On the public citation graph

Critical path planning under uncertainty

0 signed · 66 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1007/bf00531850openalex-snapshot
Linear programming under uncertainty: A basic property of the optimal solution
inferredcites →https://doi.org/10.1007/bfb0121114openalex-snapshot
Designing approximation schemes for stochastic optimization problems, in particular for stochastic programs with recourse
inferredcites →https://doi.org/10.1057/jors.1981.82openalex-snapshot
Network Flow Programming
inferredcites →https://doi.org/10.1137/0114008openalex-snapshot
Programming Under Uncertainty: The Equivalent Convex Program
inferredcites →https://doi.org/10.1137/0117061openalex-snapshot
L -Shaped Linear Programs with Applications to Optimal Control and Stochastic Programming
inferredcites →https://doi.org/10.1137/0309037openalex-snapshot
Generalized Cutting Plane Algorithms
inferredcites →https://doi.org/10.1287/opre.17.3.395openalex-snapshot
An Appraisal of Some Shortest-Path Algorithms
inferredcites →https://doi.org/10.1287/opre.18.3.404openalex-snapshot
Cutting-Plane Methods without Nested Constraint Sets
inferredcites →https://doi.org/10.1287/opre.9.3.296openalex-snapshot
Critical-Path Planning and Scheduling: Mathematical Basis
inferredcites →https://doi.org/10.2307/1267061openalex-snapshot
Introduction to Operations Research
inferredcites →https://doi.org/10.2307/2343865openalex-snapshot
Introduction to Operations Research.

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.1089381openalex-extracted
inferred← citeshttps://doi.org/10.1002/9780470451793.ch18openalex-snapshot
Safe Scheduling for Projects
inferred← citeshttps://doi.org/10.1002/9781119262602.ch19openalex-snapshot
PERT 21
inferred← citeshttps://doi.org/10.1007/978-1-4614-9056-2_8openalex-snapshot
Scheduling and Financial Planning in Stochastic Activity Networks
inferred← citeshttps://doi.org/10.1007/978-3-030-81123-5_5openalex-snapshot
Time –Cost Trade-off Optimal Approaches
inferred← citeshttps://doi.org/10.1007/978-3-319-05915-0_12openalex-snapshot
The Fuzzy Time-Cost Tradeoff Problem
inferred← citeshttps://doi.org/10.1007/978-3-319-05915-0_6openalex-snapshot
The Stochastic Discrete Time-Cost Tradeoff Problem with Decision-Dependent Uncertainty
inferred← citeshttps://doi.org/10.1007/978-3-642-21515-5_35openalex-snapshot
Using Artificial Bee Colony to Solve Stochastic Resource Constrained Project Scheduling Problem
inferred← citeshttps://doi.org/10.1007/bf02592150openalex-snapshot
Sample-path optimization of convex stochastic performance functions
inferred← citeshttps://doi.org/10.1007/bfb0121070openalex-snapshot
Mathematical Programming Essays in Honor of George B. Dantzig Part II
inferred← citeshttps://doi.org/10.1007/s10700-010-9076-zopenalex-snapshot
New fuzzy models for time-cost trade-off problem
inferred← citeshttps://doi.org/10.1016/0167-6377(89)90007-2openalex-snapshot
Bounding the expected time-cost curve for a stochastic pert network from below
inferred← citeshttps://doi.org/10.1016/0263-7863(94)90005-1openalex-snapshot
Using a risk register to integrate risk management in project definition
inferred← citeshttps://doi.org/10.1016/0377-2217(93)e0363-3openalex-snapshot
A classified bibliography of recent research relating to project risk management
inferred← citeshttps://doi.org/10.1016/j.amc.2009.05.004openalex-snapshot
Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem
inferred← citeshttps://doi.org/10.1016/j.amc.2012.03.035openalex-snapshot
Modeling stochastic project time–cost trade-offs with time-dependent activity durations
inferred← citeshttps://doi.org/10.1016/j.asoc.2014.01.040openalex-snapshot
Modeling project time–cost trade-off in fuzzy random environment
inferred← citeshttps://doi.org/10.1016/j.cie.2011.07.009openalex-snapshot
Improving system performance for stochastic activity network: A simulation approach
inferred← citeshttps://doi.org/10.1016/j.conengprac.2006.12.004openalex-snapshot
Managing risk in semiconductor manufacturing: A stochastic predictive control approach
inferred← citeshttps://doi.org/10.1016/j.cor.2010.03.002openalex-snapshot
A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
inferred← citeshttps://doi.org/10.1016/j.cor.2015.04.021openalex-snapshot
An adaptive crashing policy for stochastic time-cost tradeoff problems
inferred← citeshttps://doi.org/10.1016/j.ejor.2004.04.002openalex-snapshot
Project scheduling under uncertainty: Survey and research potentials
inferred← citeshttps://doi.org/10.1016/j.ejor.2007.06.021openalex-snapshot
Using a risk-based approach to project scheduling: A case illustration from semiconductor manufacturing
inferred← citeshttps://doi.org/10.1016/j.ejor.2007.09.010openalex-snapshot
A heuristic procedure for solving the dynamic probabilistic project expediting problem
inferred← citeshttps://doi.org/10.1016/j.ejor.2011.02.002openalex-snapshot
Time–cost trade-off analysis of project networks in fuzzy environments
inferred← citeshttps://doi.org/10.1016/j.ejor.2011.07.054openalex-snapshot
Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation
inferred← citeshttps://doi.org/10.1016/j.jngse.2017.04.033openalex-snapshot
Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm
inferred← citeshttps://doi.org/10.1016/s0377-2217(99)00484-1openalex-snapshot
Improving project cost estimation by taking into account managerial flexibility
inferred← citeshttps://doi.org/10.1023/a:1008991500612openalex-snapshot
Assessing Probabilistic Timing Constraints on System Performance
inferred← citeshttps://doi.org/10.1023/a:1018946232721openalex-snapshot
Work patterns in project scheduling
inferred← citeshttps://doi.org/10.1080/00207540500371881openalex-snapshot
Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result
inferred← citeshttps://doi.org/10.1080/00207543.2014.952792openalex-snapshot
Project management for uncertainty with multiple objectives optimisation of time, cost and reliability
inferred← citeshttps://doi.org/10.1080/07408170701315347openalex-snapshot
An effective methodology for the stochastic project compression problem
inferred← citeshttps://doi.org/10.1080/17509653.2016.1255857openalex-snapshot
Project time–cost trade-off: a Bayesian approach to update project time and cost estimates
inferred← citeshttps://doi.org/10.1080/23302674.2015.1025889openalex-snapshot
Stochastic project management via computer simulation and optimisation method
inferred← citeshttps://doi.org/10.1109/coinfo.2009.44openalex-snapshot
Modeling Time-Cost Trade-Off Problem with Fuzzy Activity Duration Times
inferred← citeshttps://doi.org/10.1109/fuzzy.2009.5277068openalex-snapshot
A dependent-chance programming model for fuzzy time-cost trade-off problem
inferred← citeshttps://doi.org/10.1109/iccie.2009.5223789openalex-snapshot
An embedded simulation approach for optimal activity crashing in stochastic networks
inferred← citeshttps://doi.org/10.1109/icee.2010.907openalex-snapshot
A Survey of Researches on Uncertain Project Scheduling Problems
inferred← citeshttps://doi.org/10.1109/ieem.2008.4737856openalex-snapshot
Project scheduling for maximum NPV with variable activity durations and uncertain activity outcomes
inferred← citeshttps://doi.org/10.1111/itor.12764openalex-snapshot
The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights
inferred← citeshttps://doi.org/10.1111/j.1937-5956.2009.01023.xopenalex-snapshot
Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
inferred← citeshttps://doi.org/10.1142/s0217595915500396openalex-snapshot
Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs
inferred← citeshttps://doi.org/10.1177/00375497231196889openalex-snapshot
Trade-off between time and cost in project planning: a simulation-based optimization approach
inferred← citeshttps://doi.org/10.1186/2195-5468-2-8openalex-snapshot
A genetic algorithm-based optimizing approach for project time-cost trade-off with uncertain measure
inferred← citeshttps://doi.org/10.1186/s40467-014-0023-3openalex-snapshot
Uncertain random time-cost trade-off problem
inferred← citeshttps://doi.org/10.1287/opre.1110.1005openalex-snapshot
On the Complexity of Nonoverlapping Multivariate Marginal Bounds for Probabilistic Combinatorial Optimization Problems
inferred← citeshttps://doi.org/10.1287/opre.47.6.943openalex-snapshot
Restricted-Recourse Bounds for Stochastic Linear Programming
inferred← citeshttps://doi.org/10.1504/ijpom.2014.059745openalex-snapshot
Optimal resource allocation in activity networks - stochastic environment
inferred← citeshttps://doi.org/10.23919/ecc.2007.7068825openalex-snapshot
A model predictive control approach for project risk management
inferred← citeshttps://doi.org/10.4018/978-1-4666-0930-3.ch002openalex-snapshot
Optimal Crashing and Buffering of Stochastic Serial Projects
inferred← citeshttps://doi.org/10.4018/978-1-61350-456-7.ch219openalex-snapshot
Optimal Crashing and Buffering of Stochastic Serial Projects
inferred← citeshttps://doi.org/10.4018/jitpm.2010100203openalex-snapshot
Optimal Crashing and Buffering of Stochastic Serial Projects
inferred← citeshttps://doi.org/10.5267/j.jpm.2018.1.005openalex-snapshot
Resource-constrained project scheduling problem: review of past and recent developments
inferred← citeshttps://doi.org/10.7737/jkorms.2013.38.2.025openalex-snapshot
Project Time-Cost Tradeoff Problem with Milestones under an Uncertain Processing Time
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.