On the public citation graph
An optimal algorithm of the multi-lifting operating simulation for super-tall building construction
0 signed · 33 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1007/978-1-349-16675-6openalex-snapshot
Graph Theory in Operations Research
inferredcites →https://doi.org/10.1007/978-1-4302-0248-6_11openalex-snapshot
Introduction to Data Mining
inferredcites →https://doi.org/10.1007/978-1-4842-7107-0_3openalex-snapshot
Algorithm and Data Structure
inferredcites →https://doi.org/10.1007/978-3-540-68279-0_1openalex-snapshot
Solution of a Large-Scale Traveling-Salesman Problem
inferredcites →https://doi.org/10.1057/jors.1982.219openalex-snapshot
Graph Theory in Operations Research
inferredcites →https://doi.org/10.1287/opre.2.4.393openalex-snapshot
Solution of a Large-Scale Traveling-Salesman Problem
inferredcites →https://doi.org/10.22260/isarc2010/0003openalex-snapshot
Simulation Method of Construction Hoist Operating Plan for High Rise Buildings Considering Lifting Heights and Loads
inferredcites →https://doi.org/10.6106/kjcem.2011.12.6.120openalex-snapshot
An Algorithm for Hoisting Time Calculation in Super-tall Building Construction
What points at this work
Incoming claims: where this work appears in other papers’ reference lists and arguments.
inferred← citeshttps://doi.org/10.2139/ssrn.4680443openalex-extracted
Autopilot Drone in Construction:A Proof of Concept for Handling Lightweight Instruments and Materials
inferred← citeshttps://doi.org/10.1007/978-981-15-3977-0_74openalex-snapshot
Carbon Emission of on Site Logistics for Tall Buildings
inferred← citeshttps://doi.org/10.1007/s41062-026-02871-zopenalex-snapshot
Building Information Modelling (BIM) adoption in developing economies: an analysis of barriers, critical success factors, and a public infrastructure viability framework
inferred← citeshttps://doi.org/10.1016/j.autcon.2014.09.005openalex-snapshot
Understanding the role of “tasks anticipated” in lookahead planning through simulation
inferred← citeshttps://doi.org/10.1016/j.autcon.2015.08.002openalex-snapshot
Advanced power supply of construction hoists for supertall buildings
inferred← citeshttps://doi.org/10.1016/j.autcon.2016.10.002openalex-snapshot
Construction worker hoisting simulation for sky-lobby lifting system
inferred← citeshttps://doi.org/10.1016/j.autcon.2018.03.029openalex-snapshot
Mathematical model to optimally solve the lift planning problem in high-rise construction projects
inferred← citeshttps://doi.org/10.1016/j.autcon.2018.09.023openalex-snapshot
Flexible double-cage hoist for high operational efficiency in tall building construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2019.102939openalex-snapshot
Optimization of flexible lift processes on high-rise building construction sites
inferred← citeshttps://doi.org/10.1016/j.autcon.2019.102985openalex-snapshot
BIM-based estimation of vertical transportation demands during the construction of high-rise buildings
inferred← citeshttps://doi.org/10.1016/j.autcon.2021.103737openalex-snapshot
Autonomous construction hoist system based on deep reinforcement learning in high-rise building construction
inferred← citeshttps://doi.org/10.1016/j.dibe.2024.100328openalex-snapshot
Spatio-temporal optimization of construction elevator planning in high-rise building projects
inferred← citeshttps://doi.org/10.1016/j.rineng.2024.102498openalex-snapshot
Autopilot drone in construction: A proof of concept for handling lightweight instruments and materials
inferred← citeshttps://doi.org/10.1016/j.techfore.2017.11.012openalex-snapshot
Patent analysis for forecasting promising technology in high-rise building construction
inferred← citeshttps://doi.org/10.1038/s41598-025-34226-6openalex-snapshot
Enabling continuous 24/7 vertical mobility in High-Rise buildings by integrating critical activity scheduling and night shift planning
inferred← citeshttps://doi.org/10.1061/9780784413616.130openalex-snapshot
Resource-Based Multi-Method Simulation Model for Super-Tall Building Construction
inferred← citeshttps://doi.org/10.1080/23302674.2026.2623450openalex-snapshot
Evaluating zoning-based lift stopping strategies under stochastic worker arrivals in super-tall construction using agent-based simulation
inferred← citeshttps://doi.org/10.1108/ecam-11-2024-1570openalex-snapshot
How many lifts does a construction site need? A Global optimization approach
inferred← citeshttps://doi.org/10.1109/icmtma.2018.00020openalex-snapshot
Research on Constant Deceleration Braking Performance of the Disc Braking System for Ultra Deep Mine Hoist
inferred← citeshttps://doi.org/10.1111/mice.12220openalex-snapshot
Zoning‐Based Vertical Transportation Optimization for Workers at Peak Time in a Skyscraper Construction
inferred← citeshttps://doi.org/10.1155/2019/1659325openalex-snapshot
Numerical Simulation of Fire Smoke Spread in a Super High‐Rise Building for Different Fire Scenarios
inferred← citeshttps://doi.org/10.35490/ec3.2022.185openalex-snapshot
Genetic algorithm-based temporary elevator planning from a spatio-temporal perspective
inferred← citeshttps://doi.org/10.54878/ijadt.102openalex-snapshot
Spatio-temporal planning simulation of temporary elevators in construction using a game engine
inferred← citeshttps://doi.org/10.6106/kjcem.2014.15.6.053openalex-snapshot
Study on Optimization for Construction Vertical Lifting with Transfer Operation for Super High-rise Buildings
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.