On the public citation graph

Production planning with load dependent lead times

https://doi.org/10.1007/s10288-005-0083-9
0 signed · 126 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1007/3-7908-1636-1_35openalex-snapshot
Load Dependent Lead Times — From Empirical Evidence to Mathematical Modeling
inferredcites →https://doi.org/10.1007/978-1-4615-7561-0openalex-snapshot
Palm Probabilities and Stationary Queues
inferredcites →https://doi.org/10.1007/978-3-540-24764-7openalex-snapshot
Introduction to Computational Optimization Models for Production Planning in a Supply Chain
inferredcites →https://doi.org/10.1007/978-3-540-74512-9openalex-snapshot
Supply Chain Management and Advanced Planning
inferredcites →https://doi.org/10.1007/978-3-663-02130-8_9openalex-snapshot
Das Dilemma der Fertigungssteuerung
inferredcites →https://doi.org/10.1007/b138676openalex-snapshot
Kanban-Controlled Manufacturing Systems
inferredcites →https://doi.org/10.1016/0278-6125(87)90016-1openalex-snapshot
Capacity analysis of a manufacturing cell
inferredcites →https://doi.org/10.1016/0377-2217(83)90235-7openalex-snapshot
Lead time management
inferredcites →https://doi.org/10.1016/0377-2217(93)90287-wopenalex-snapshot
New concepts for production planning and control
inferredcites →https://doi.org/10.1016/0925-5273(93)90085-yopenalex-snapshot
Production Planning and Control (PPC) systems including load-oriented order release — Problems and research perspectives
inferredcites →https://doi.org/10.1016/0925-5273(95)00161-1openalex-snapshot
Capacity planning and lead time management
inferredcites →https://doi.org/10.1016/s0377-2217(01)00281-8openalex-snapshot
Improving supply-chain performance by sharing advance demand information
inferredcites →https://doi.org/10.1016/s0377-2217(01)00300-9openalex-snapshot
The impact of forecasting model selection on the value of information sharing in a supply chain
inferredcites →https://doi.org/10.1016/s0377-2217(98)00393-2openalex-snapshot
Lead times, order release mechanisms, and customer service
inferredcites →https://doi.org/10.1016/s0925-5273(96)00088-6openalex-snapshot
Workload control concepts in job shops A critical assessment
inferredcites →https://doi.org/10.1016/s0927-0507(03)11009-2openalex-snapshot
Planning Hierarchy, Modeling and Advanced Planning Systems
inferredcites →https://doi.org/10.1016/s0927-0507(03)11012-2openalex-snapshot
Planning Supply Chain Operations: Definition and Comparison of Planning Concepts
inferredcites →https://doi.org/10.1016/s0927-0507(05)80186-0openalex-snapshot
Chapter 6 Manufacturing lead times, order release and capacity loading
inferredcites →https://doi.org/10.1057/jors.1991.167openalex-snapshot
Job Release: Part of a Hierarchical System to Manage Manufacturing Lead Times in Make-to-order Companies
inferredcites →https://doi.org/10.1057/jors.1995.169openalex-snapshot
A Heuristic for a Resource-capacitated Multi-stage Lot-sizing Problem with Lead Times
inferredcites →https://doi.org/10.1057/jors.1996.102openalex-snapshot
Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time
inferredcites →https://doi.org/10.1057/jors.1996.195openalex-snapshot
Dynamic Release Control Policy for the Semiconductor Wafer Fabrication Lines
inferredcites →https://doi.org/10.1080/0020754031000069625openalex-snapshot
The impacts of sharing production information on supply chain dynamics: A review of the literature
inferredcites →https://doi.org/10.1080/00207548808947871openalex-snapshot
Theory and practice of load-oriented manufacturing control
inferredcites →https://doi.org/10.1080/00207548808947875openalex-snapshot
Computerized shop floor scheduling
inferredcites →https://doi.org/10.1080/00207549008942761openalex-snapshot
CONWIP: a pull alternative to kanban
inferredcites →https://doi.org/10.1080/0953728021000026203openalex-snapshot
Lot sizing in workload control systems
inferredcites →https://doi.org/10.1108/09576060410512365openalex-snapshot
Work load responsive adjustment of planned lead times
inferredcites →https://doi.org/10.1108/eb054756openalex-snapshot
The Structuring of Production Control Systems
inferredcites →https://doi.org/10.1109/66.4371openalex-snapshot
Closed-loop job release control for VLSI circuit manufacturing
inferredcites →https://doi.org/10.1109/cdc.1999.832907openalex-snapshot
Modeling load-dependent lead time constraints for efficient supply chain coordination: convexity issues
inferredcites →https://doi.org/10.1109/hicss.2004.1265247openalex-snapshot
A model for multi-stage production planning with load dependent lead times
inferredcites →https://doi.org/10.1109/robot.1999.772564openalex-snapshot
Dynamic lead time modeling for JIT production planning
inferredcites →https://doi.org/10.1109/wsc.2002.1166366openalex-snapshot
Use of GI/G/1 queuing approximations to set tactical parameters for the simulation of MRP systems
inferredcites →https://doi.org/10.1111/1475-3995.00388openalex-snapshot
On the importance of sequencing decisions in production planning and scheduling
inferredcites →https://doi.org/10.1287/inte.15.2.1openalex-snapshot
Lot-Sizing and Lead-time Performance in a Manufacturing Cell
inferredcites →https://doi.org/10.1287/mnsc.1040.0262openalex-snapshot
Dynamic Version of the Economic Lot Size Model
inferredcites →https://doi.org/10.1287/mnsc.29.10.1126openalex-snapshot
Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
inferredcites →https://doi.org/10.1287/mnsc.29.7.799openalex-snapshot
The Effect of Workload Dependent Due-Dates on Job Shop Performance
inferredcites →https://doi.org/10.1287/mnsc.33.1.95openalex-snapshot
Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
inferredcites →https://doi.org/10.1287/mnsc.33.3.409openalex-snapshot
Lot Sizes, Lead Times and In-Process Inventories
inferredcites →https://doi.org/10.1287/mnsc.35.4.478openalex-snapshot
A General Framework for Modeling Production
inferredcites →https://doi.org/10.1287/mnsc.35.5.607openalex-snapshot
Batching to Minimize Flow Times on Parallel Heterogeneous Machines
inferredcites →https://doi.org/10.1287/mnsc.43.4.546openalex-snapshot
Information Distortion in a Supply Chain: The Bullwhip Effect
inferredcites →https://doi.org/10.1287/mnsc.45.1.86openalex-snapshot
Finding Optimal Material Release Times Using Simulation-Based Optimization
inferredcites →https://doi.org/10.1287/mnsc.45.2.290openalex-snapshot
Optimal Lead Time Policies
inferredcites →https://doi.org/10.1287/mnsc.46.3.436.12069openalex-snapshot
Quantifying the Bullwhip Effect in a Simple Supply Chain: The Impact of Forecasting, Lead Times, and Information
inferredcites →https://doi.org/10.1287/msom.2.1.68.23267openalex-snapshot
Optimizing Strategic Safety Stock Placement in Supply Chains
inferredcites →https://doi.org/10.1287/opre.24.3.400openalex-snapshot
Dynamic Modeling and Control of Congestion-Prone Systems
inferredcites →https://doi.org/10.1287/opre.29.4.707openalex-snapshot
Analytical Evaluation of Hierarchical Planning Systems
inferredcites →https://doi.org/10.1287/opre.29.4.717openalex-snapshot
Hierarchical Production Planning: A Single Stage System
inferredcites →https://doi.org/10.1287/opre.30.2.232openalex-snapshot
Hierarchical Production Planning: A Two-Stage System
inferredcites →https://doi.org/10.1287/opre.48.2.216.12376openalex-snapshot
A Supply Network Model with Base-Stock Control and Service Requirements
inferredcites →https://doi.org/10.1287/opre.51.4.566.16106openalex-snapshot
Supply Chain Scheduling: Batching and Delivery

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.1620237openalex-extracted
Coordinating Lead-Time and Safety Stock Decisions in a Two-Echelon Supply Chain with Autocorrelated Consumer Demand
inferred← citeshttps://doi.org/10.1002/nav.20335openalex-snapshot
Production planning with resources subject to congestion
inferred← citeshttps://doi.org/10.1007/978-0-85729-644-3openalex-snapshot
Decision Policies for Production Networks
inferred← citeshttps://doi.org/10.1007/978-0-85729-644-3_11openalex-snapshot
Optimal Order and Distribution Strategies in Production Networks
inferred← citeshttps://doi.org/10.1007/978-0-85729-644-3_8openalex-snapshot
Chance-Constraint-Based Heuristics for Production Planning in the Face of Stochastic Demand and Workload-Dependent Lead Times
inferred← citeshttps://doi.org/10.1007/978-1-4419-6485-4_16openalex-snapshot
Optimization Models of Production Planning Problems
inferred← citeshttps://doi.org/10.1007/978-1-4419-6485-4_7openalex-snapshot
Production Capacity: Its Bases, Functions and Measurement
inferred← citeshttps://doi.org/10.1007/978-1-4419-8191-2_1openalex-snapshot
Production Planning Under Uncertainty with Workload-Dependent Lead Times: Lagrangean Bounds and Heuristics
inferred← citeshttps://doi.org/10.1007/978-1-4419-8191-2_2openalex-snapshot
Production Planning and Scheduling: Interaction and Coordination
inferred← citeshttps://doi.org/10.1007/978-1-4614-9056-2_3openalex-snapshot
Integrated Production Planning and Pricing Decisions in Congestion-Prone Capacitated Production Systems
inferred← citeshttps://doi.org/10.1007/978-3-319-25919-2_13openalex-snapshot
Causal Models of JIT Elements and Causes of Slow JIT Implementation
inferred← citeshttps://doi.org/10.1007/978-3-319-39630-9_2openalex-snapshot
An Approach for Designing Order Size Dependent Lead Time Models for Use in Inventory and Supply Chain Management
inferred← citeshttps://doi.org/10.1007/s10288-009-0096-xopenalex-snapshot
No 7-year itch at 4OR
inferred← citeshttps://doi.org/10.1007/s10479-007-0168-2openalex-snapshot
Eleven surveys in Operations Research
inferred← citeshttps://doi.org/10.1007/s10479-007-0173-5openalex-snapshot
Production planning with load dependent lead times: an update of research
inferred← citeshttps://doi.org/10.1007/s10479-007-0294-xopenalex-snapshot
Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions
inferred← citeshttps://doi.org/10.1007/s10479-009-0671-8openalex-snapshot
Eleven surveys in operations research: II
inferred← citeshttps://doi.org/10.1007/s10479-013-1310-yopenalex-snapshot
Eleven surveys in operations research: III
inferred← citeshttps://doi.org/10.1007/s10479-016-2205-5openalex-snapshot
Twelve surveys in operations research
inferred← citeshttps://doi.org/10.1007/s10479-018-3036-3openalex-snapshot
Surveys in operations research
inferred← citeshttps://doi.org/10.1007/s10479-022-04730-3openalex-snapshot
Sixty-one surveys in operations research
inferred← citeshttps://doi.org/10.1007/s10479-024-06393-8openalex-snapshot
Still more surveys in operations research…
inferred← citeshttps://doi.org/10.1007/s10696-024-09562-wopenalex-snapshot
The impacts of stockout cost on a stochastic production-inventory system in minimizing total cost conditional value-at-risk
inferred← citeshttps://doi.org/10.1016/j.compchemeng.2009.07.010openalex-snapshot
An integrated production planning model with load-dependent lead-times and safety stocks
inferred← citeshttps://doi.org/10.1016/j.cor.2008.06.006openalex-snapshot
Heuristics for capacity planning problems with congestion
inferred← citeshttps://doi.org/10.1016/j.cor.2017.11.013openalex-snapshot
Production planning with order acceptance and demand uncertainty
inferred← citeshttps://doi.org/10.1016/j.ejor.2013.02.010openalex-snapshot
Integrated production planning and order acceptance under uncertainty: A robust optimization approach
inferred← citeshttps://doi.org/10.1016/j.ejor.2013.06.036openalex-snapshot
Coordinating lead times and safety stocks under autocorrelated demand
inferred← citeshttps://doi.org/10.1016/j.ejor.2014.01.055openalex-snapshot
Integrating operations and marketing decisions using delayed differentiation of products and guaranteed delivery time under stochastic demand
inferred← citeshttps://doi.org/10.1016/j.ijpe.2010.03.018openalex-snapshot
Using a mathematical programming model to examine the marginal price of capacitated resources
inferred← citeshttps://doi.org/10.1016/j.ijpe.2012.05.029openalex-snapshot
Lead time estimation in MRP/ERP for make-to-order manufacturing systems
inferred← citeshttps://doi.org/10.1016/j.ijpe.2013.02.016openalex-snapshot
Make-to-stock policies for a multistage serial system under a make-to-order production environment
inferred← citeshttps://doi.org/10.1016/j.ijpe.2013.10.015openalex-snapshot
Exact solutions to the supply chain equations for arbitrary, time-dependent demands
inferred← citeshttps://doi.org/10.1016/j.ijpe.2016.08.020openalex-snapshot
Flexible supply chain planning based on variable transportation modes
inferred← citeshttps://doi.org/10.1016/j.ijpe.2021.108034openalex-snapshot
The lead time updating trap: Analyzing human behavior in capacitated supply chains
inferred← citeshttps://doi.org/10.1016/j.jmsy.2015.11.004openalex-snapshot
A metamodel-based Monte Carlo simulation approach for responsive production planning of manufacturing systems
inferred← citeshttps://doi.org/10.1080/00207543.2011.653454openalex-snapshot
Multi-item production planning with stochastic demand: a ranking-based solution
inferred← citeshttps://doi.org/10.1080/00207543.2014.899442openalex-snapshot
An exploratory study of disaggregated clearing functions for production systems with multiple products
inferred← citeshttps://doi.org/10.1080/00207543.2014.935514openalex-snapshot
Zero-order production planning models with stochastic demand and workload-dependent lead times
inferred← citeshttps://doi.org/10.1080/00207543.2014.993045openalex-snapshot
Integrating order acceptance decisions with flexible due dates in a production planning model with load-dependent lead times
inferred← citeshttps://doi.org/10.1080/00207543.2016.1257169openalex-snapshot
Multi-dimensional clearing functions for aggregate capacity modelling in multi-stage production systems
inferred← citeshttps://doi.org/10.1080/00207543.2017.1401234openalex-snapshot
A survey of semiconductor supply chain models part III: master planning, production planning, and demand fulfilment
inferred← citeshttps://doi.org/10.1080/00207543.2019.1683252openalex-snapshot
Semiconductor wafer fabrication production planning using multi-fidelity simulation optimisation
inferred← citeshttps://doi.org/10.1080/07408170802322978openalex-snapshot
Exact and heuristic procedures for capacity expansion problems with congestion
inferred← citeshttps://doi.org/10.1108/bij-05-2018-0120openalex-snapshot
A review of machine efficiency in mass customization
inferred← citeshttps://doi.org/10.1109/access.2024.3393831openalex-snapshot
Simulation Based Resource Optimization Using a Decision Tree Clearing Function
inferred← citeshttps://doi.org/10.1109/cipls.2013.6595211openalex-snapshot
System for product-based control of production processes
inferred← citeshttps://doi.org/10.1109/hicss.2011.169openalex-snapshot
Discrete Lot-Sizing and Scheduling with Sequence-Dependent Setup Times and Costs Including Deterioration and Perishability Constraints
inferred← citeshttps://doi.org/10.1109/icarcv.2018.8580637openalex-snapshot
Integrated Production Planning and Preventive Maintenance Model with Non-fixed Lead Time
inferred← citeshttps://doi.org/10.1109/ieem.2013.6962604openalex-snapshot
An integrated production planning and order acceptance model with flexible due dates
inferred← citeshttps://doi.org/10.1109/issm.2006.4493024openalex-snapshot
Supply Chain Inventory Control in Semiconductor Manufacturing
inferred← citeshttps://doi.org/10.1109/tsm.2008.2001215openalex-snapshot
Integrated Planning of Production and Engineering Process Improvement
inferred← citeshttps://doi.org/10.1109/tsm.2010.2046102openalex-snapshot
Forward Echelon-Based Inventory Monitoring in a Semiconductor Supply Chain
inferred← citeshttps://doi.org/10.1109/tsm.2010.2051751openalex-snapshot
An Exploratory Analysis of Two Iterative Linear Programming—Simulation Approaches for Production Planning
inferred← citeshttps://doi.org/10.1109/tsm.2011.2176560openalex-snapshot
An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms
inferred← citeshttps://doi.org/10.1109/tsm.2016.2546314openalex-snapshot
Modeling Cycle Times in Production Planning Models for Wafer Fabrication
inferred← citeshttps://doi.org/10.1109/wsc.2006.322966openalex-snapshot
Using System Dynamics Simulations to Compare Capacity Models for Production Planning
inferred← citeshttps://doi.org/10.1109/wsc.2007.4419791openalex-snapshot
Determining safety stocks in the presence of workload-dependent lead times
inferred← citeshttps://doi.org/10.1109/wsc.2010.5678899openalex-snapshot
Estimating clearing functions from simulation data
inferred← citeshttps://doi.org/10.1109/wsc.2011.6148055openalex-snapshot
Production planning for semiconductor manufacturing via simulation optimization
inferred← citeshttps://doi.org/10.1109/wsc.2013.6721733openalex-snapshot
A comparison of production planning formulations with exogenous cycle time estimates using a large-scale wafer fab model
inferred← citeshttps://doi.org/10.1109/wsc.2015.7408315openalex-snapshot
Lead time modeling in production planning
inferred← citeshttps://doi.org/10.1111/j.1937-5956.2011.01310.xopenalex-snapshot
The Critical Role of Ocean Container Transport in Global Supply Chain Performance
inferred← citeshttps://doi.org/10.1155/2013/359074openalex-snapshot
Using Metaheuristic and Fuzzy System for the Optimization of Material Pull in a Push-Pull Flow Logistics Network
inferred← citeshttps://doi.org/10.11575/prism/27449openalex-snapshot
Production Planning and Control for Flexible Interim Product Manufacturing in One-of-a-Kind Production
inferred← citeshttps://doi.org/10.1504/ijeme.2012.048604openalex-snapshot
Load-dependent production planning for an assemble-to-order system
inferred← citeshttps://doi.org/10.15373/22501991/may2015/106openalex-snapshot
A Successful Case to Adopt Green Purchasing System
inferred← citeshttps://doi.org/10.33915/etd.3046openalex-snapshot
A Simulation-Based Transfer Function Modeling Approach for Responsive Production Planning
inferred← citeshttps://doi.org/10.5555/2429759.2430011openalex-snapshot
Using iterative simulation to incorporate load-dependent lead times in master planning heuristics
inferred← citeshttps://doi.org/10.5555/2431518.2431948openalex-snapshot
Production planning for semiconductor manufacturing via simulation optimization
inferred← citeshttps://doi.org/10.58837/chula.the.2018.1319openalex-snapshot
การยอมรบคำสงซอและการวางแผนการผลตในระบบการผลตแบบไหลเลอน
inferred← citeshttps://doi.org/10.6100/ir621899openalex-snapshot
Dynamic performance of hierarchical planning systems:modeling and evaluation with dynamic planned lead times
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.