doi.org/10.1109/icsmc.1994.400029openalex-snapshot
Throughput analysis of manufacturing cells using timed Petri nets
inferred← citeshttps://doi.org/10.1109/icsmc.1995.538096openalex-snapshot
An iterative method for scheduling a FMS
inferred← citeshttps://doi.org/10.1109/icsmc.1995.538097openalex-snapshot
Schedules of flexible manufacturing cells and their timed colored Petri net models
inferred← citeshttps://doi.org/10.1109/icsmc.1996.561407openalex-snapshot
Cyclic part scheduling in a robotic cell
inferred← citeshttps://doi.org/10.1109/icsmc.1996.561440openalex-snapshot
Composite schedules of manufacturing cells and their timed Petri net models
inferred← citeshttps://doi.org/10.1109/icsmc.1999.823326openalex-snapshot
Hierarchical derivation of Petri net models of composite schedules for manufacturing cells
inferred← citeshttps://doi.org/10.1109/icsmc.2000.884461openalex-snapshot
Hierarchical analysis of manufacturing systems using Petri nets
inferred← citeshttps://doi.org/10.1109/iecon.2013.6699837openalex-snapshot
Cyclic scheduling in small-scale robotic cells served by a multi-function robot
inferred← citeshttps://doi.org/10.1109/ieem.2007.4419281openalex-snapshot
Considering a cyclic multiple-part type three-machine robotic cell problem
inferred← citeshttps://doi.org/10.1109/ieem.2013.6962472openalex-snapshot
Cyclic production for robotic cells served by multi-function robots with resumable processing regime
inferred← citeshttps://doi.org/10.1109/ieem.2015.7385820openalex-snapshot
Resolution of deadlocks in a robotic cell scheduling problem with post-process inspection system: Avoidance and recovery scenarios
inferred← citeshttps://doi.org/10.1109/iesm.2015.7380142openalex-snapshot
Efficient constructive procedures for the distributed blocking flow shop scheduling problem
inferred← citeshttps://doi.org/10.1109/isatp.2001.928999openalex-snapshot
Looking for optimum feeding sequences in a manufacturing cell with four parallel machines
inferred← citeshttps://doi.org/10.1109/isie.1996.551091openalex-snapshot
Optimal schedules of manufacturing cells-modeling and analysis using timed Petri nets
inferred← citeshttps://doi.org/10.1109/jas.2017.7510772openalex-snapshot
Polynomial approach to optimal one-wafer cyclic scheduling of treelike hybrid multi-cluster tools via Petri nets
inferred← citeshttps://doi.org/10.1109/mwscas.1993.343219openalex-snapshot
Timed Petri net models of flexible manufacturing cells
inferred← citeshttps://doi.org/10.1109/oceans.2004.1406327openalex-snapshot
A design of 2-DOF gripper circuit for deep-sea objects
inferred← citeshttps://doi.org/10.1109/pnpm.1999.796556openalex-snapshot
Stepwise refinements of net models and their place invariants
showing the first 200 of 274 · page through all 274
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.