On the public citation graph
A new algorithm for the solution of multi-state dynamic programming problems
0 signed · 158 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1080/03155986.1973.11731546openalex-snapshot
A Two-Stage Algorithm For Sequential Decision Problems
inferredcites →https://doi.org/10.1109/tct.1964.1082221openalex-snapshot
V. Adaptive Control Processes
inferredcites →https://doi.org/10.2307/1909424openalex-snapshot
Nonlinear Programming: A Unified Approach
inferredcites →https://doi.org/10.2307/2343701openalex-snapshot
Nonlinear Programming: A Unified Approach.
What points at this work
Incoming claims: where this work appears in other papers’ reference lists and arguments.
inferred← citeshttps://doi.org/10.2139/ssrn.4766775openalex-extracted
Multiscale Optimal Dispatching Model of a Reservoir Group Coupled with Ecological Peak-Making
inferred← citeshttps://doi.org/10.2139/ssrn.4833006openalex-extracted
Multiscale Optimal Dispatching Model of a Reservoir Group Coupled with Ecological Peak-Making
inferred← citeshttps://doi.org/10.1002/0470848944.hsa016openalex-snapshot
Evolutionary Computing in Hydrological Sciences
inferred← citeshttps://doi.org/10.1002/j.1551-8833.1995.tb06393.xopenalex-snapshot
Computer‐generated optimal pumping schedule
inferred← citeshttps://doi.org/10.1007/978-3-031-66505-9_41openalex-snapshot
Research on Reservoir Optimization Operation Method Based on Multiple Water Use Plans
inferred← citeshttps://doi.org/10.1007/978-3-642-23756-0_78openalex-snapshot
Study of the Optimal Water Resources Allocation Scenarios in Pingxiang City
inferred← citeshttps://doi.org/10.1007/978-981-13-9779-0_73openalex-snapshot
Decomposition Model Framework of Trading Volume of Cascade Hydropower Stations Under the Linking Mode of Medium-Long Term and Spot Market
inferred← citeshttps://doi.org/10.1007/bf00932862openalex-snapshot
A new algorithm for solving certain variational problems
inferred← citeshttps://doi.org/10.1007/bf02576907openalex-snapshot
Un algoritmo per allocazioni ottimali di risorse in sistemi con vincoli lineari
inferred← citeshttps://doi.org/10.1007/s10098-020-01896-xopenalex-snapshot
Complementary operation of a small cascade hydropower station group and photovoltaic power stations
inferred← citeshttps://doi.org/10.1007/s10898-017-0541-xopenalex-snapshot
Adaptive block coordinate DIRECT algorithm
inferred← citeshttps://doi.org/10.1007/s11269-010-9707-8openalex-snapshot
Deriving Optimal Refill Rules for Multi-Purpose Reservoir Operation
inferred← citeshttps://doi.org/10.1007/s11269-010-9755-0openalex-snapshot
Optimization of Multireservoir Systems by Genetic Algorithm
inferred← citeshttps://doi.org/10.1007/s11269-014-0610-6openalex-snapshot
Operating Rules Derivation of Jinsha Reservoirs System with Parameter Calibrated Support Vector Regression
inferred← citeshttps://doi.org/10.1007/s11269-015-1175-8openalex-snapshot
Optimal Operation of Multi-reservoir Systems Considering Time-lags of Flood Routing
inferred← citeshttps://doi.org/10.1007/s11269-017-1662-1openalex-snapshot
Long-Term Generation Scheduling of Hydropower System Using Multi-Core Parallelization of Particle Swarm Optimization
inferred← citeshttps://doi.org/10.1007/s11269-020-02726-xopenalex-snapshot
Use of a Multi-Objective Correlation Index to Analyze the Power Generation, Water Supply and Ecological Flow Mutual Feedback Relationship of a Reservoir
inferred← citeshttps://doi.org/10.1007/s11269-021-02803-9openalex-snapshot
Optimal Operation of a Parallel Multireservoir System for Flood Control using a Stagewise Compensation Method
inferred← citeshttps://doi.org/10.1007/s11269-021-02846-yopenalex-snapshot
Long-Term Joint Operation of Cascade Reservoirs Using Enhanced Progressive Optimality Algorithm and Dynamic Programming Hybrid Approach
inferred← citeshttps://doi.org/10.1007/s11269-022-03189-yopenalex-snapshot
A Triple-stage Operation Method for Deriving Operation Rules for Cascade Reservoirs during Catastrophic Flood Events
inferred← citeshttps://doi.org/10.1007/s11269-022-03333-8openalex-snapshot
Optimal Energy Storage Operation Chart and Output Distribution of Cascade Reservoirs Based on Operating Rules Derivation
inferred← citeshttps://doi.org/10.1007/s11269-023-03622-wopenalex-snapshot
Stable Improved Dynamic Programming Method: An Efficient and Accurate Method for Optimization of Reservoir Flood Control Operation
inferred← citeshttps://doi.org/10.1007/s11269-024-03864-2openalex-snapshot
Boosting Progressive Optimality Algorithm Performance in Optimizing Complex Large-Scale Multi-Reservoir System Operations by Using Discrepant Optimization Windows and Disturbance-Response Strategy
inferred← citeshttps://doi.org/10.1007/s11269-025-04264-wopenalex-snapshot
Adaptive Reservoir Operation Considering Real-time Forecasting: Application of Two-stage Coordinated Control Risk Hedging Principle
inferred← citeshttps://doi.org/10.1007/s11269-025-04433-xopenalex-snapshot
Hierarchical Framework for Reservoir Co-management: A Cross-scale Reservoir Dispatch Paradigm Balancing Energy and Morphogenic Flow Needs
inferred← citeshttps://doi.org/10.1007/s11431-010-4170-6openalex-snapshot
Inter-basin water transfer-supply model and risk analysis with consideration of rainfall forecast information
inferred← citeshttps://doi.org/10.1016/0005-1098(80)90055-2openalex-snapshot
Dynamic programming algorithm for optimizing distributed parameter trajectories with constraints
inferred← citeshttps://doi.org/10.1016/0022-1694(84)90152-5openalex-snapshot
Multipurpose reservoir operation
inferred← citeshttps://doi.org/10.1016/0022-1694(84)90153-7openalex-snapshot
Multipurpose reservoir operation
inferred← citeshttps://doi.org/10.1016/0096-3003(91)90016-gopenalex-snapshot
Optimality tests for partitioning and sectional search algorithms
inferred← citeshttps://doi.org/10.1016/0167-6377(83)90043-3openalex-snapshot
A new algorithm for multi-dimensional dynamic programming problems
inferred← citeshttps://doi.org/10.1016/0898-1221(88)90189-7openalex-snapshot
Dynamic programming, reduction of dimensionality and eigenvalue problems
inferred← citeshttps://doi.org/10.1016/b978-0-08-041263-4.50068-3openalex-snapshot
DECOMPOSITION OF DYNAMIC PROGRAMMING BY NONLINEAR PROGRAMMING AND PARALLEL PROCESSING††Project supported by the science funds of the National Science Foundation of China.
inferred← citeshttps://doi.org/10.1016/b978-0-12-568150-6.50009-xopenalex-snapshot
COMPUTATIONAL ADVANCES IN DYNAMIC PROGRAMMING
inferred← citeshttps://doi.org/10.1016/j.advwatres.2019.07.003openalex-snapshot
Improved dynamic programming for parallel reservoir system operation optimization
inferred← citeshttps://doi.org/10.1016/j.advwatres.2022.104253openalex-snapshot
Improved progressive optimality algorithm and its application to determination of optimal release trajectory of long-term power generation operation of cascade reservoirs
inferred← citeshttps://doi.org/10.1016/j.agsy.2025.104562openalex-snapshot
Comprehensive review of optimization and surrogate models for agricultural water resources and reservoir water management
inferred← citeshttps://doi.org/10.1016/j.apenergy.2018.07.078openalex-snapshot
Boosting hydropower output of mega cascade reservoirs using an evolutionary algorithm with successive approximation
inferred← citeshttps://doi.org/10.1016/j.apenergy.2019.04.090openalex-snapshot
Short-term optimal operation of hydro-wind-solar hybrid system with improved generative adversarial networks
inferred← citeshttps://doi.org/10.1016/j.enconman.2014.04.065openalex-snapshot
Improved decomposition–coordination and discrete differential dynamic programming for optimization of large-scale hydropower system
inferred← citeshttps://doi.org/10.1016/j.enconman.2015.08.009openalex-snapshot
Long-term generation scheduling of Xiluodu and Xiangjiaba cascade hydro plants considering monthly streamflow forecasting error
inferred← citeshttps://doi.org/10.1016/j.enconman.2025.120185openalex-snapshot
Intelligent algorithm-assisted short-term load economic distribution at the unit level of a cascaded hydropower station
inferred← citeshttps://doi.org/10.1016/j.energy.2017.09.131openalex-snapshot
China’ energy-water nexus: Hydropower generation potential of joint operation of the Three Gorges and Qingjiang cascade reservoirs
inferred← citeshttps://doi.org/10.1016/j.energy.2021.119960openalex-snapshot
Dynamic programming with successive approximation and relaxation strategy for long-term joint power generation scheduling of large-scale hydropower station group
inferred← citeshttps://doi.org/10.1016/j.energy.2025.135867openalex-snapshot
Application of a multi-reservoir dynamic collaborative optimization strategy based on extrema marginal benefits for optimizing reservoir operation
inferred← citeshttps://doi.org/10.1016/j.energy.2025.139356openalex-snapshot
A scenario-based multi-agent reinforcement learning approach for efficient solving to long-term optimization of cascade hydropower reservoirs
inferred← citeshttps://doi.org/10.1016/j.envsoft.2014.02.018openalex-snapshot
Parallel discrete differential dynamic programming for multireservoir operation
inferred← citeshttps://doi.org/10.1016/j.est.2026.121874openalex-snapshot
Enhancing grid flexibility through cascade hybrid pumped storage hydropower with multiple retrofitted pumping stations: A nested multi-timescale scheduling model
inferred← citeshttps://doi.org/10.1016/j.est.2026.123834openalex-snapshot
Unlocking flexibility without new reservoirs: Nested long- and short-term scheduling for a hybrid pumped storage system coupled with photovoltaic in Southwest China
inferred← citeshttps://doi.org/10.1016/j.jclepro.2022.133271openalex-snapshot
Water-sediment-energy joint operation model of large-scale reservoir group for sediment-laden rivers
inferred← citeshttps://doi.org/10.1016/j.jher.2013.01.002openalex-snapshot
Study on the optimal hydropower generation of Zhelin reservoir
inferred← citeshttps://doi.org/10.1016/j.jhydrol.2016.02.055openalex-snapshot
Dynamic equilibrium strategy for drought emergency temporary water transfer and allocation management
inferred← citeshttps://doi.org/10.1016/j.jhydrol.2017.06.044openalex-snapshot
Multi-objective reservoir operation during flood season considering spillway optimization
inferred← citeshttps://doi.org/10.1016/j.jhydrol.2020.125013openalex-snapshot
Future hydropower generation prediction of large-scale reservoirs in the upper Yangtze River basin under climate change
inferred← citeshttps://doi.org/10.1016/j.jhydrol.2021.126444openalex-snapshot
Spark-based parallel dynamic programming and particle swarm optimization via cloud computing for a large-scale reservoir system
inferred← citeshttps://doi.org/10.1016/j.jhydrol.2023.129803openalex-snapshot
Discussion on the monotonicity principle of the two-stage problem in joint optimal operation of cascade hydropower stations
inferred← citeshttps://doi.org/10.1016/j.micron.2017.03.018openalex-snapshot
A hybrid 3D SEM reconstruction method optimized for complex geologic material surfaces
inferred← citeshttps://doi.org/10.1016/j.renene.2026.125773openalex-snapshot
Short-term peak-shaving strategies for cascade hydropower against evolving net load in systems with high VRE penetration
inferred← citeshttps://doi.org/10.1016/j.rser.2012.01.056openalex-snapshot
Operation challenges for fast-growing China's hydropower systems and respondence to energy saving and emission reduction
inferred← citeshttps://doi.org/10.1016/j.scitotenv.2023.162918openalex-snapshot
Calculation and evaluation of suitable ecological flows for eco-environmental recovery of cascade-developed rivers
inferred← citeshttps://doi.org/10.1016/j.ultramic.2018.12.013openalex-snapshot
A boosted decision tree approach to shadow detection in scanning electron microscope (SEM) images for machine vision applications
inferred← citeshttps://doi.org/10.1016/j.watres.2022.119350openalex-snapshot
Optimization of in-pipe storage capacity use in urban drainage systems with improved DP considering the time lag of flow routing
inferred← citeshttps://doi.org/10.1016/s1474-6670(17)51947-3openalex-snapshot
Decomposition of Dynamic Programming by Nonlinear Programming and Parallel Processing
inferred← citeshttps://doi.org/10.1016/s1474-6670(17)55065-xopenalex-snapshot
A Convergence Theory of Algorithms for Multicriteria Optimal Control and Nonlinear Programming
inferred← citeshttps://doi.org/10.1016/s1474-6670(17)65181-4openalex-snapshot
Hydro-Thermal Scheduling with Cascaded and Pumped Storage Plants
inferred← citeshttps://doi.org/10.1023/a:1008030612068openalex-snapshot
Genetic Algorithms for Optimal Operation of Soil Aquifer Treatment Systems
inferred← citeshttps://doi.org/10.1023/a:1017501703105openalex-snapshot
Convergence of a Block Coordinate Descent Method for Nondifferentiable Minimization
inferred← citeshttps://doi.org/10.1029/wr017i003p00481openalex-snapshot
Optimal short‐term hydro scheduling from the principle of progressive optimality
inferred← citeshttps://doi.org/10.1029/wr021i005p00619openalex-snapshot
Dynamic model for multireservoir operation
inferred← citeshttps://doi.org/10.1029/wr021i005p00631openalex-snapshot
Quadratic model for reservoir management: Application to the Central Valley Project
inferred← citeshttps://doi.org/10.1029/wr021i009p01456openalex-snapshot
Short‐Term Hydroelectric Scheduling Using the Progressive Optimality Algorithm
inferred← citeshttps://doi.org/10.1029/wr021i012p01797openalex-snapshot
Reservoir Management and Operations Models: A State‐of‐the‐Art Review
inferred← citeshttps://doi.org/10.1051/matecconf/201824601003openalex-snapshot
Comparative Study of Optimization Algorithms for The Optimal Reservoir Operation
inferred← citeshttps://doi.org/10.1061/(asce)0733-9496(1989)115:6(735)openalex-snapshot
Optimal Operation of Water Distribution Systems
inferred← citeshttps://doi.org/10.1061/(asce)0733-9496(1996)122:5(374)openalex-snapshot
Optimization of Water Supply System Operation
inferred← citeshttps://doi.org/10.1061/(asce)0887-3801(2000)14:4(255)openalex-snapshot
Multireservoir Systems Optimization Using Genetic Algorithms: Case Study
inferred← citeshttps://doi.org/10.1061/(asce)wr.1943-5452.0000174openalex-snapshot
Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head
inferred← citeshttps://doi.org/10.1061/(asce)wr.1943-5452.0000622openalex-snapshot
Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints
inferred← citeshttps://doi.org/10.1061/(asce)wr.1943-5452.0000715openalex-snapshot
Stochastic Programming with a Joint Chance Constraint Model for Reservoir Refill Operation Considering Flood Risk
inferred← citeshttps://doi.org/10.1061/(asce)wr.1943-5452.0000771openalex-snapshot
Power Generation Scheduling for Integrated Large and Small Hydropower Plant Systems in Southwest China
inferred← citeshttps://doi.org/10.1061/(asce)wr.1943-5452.0000882openalex-snapshot
Optimizing Hydropower Reservoirs Operation via an Orthogonal Progressive Optimality Algorithm
inferred← citeshttps://doi.org/10.1061/41114(371)268openalex-snapshot
Deriving Near-Optimal Solutions to Deterministic Reservoir Operation Problems
inferred← citeshttps://doi.org/10.1061/41173(414)6openalex-snapshot
Short-Term Generation Scheduling for Hydropower Systems with Discrepant Objectives
inferred← citeshttps://doi.org/10.1061/9780784412947.215openalex-snapshot
Key Technologies to Design and Develop Optimized Operation System for Large-Scale Hydropower Stations of China
inferred← citeshttps://doi.org/10.1061/9780784412947.217openalex-snapshot
Some Practical Strategies and Methods for Large-Scale Hydropower System Operations in China
inferred← citeshttps://doi.org/10.1061/9780784479162.183openalex-snapshot
A Generalized Decision Support System for Short-Term Scheduling of China’s Big Hydropower Systems
inferred← citeshttps://doi.org/10.1061/9780784480595.042openalex-snapshot
Optimal Operation of Cascade Hydropower Plants in Deregulated Electricity Market: A Case Study of Lancang River in China
inferred← citeshttps://doi.org/10.1061/9780784480595.058openalex-snapshot
Optimal Operations of Hydropower Plants Crossing Provincial Power Grids
inferred← citeshttps://doi.org/10.1080/00207728408926542openalex-snapshot
Optimal discharge policy of multi-reservoir linked system using successive variations
inferred← citeshttps://doi.org/10.1080/03052159008941156openalex-snapshot
DYNAMIC PROGRAMMING, REDUCTION OF DIMENSIONALITY AND EIGENVALUE PROBLEMS—II. MULTIDIMENSIONAL CASE
inferred← citeshttps://doi.org/10.1080/10807039.2019.1603075openalex-snapshot
Ecological reservoir operation based on DFM and improved PA-DDS algorithm: A case study in Jinsha river, China
inferred← citeshttps://doi.org/10.1109/59.32582openalex-snapshot
A method to eliminate solution trapping in applying progressive optimality principle to short-term hydrothermal scheduling
inferred← citeshttps://doi.org/10.1109/59.336075openalex-snapshot
Price-based ramp-rate model for dynamic dispatch and unit commitment
inferred← citeshttps://doi.org/10.1109/59.736302openalex-snapshot
A dynamic programming two-stage algorithm for long-term hydrothermal scheduling of multireservoir systems
inferred← citeshttps://doi.org/10.1109/9.100944openalex-snapshot
Two new techniques for optimal control
inferred← citeshttps://doi.org/10.1109/appeec.2012.6307005openalex-snapshot
Short Term Optimization of Cascade Reservoirs Operation Considering Flow Routing
inferred← citeshttps://doi.org/10.1109/caman.2011.5778774openalex-snapshot
Long Term Generation Optimization Using Stochastic Dynamic Programming
inferred← citeshttps://doi.org/10.1109/cca.1993.348355openalex-snapshot
Application and analysis of spatio-temporal decompositions by nonserial dynamic programming
inferred← citeshttps://doi.org/10.1109/ccsse.2017.8087968openalex-snapshot
Optimal operation of hydropower station using improved immune genetic algorithm
inferred← citeshttps://doi.org/10.1109/csss.2011.5972085openalex-snapshot
Research on reservoir optimal operation based on dynamic programming model
inferred← citeshttps://doi.org/10.1109/icnc.2009.182openalex-snapshot
Particle Swarm Optimization Based on Cultural Algorithm for Short-Term Optimal Operation of Cascade Hydropower Stations
inferred← citeshttps://doi.org/10.1109/icsmc.1992.271565openalex-snapshot
Solving multistage decision problems with non-separable performance indices via successive approximation
inferred← citeshttps://doi.org/10.1109/mper.1981.5511434openalex-snapshot
Optimal Hydrothermal Scheduling With Cascaded Plants Using Progressive Optimality Algorithm
inferred← citeshttps://doi.org/10.1109/tpas.1981.316486openalex-snapshot
Optimal Hydrothermal Scheduling with Cascaded Plants Using Progressive Optimality Algorithm
inferred← citeshttps://doi.org/10.1109/tpwrs.1987.4335206openalex-snapshot
Short-Term Generation Scheduling of Hydraulic Multi-Reservoir Multi-Area Interconnected Systems
inferred← citeshttps://doi.org/10.1111/j.1752-1688.1978.tb02245.xopenalex-snapshot
A NONLINEAR PROGRAMMING ALGORITHM FOR REAL‐TIME HOURLY RESERVOIR OPERATIONS1
inferred← citeshttps://doi.org/10.1111/j.1752-1688.1979.tb01098.xopenalex-snapshot
“A Nonlinear Programming Algorithm for Real‐Time Hourly Reservoir Operations”
inferred← citeshttps://doi.org/10.1111/j.1752-1688.2011.00628.xopenalex-snapshot
Short‐Term Hydroscheduling with Discrepant Objectives Using Multi‐Step Progressive Optimality Algorithm1
inferred← citeshttps://doi.org/10.1137/120891009openalex-snapshot
A Unified Convergence Analysis of Block Successive Minimization Methods for Nonsmooth Optimization
inferred← citeshttps://doi.org/10.1137/18m1217681openalex-snapshot
A Simple Framework for Stability Analysis of State-Dependent Networks of Heterogeneous Agents
inferred← citeshttps://doi.org/10.1139/l06-087openalex-snapshot
Dynamic programming with the principle of progressive optimality for searching rule curves
inferred← citeshttps://doi.org/10.1155/2015/710876openalex-snapshot
A Hybrid Search Algorithm for Midterm Optimal Scheduling of Thermal Power Plants
inferred← citeshttps://doi.org/10.1155/2022/8653470openalex-snapshot
Long-Term Optimal Dispatching of Hydropower Station Based on Controlling the Frequency of Reservoir Level Fluctuation
inferred← citeshttps://doi.org/10.12677/jwrr.2012.11001openalex-snapshot
Joint Operation of Flood Control and Hydropower Generation for the Multi-Reservoir System
inferred← citeshttps://doi.org/10.12677/jwrr.2013.25040openalex-snapshot
Comparative Study on Single-objective Optimization Algorithms for Reservoir Operation
inferred← citeshttps://doi.org/10.12677/jwrr.2017.64041openalex-snapshot
Joint Operation of Cascade Reservoir in the Upper Hanjiang River
inferred← citeshttps://doi.org/10.12677/jwrr.2021.101001openalex-snapshot
Optimal Operation Cascade Reservoirs in the Qing River Considering Ecological Flow
inferred← citeshttps://doi.org/10.1287/mnsc.33.10.1333openalex-snapshot
A Dynamic Planning Technique for Continuous Activities Under Multiple Resource Constraints
inferred← citeshttps://doi.org/10.1287/trsc.17.2.146openalex-snapshot
Optimal Control of Automobiles for Fuel Economy
inferred← citeshttps://doi.org/10.14288/1.0363034openalex-snapshot
Stochastic dynamic programming optimization model for operations planning of a multireservoir hydroelectric system
inferred← citeshttps://doi.org/10.1680/jwama.14.00158openalex-snapshot
A method for optimal floodgate operation in cascade reservoirs
inferred← citeshttps://doi.org/10.18178/ijoee.3.3.130-135openalex-snapshot
Double Effects Progressive Optimality Algorithm for Optimization of Large-Scale Hydropower System
inferred← citeshttps://doi.org/10.20868/upm.thesis.43237openalex-snapshot
Long-term optimal hydropower reservoir operation with minimum flows and maximum ramping rates
inferred← citeshttps://doi.org/10.21203/rs.3.rs-307334/v1openalex-snapshot
Long-Term Joint Operation of Cascade Reservoirs Using Enhanced Progressive Optimality Algorithm and Dynamic Programming Hybrid Approach
inferred← citeshttps://doi.org/10.2166/nh.2013.391openalex-snapshot
Decomposition–coordination model of reservoir group and flood storage basin for real-time flood control operation
inferred← citeshttps://doi.org/10.2166/ws.2017.070openalex-snapshot
An optimal algorithm for cascaded reservoir operation by combining the grey forecasting model with DDDP
inferred← citeshttps://doi.org/10.2166/ws.2019.067openalex-snapshot
Research on the multi-objective optimal operation of cascade reservoirs in the upper and middle Yellow River basin
inferred← citeshttps://doi.org/10.2166/ws.2020.140openalex-snapshot
A two-layer improved invasive weed optimization algorithm for optimal operation of cascade reservoirs
inferred← citeshttps://doi.org/10.23919/acc.2019.8814834openalex-snapshot
Sequential Optimization for State-Dependent Opinion Dynamics
inferred← citeshttps://doi.org/10.3390/axioms11100493openalex-snapshot
Decision Optimization for Water and Electricity Shared Resources Based on Fusion Swarm Intelligence
inferred← citeshttps://doi.org/10.3390/en4071036openalex-snapshot
Joint Operation of the Multi-Reservoir System of the Three Gorges and the Qingjiang Cascade Reservoirs
inferred← citeshttps://doi.org/10.3390/en6021165openalex-snapshot
Evaluation of Power Generation Efficiency of Cascade Hydropower Plants: A Case Study
inferred← citeshttps://doi.org/10.3390/en81112345openalex-snapshot
Modeling and Optimization of the Medium-Term Units Commitment of Thermal Power
inferred← citeshttps://doi.org/10.3390/su10124445openalex-snapshot
Application of Strongly Constrained Space Particle Swarm Optimization to Optimal Operation of a Reservoir System
inferred← citeshttps://doi.org/10.3390/su12104064openalex-snapshot
Integrated Software Development and Case Studies for Optimal Operation of Cascade Reservoir within the Environmental Flow Constraints
inferred← citeshttps://doi.org/10.3390/su17031018openalex-snapshot
Application of Black-Winged Differential-Variant Whale Optimization Algorithm in the Optimization Scheduling of Cascade Hydropower Stations
inferred← citeshttps://doi.org/10.3390/w10091250openalex-snapshot
Optimal Operation of Cascade Reservoirs for Flood Control of Multiple Areas Downstream: A Case Study in the Upper Yangtze River Basin
inferred← citeshttps://doi.org/10.3390/w11102098openalex-snapshot
Short-Term Optimal Operation of Cascade Reservoirs Considering Dynamic Water Flow Hysteresis
inferred← citeshttps://doi.org/10.3390/w12010197openalex-snapshot
Climate Change Impacts on Hydropower in Yunnan, China
inferred← citeshttps://doi.org/10.3390/w13202826openalex-snapshot
Upper Limit and Power Generation Loss of Water Supplement from Cascade Hydropower Stations to Downstream under Lancang-Mekong Cooperation
inferred← citeshttps://doi.org/10.3390/w13243654openalex-snapshot
Construction and Application of Reservoir Flood Control Operation Rules Using the Decision Tree Algorithm
inferred← citeshttps://doi.org/10.3390/w14081239openalex-snapshot
Optimal Flood-Control Operation of Cascade Reservoirs Using an Improved Particle Swarm Optimization Algorithm
inferred← citeshttps://doi.org/10.3390/w15030437openalex-snapshot
Deriving Operating Rules of Hydropower Reservoirs Using Multi-Strategy Ensemble Henry Gas Solubility Optimization-Driven Support Vector Machine
inferred← citeshttps://doi.org/10.3390/w17111681openalex-snapshot
Improved Reinforcement Learning for Multi-Objective Optimization Operation of Cascade Reservoir System Based on Monotonic Property
inferred← citeshttps://doi.org/10.36659/dae.2022.012openalex-snapshot
Otimização no planejamento da operação de bombas hidráulicas em sistemas de abastecimento de água para redução dos custos com energia elétrica
inferred← citeshttps://doi.org/10.3882/j.issn.1674-2370.2014.04.006openalex-snapshot
Optimal early refill rules for Danjiangkou Reservoir
inferred← citeshttps://doi.org/10.4028/www.scientific.net/amr.860-863.2101openalex-snapshot
Application of Improved Ant Colony Optimization on Economical Operation of Automatic Generation Control Units in Hydropower Station
inferred← citeshttps://doi.org/10.4236/jwarp.2014.616142openalex-snapshot
A Two-Stage Approach for Large-Scale Cascaded Hydropower System Operations
inferred← citeshttps://doi.org/10.5194/piahs-379-199-2018openalex-snapshot
Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method
inferred← citeshttps://doi.org/10.70675/85dd635ez76fcz4fdezbbdcz05cc15d97c3eopenalex-snapshot
Optimisation de la gestion d’un réseau hydrographique en périodes de crues
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.