On the public citation graph

The “Dual-Ants Colony”: A novel hybrid approach for the flexible job shop scheduling problem with preventive maintenance

0 signed · 150 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/(sici)1099-1425(200001/02)3:1<3::aid-jos32>3.0.co;2-yopenalex-snapshot
Effective neighbourhood functions for the flexible job shop problem
inferredcites →https://doi.org/10.1002/9780470611432openalex-snapshot
Flexibility and Robustness in Scheduling
inferredcites →https://doi.org/10.1002/nav.3800060205openalex-snapshot
An integer linear‐programming model for machine scheduling
inferredcites →https://doi.org/10.1007/bf02023073openalex-snapshot
Routing and scheduling in a flexible job shop by tabu search
inferredcites →https://doi.org/10.1007/s00170-010-2621-7openalex-snapshot
An efficient architecture for scheduling flexible job-shop with machine availability constraints
inferredcites →https://doi.org/10.1007/s10845-005-0021-xopenalex-snapshot
Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm
inferredcites →https://doi.org/10.1016/b978-0-12-849896-5.00008-8openalex-snapshot
Optimization and Solution of Unit Maintenance Scheduling Models
inferredcites →https://doi.org/10.1016/j.apm.2012.03.020openalex-snapshot
Evaluation of mathematical models for flexible job-shop scheduling problems
inferredcites →https://doi.org/10.1016/j.apm.2013.07.038openalex-snapshot
A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
inferredcites →https://doi.org/10.1016/j.asoc.2010.12.021openalex-snapshot
Multiple-colony ant algorithm for parallel assembly line balancing problem
inferredcites →https://doi.org/10.1016/j.asoc.2012.04.012openalex-snapshot
Chemical-reaction optimization for flexible job-shop scheduling problems with maintenance activity
inferredcites →https://doi.org/10.1016/j.camwa.2012.04.007openalex-snapshot
Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
inferredcites →https://doi.org/10.1016/j.cie.2007.06.001openalex-snapshot
Investigation of Ant System parameter interactions by using design of experiments for job-shop scheduling problems
inferredcites →https://doi.org/10.1016/j.cie.2008.09.031openalex-snapshot
A hybrid artificial immune algorithm for a realistic variant of job shops to minimize the total completion time
inferredcites →https://doi.org/10.1016/j.cie.2009.03.008openalex-snapshot
Training a neural network to select dispatching rules in real time
inferredcites →https://doi.org/10.1016/j.cie.2009.04.014openalex-snapshot
A survey of scheduling with deterministic machine availability constraints
inferredcites →https://doi.org/10.1016/j.cie.2010.01.002openalex-snapshot
Fuzzy job shop scheduling problem with availability constraints
inferredcites →https://doi.org/10.1016/j.cie.2010.05.016openalex-snapshot
An effective heuristic for flexible job-shop scheduling problem with maintenance activities
inferredcites →https://doi.org/10.1016/j.cie.2010.06.010openalex-snapshot
Minimizing the makespan in the non-preemptive job-shop scheduling with limited machine availability
inferredcites →https://doi.org/10.1016/j.cie.2014.12.022openalex-snapshot
State of the art in simulation-based optimisation for maintenance systems
inferredcites →https://doi.org/10.1016/j.cie.2015.06.006openalex-snapshot
The scheduling of maintenance. A resource-constraints mixed integer linear programming model
inferredcites →https://doi.org/10.1016/j.compchemeng.2013.12.001openalex-snapshot
Scope for industrial applications of production scheduling models and solution methods
inferredcites →https://doi.org/10.1016/j.conengprac.2013.05.004openalex-snapshot
Benchmarking flexible job-shop scheduling and control systems
inferredcites →https://doi.org/10.1016/j.cor.2012.12.001openalex-snapshot
Approximating multi-objective scheduling problems
inferredcites →https://doi.org/10.1016/j.cor.2015.11.004openalex-snapshot
Heuristic approaches for scheduling jobs in large-scale flexible job shops
inferredcites →https://doi.org/10.1016/j.ejor.2015.08.045openalex-snapshot
Maintenance scheduling in the electricity industry: A literature review
inferredcites →https://doi.org/10.1016/j.engappai.2012.03.011openalex-snapshot
Literature review regarding Ant Colony Optimization applied to scheduling problems: Guidelines for implementation and directions for future research
inferredcites →https://doi.org/10.1016/j.eswa.2010.12.043openalex-snapshot
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
inferredcites →https://doi.org/10.1016/j.eswa.2011.09.076openalex-snapshot
A survey: Ant Colony Optimization based recent research and implementation on several engineering domain
inferredcites →https://doi.org/10.1016/j.eswa.2016.01.054openalex-snapshot
Robust job shop scheduling problem: Mathematical models, exact and heuristic algorithms
inferredcites →https://doi.org/10.1016/j.ifacol.2015.06.193openalex-snapshot
Decision Support System for Discrete Robust Berth Allocation
inferredcites →https://doi.org/10.1016/j.ifacol.2015.06.348openalex-snapshot
A New Heuristic Method for Solving Joint Job Shop Scheduling of Production and Maintenance
inferredcites →https://doi.org/10.1016/j.ijepes.2013.11.026openalex-snapshot
Application of a novel cost reduction index to preventive maintenance scheduling
inferredcites →https://doi.org/10.1016/j.ijpe.2007.01.014openalex-snapshot
Minimizing the makespan for the MPM job-shop with availability constraints
inferredcites →https://doi.org/10.1016/j.ijpe.2012.11.005openalex-snapshot
Chemical-reaction optimization for solving fuzzy job-shop scheduling problem with flexible maintenance activities
inferredcites →https://doi.org/10.1016/j.jmsy.2013.04.015openalex-snapshot
A novel hybrid meta-heuristic algorithm for solving multi objective flexible job shop scheduling
inferredcites →https://doi.org/10.1016/j.ress.2012.01.005openalex-snapshot
Preventive maintenance optimization for a multi-component system under changing job shop schedule
inferredcites →https://doi.org/10.1016/j.ress.2015.10.013openalex-snapshot
Joint optimization of production scheduling and machine group preventive maintenance
inferredcites →https://doi.org/10.1016/s0377-2217(98)00113-1openalex-snapshot
Deterministic job-shop scheduling: Past, present and future
inferredcites →https://doi.org/10.1057/jors.1990.166openalex-snapshot
OR-Library: Distributing Test Problems by Electronic Mail
inferredcites →https://doi.org/10.1080/00207540600990432openalex-snapshot
Multiple colony ant algorithm for job-shop scheduling problem
inferredcites →https://doi.org/10.1080/00207729708929360openalex-snapshot
A study of integer programming formulations for scheduling problems
inferredcites →https://doi.org/10.1080/15458830.1996.11770714openalex-snapshot
Scheduling: Theory, Algorithms, and Systems
inferredcites →https://doi.org/10.1109/tsmcc.2002.1009117openalex-snapshot
Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
inferredcites →https://doi.org/10.1287/opre.7.5.621openalex-snapshot
The Schedule-Sequencing Problem
inferredcites →https://doi.org/10.1287/opre.8.2.219openalex-snapshot
On the Job-Shop Scheduling Problem
inferredcites →https://doi.org/10.5281/zenodo.1255605openalex-snapshot
An Efficient Heuristic Algorithm For Flexible Job Shop Scheduling With Maintenance Constraints
inferredcites →https://doi.org/10.5402/2011/165620openalex-snapshot
Ant Colony Algorithm for Just-in-Time Job Shop Scheduling with Transportation Times and Multirobots

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4655413openalex-extracted
inferred← citeshttps://doi.org/10.1002/9781394306442.ch9openalex-snapshot
Precedence‐Based and Time‐Indexed Formulations for the Flexible Job Shop Scheduling with Machine Availability Constraints
inferred← citeshttps://doi.org/10.1007/978-3-030-61834-6_15openalex-snapshot
An Efficient Algorithm for Minimizing Regular Criteria in the Job-Shop Scheduling Multi-resource Resource Flexibility with Linear Routes
inferred← citeshttps://doi.org/10.1007/978-3-030-61834-6_18openalex-snapshot
A Hybrid Algorithm to Minimize Regular Criteria in the Job-shop Scheduling Problem with Maintenance Activities, Sequence Dependent and Set-up Times
inferred← citeshttps://doi.org/10.1007/978-3-031-43670-3_44openalex-snapshot
Reactive Flexible Job Shop Problem with Stress Level Consideration
inferred← citeshttps://doi.org/10.1007/978-3-032-04777-9_9openalex-snapshot
Swarm Intelligence-Driven Dispatching Rules for Semiconductor Production
inferred← citeshttps://doi.org/10.1007/978-3-032-13817-0_8openalex-snapshot
Flexible Job Shop Scheduling Optimization for Air Conditioner Assembly Using DDQN with Prioritized Experience Replay
inferred← citeshttps://doi.org/10.1007/978-981-15-3425-6_1openalex-snapshot
Review on the Improvement and Application of Ant Colony Algorithm
inferred← citeshttps://doi.org/10.1007/s00170-018-2805-0openalex-snapshot
Two-stage teaching-learning-based optimization method for flexible job-shop scheduling under machine breakdown
inferred← citeshttps://doi.org/10.1007/s00500-020-05347-zopenalex-snapshot
A novel multi-objective optimization algorithm for the integrated scheduling of flexible job shops considering preventive maintenance activities and transportation processes
inferred← citeshttps://doi.org/10.1007/s00500-021-06053-0openalex-snapshot
Greedy randomized adaptive search procedure for simultaneous scheduling of production and preventive maintenance activities in dynamic flexible job shops
inferred← citeshttps://doi.org/10.1007/s00500-022-07560-4openalex-snapshot
ACO-based approach for integrating product lifecycle management with MRO services in aviation industry
inferred← citeshttps://doi.org/10.1007/s10696-021-09403-0openalex-snapshot
Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics
inferred← citeshttps://doi.org/10.1007/s10732-021-09482-0openalex-snapshot
A two-phase approach for integrating preventive maintenance with production and delivery in an unreliable coal mine
inferred← citeshttps://doi.org/10.1007/s12555-023-0578-1openalex-snapshot
A Review on Intelligent Scheduling and Optimization for Flexible Job Shop
inferred← citeshttps://doi.org/10.1007/s12652-018-0737-zopenalex-snapshot
A heuristic scheduling method for the pipe-spool fabrication process
inferred← citeshttps://doi.org/10.1007/s43069-021-00098-5openalex-snapshot
Developing a Flexible Manufacturing Control System Considering Mixed Uncertain Predictive Maintenance Model: a Simulation-Based Optimization Approach
inferred← citeshttps://doi.org/10.1007/s43069-024-00312-0openalex-snapshot
Artificial Intelligence Application in Production Scheduling Problem Systematic Literature Review: Bibliometric Analysis, Research Trend, and Knowledge Taxonomy
inferred← citeshttps://doi.org/10.1016/j.ajsl.2018.06.014openalex-snapshot
A Robust Metaheuristic for the Rail Shuttle Routing Problem with Uncertainty: A Real Case Study in the Le Havre Port
inferred← citeshttps://doi.org/10.1016/j.asoc.2021.107960openalex-snapshot
A simulation-based modified backtracking search algorithm for multi-objective stochastic flexible job shop scheduling problem with worker flexibility
inferred← citeshttps://doi.org/10.1016/j.asoc.2025.112697openalex-snapshot
A knowledge-driven memetic algorithm for distributed green flexible job shop scheduling considering the endurance of machines
inferred← citeshttps://doi.org/10.1016/j.cherd.2020.04.016openalex-snapshot
Dynamic hybrid scheduling of crude oil using structure adapted genetic algorithm for uncertainty of tank unavailability
inferred← citeshttps://doi.org/10.1016/j.cie.2017.03.006openalex-snapshot
Two stage particle swarm optimization to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns
inferred← citeshttps://doi.org/10.1016/j.cie.2018.07.006openalex-snapshot
Including preventive maintenance activities in an unrelated parallel machine environment with dependent setup times
inferred← citeshttps://doi.org/10.1016/j.cie.2018.11.024openalex-snapshot
Optimization model and online task interleaving scheduling algorithm for MIMO radar
inferred← citeshttps://doi.org/10.1016/j.cie.2018.12.061openalex-snapshot
An effective hybrid discrete grey wolf optimizer for the casting production scheduling problem with multi-objective and multi-constraint
inferred← citeshttps://doi.org/10.1016/j.cie.2019.03.022openalex-snapshot
A novel approach based on Neo4j for multi-constrained flexible job shop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.cie.2019.04.051openalex-snapshot
Prognostic and health management for adaptive manufacturing systems with online sensors and flexible structures
inferred← citeshttps://doi.org/10.1016/j.cie.2020.106280openalex-snapshot
An efficient evolutionary grey wolf optimizer for multi-objective flexible job shop scheduling problem with hierarchical job precedence constraints
inferred← citeshttps://doi.org/10.1016/j.cie.2020.106781openalex-snapshot
Flexible job-shop scheduling problem with job precedence constraints and interval grey processing time
inferred← citeshttps://doi.org/10.1016/j.cie.2020.106863openalex-snapshot
An effective backtracking search algorithm for multi-objective flexible job shop scheduling considering new job arrivals and energy consumption
inferred← citeshttps://doi.org/10.1016/j.cie.2022.108130openalex-snapshot
Robust job-shop scheduling under deterministic and stochastic unavailability constraints due to preventive and corrective maintenance
inferred← citeshttps://doi.org/10.1016/j.cie.2022.108379openalex-snapshot
A flexible smart manufacturing system in mass personalization manufacturing model based on multi-module-platform, multi-virtual-unit, and multi-production-line
inferred← citeshttps://doi.org/10.1016/j.cie.2022.108786openalex-snapshot
Survey of integrated flexible job shop scheduling problems
inferred← citeshttps://doi.org/10.1016/j.cie.2023.109424openalex-snapshot
Dynamic opportunistic maintenance grouping in a lot streaming based job-shop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.cie.2024.110269openalex-snapshot
Household health and medical care consumption decisions considering intertemporal uncertainty
inferred← citeshttps://doi.org/10.1016/j.cirpj.2021.03.006openalex-snapshot
Quantum algorithms for process parallel flexible job shop scheduling
inferred← citeshttps://doi.org/10.1016/j.compchemeng.2017.05.004openalex-snapshot
An energy-efficient multi-objective optimization for flexible job-shop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.cor.2022.105731openalex-snapshot
A survey of job shop scheduling problem: The types and models
inferred← citeshttps://doi.org/10.1016/j.cor.2023.106365openalex-snapshot
A multi-agent system for integrated scheduling and maintenance planning of the flexible job shop
inferred← citeshttps://doi.org/10.1016/j.cor.2025.107059openalex-snapshot
A hybrid approach using ant colony optimisation for integrated scheduling of production and transportation tasks within flexible manufacturing systems
inferred← citeshttps://doi.org/10.1016/j.cor.2026.107555openalex-snapshot
Machine-aligned multi-agent reinforcement learning for dynamic flexible job shop scheduling
inferred← citeshttps://doi.org/10.1016/j.ejor.2023.05.017openalex-snapshot
The flexible job shop scheduling problem: A review
inferred← citeshttps://doi.org/10.1016/j.engappai.2025.110882openalex-snapshot
Hybrid Gaussian quantum particle swarm optimization and adaptive genetic algorithm for flexible job-shop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.eswa.2018.12.034openalex-snapshot
Comparison of new metaheuristics, for the solution of an integrated jobs-maintenance scheduling problem
inferred← citeshttps://doi.org/10.1016/j.ifacol.2023.10.186openalex-snapshot
A Mathematical Model for the Flexible Job Shop Scheduling Problem With Availability Constraints
inferred← citeshttps://doi.org/10.1016/j.inffus.2018.10.005openalex-snapshot
Data fusion and machine learning for industrial prognosis: Trends and perspectives towards Industry 4.0
inferred← citeshttps://doi.org/10.1016/j.jmsy.2021.09.018openalex-snapshot
Real-time integrated production-scheduling and maintenance-planning in a flexible job shop with machine deterioration and condition-based maintenance
inferred← citeshttps://doi.org/10.1016/j.jmsy.2024.02.007openalex-snapshot
Hybrid quantum particle swarm optimization and variable neighborhood search for flexible job-shop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.jmsy.2024.03.012openalex-snapshot
A novel collaborative agent reinforcement learning framework based on an attention mechanism and disjunctive graph embedding for flexible job shop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.measen.2023.100944openalex-snapshot
Towards intelligent industrial systems: A comprehensive survey of sensor fusion techniques in IIoT
inferred← citeshttps://doi.org/10.1016/j.measurement.2017.09.022openalex-snapshot
An effective hybrid multi objective evolutionary algorithm for solving real time event in flexible job shop scheduling problem
inferred← citeshttps://doi.org/10.1016/j.procir.2020.04.067openalex-snapshot
Dynamic risk consideration of predicted maintenance needs regarding economic efficiency
inferred← citeshttps://doi.org/10.1016/j.procir.2021.11.307openalex-snapshot
A prescriptive maintenance system for intelligent production planning and control in a smart cyber-physical production line
inferred← citeshttps://doi.org/10.1016/j.promfg.2020.01.263openalex-snapshot
Simulation and Analysis of Preventive Maintenance Scheduling Techniques for Fruit-Roll Packaging Line
inferred← citeshttps://doi.org/10.1016/j.rcim.2019.01.005openalex-snapshot
Merits of using chromosome representations and shadow chromosomes in genetic algorithms for solving scheduling problems
inferred← citeshttps://doi.org/10.1016/j.rcim.2020.101933openalex-snapshot
A two-layer social network model for manufacturing service composition based on synergy: A case study on an aircraft structural part
inferred← citeshttps://doi.org/10.1016/j.rcim.2021.102311openalex-snapshot
Sustainable service oriented equipment maintenance management of steel enterprises using a two-stage optimization approach
inferred← citeshttps://doi.org/10.1016/j.ress.2020.107047openalex-snapshot
Joint optimization of opportunistic maintenance and production scheduling considering batch production mode and varying operational conditions
inferred← citeshttps://doi.org/10.1016/j.swevo.2019.100572openalex-snapshot
A three-level particle swarm optimization with variable neighbourhood search algorithm for the production scheduling problem with mould maintenance
inferred← citeshttps://doi.org/10.1021/acs.iecr.1c03863openalex-snapshot
Simultaneous Production and Maintenance Scheduling for Refinery Front-End Process with Considerations of Risk Management and Resource Availability
inferred← citeshttps://doi.org/10.1038/s41598-024-73473-xopenalex-snapshot
Hybrid golden jackal and golden sine optimizer for tuning PID controllers
inferred← citeshttps://doi.org/10.1080/00207543.2018.1459923openalex-snapshot
A mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry
inferred← citeshttps://doi.org/10.1080/00207543.2018.1492752openalex-snapshot
The model of maintenance planning and production scheduling for maximising robustness
inferred← citeshttps://doi.org/10.1080/00207543.2019.1701209openalex-snapshot
Multi-objective particle swarm optimisation based integrated production inventory routing planning for efficient perishable food logistics operations
inferred← citeshttps://doi.org/10.1080/00207543.2021.1902013openalex-snapshot
Integrated production-inventory-routing problem for multi-perishable products under uncertainty by meta-heuristic algorithms
inferred← citeshttps://doi.org/10.1080/0305215x.2021.1983558openalex-snapshot
Auction-based approach to the job-shop problem with parallel batch processing and a machine availability constraint
inferred← citeshttps://doi.org/10.1080/0951192x.2019.1571236openalex-snapshot
PriMa: a prescriptive maintenance model for cyber-physical production systems
inferred← citeshttps://doi.org/10.1080/17477778.2024.2429568openalex-snapshot
Solving the combined flexible job shop scheduling and vehicle routing problem with stochastic features
inferred← citeshttps://doi.org/10.1080/24725854.2022.2100523openalex-snapshot
Robust optimization for integrating preventative maintenance with coal production under demand uncertainty
inferred← citeshttps://doi.org/10.1108/aa-10-2018-0165openalex-snapshot
Robust scheduling in two-stage assembly flow shop problem with random machine breakdowns: integrated meta-heuristic algorithms and simulation approach
inferred← citeshttps://doi.org/10.1108/ijicc-10-2018-0136openalex-snapshot
A hybrid genetic algorithm for multi-objective flexible job shop scheduling problem considering transportation time
inferred← citeshttps://doi.org/10.1109/access.2021.3076732openalex-snapshot
A Bayesian-Grouping Based Hybrid Distributed Cooperative Evolutionary Optimization for Large-Scale Flexible Job-Shop Scheduling Problem
inferred← citeshttps://doi.org/10.1109/jas.2019.1911540openalex-snapshot
A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems
inferred← citeshttps://doi.org/10.1109/powercon66300.2025.11295307openalex-snapshot
Analysis of Multi-UAV Mission Planning Technology for Overhead Transmission Line Inspection
inferred← citeshttps://doi.org/10.1109/rams.2019.8768908openalex-snapshot
Energy-efficient optimization of Flexible Job Shop Scheduling and Preventive Maintenance
inferred← citeshttps://doi.org/10.1109/tase.2026.3674641openalex-snapshot
Joint Job Scheduling and Maintenance Operation in Production Systems: Emerging Trends and Future Horizons From Industry 4.0 to 5.0
inferred← citeshttps://doi.org/10.1111/itor.13108openalex-snapshot
Shop scheduling in manufacturing environments: a review
inferred← citeshttps://doi.org/10.1155/2022/6938811openalex-snapshot
A Diversified Integration Method of IPE Teaching Resources Based on Ant Colony Algorithm
inferred← citeshttps://doi.org/10.1177/1687814018801442openalex-snapshot
An effective hybrid algorithm for multi-objective flexible job-shop scheduling problem
inferred← citeshttps://doi.org/10.1177/1748006x231205185openalex-snapshot
Bi-objective flexible job shop scheduling on machines considering condition-based maintenance activities
inferred← citeshttps://doi.org/10.1177/18758967261441908openalex-snapshot
Energy-efficient Flexible Job Shop Scheduling Problem Considering Preventive Maintenance and Transportation Times
inferred← citeshttps://doi.org/10.1631/fitee.2400492openalex-snapshot
Enhanced hippopotamus optimization algorithm for tuning proportional–integral–derivative controllers
inferred← citeshttps://doi.org/10.17341/gazimmfd.1825212openalex-snapshot
Sıra bağımlı hazırlık süreli paralel makine ortamlarında eş zamanlı üretim ve bakım çizelgeleme problemi Endüstri 4.0 tabanlı gerçek zamanlı bir optimizasyon modeli
inferred← citeshttps://doi.org/10.17482/uumfd.856513openalex-snapshot
737 BAKIM FAALİYETLERİNİ DİKKATE ALAN MAKİNE ÇİZELGELEME: LİTERATÜR ARAŞTIRMASI
inferred← citeshttps://doi.org/10.21203/rs.3.rs-4442314/v1openalex-snapshot
Integration of Kalman Filter with Ant Colony Optimization for Solving the Job Shop Scheduling Problem
inferred← citeshttps://doi.org/10.21608/eijest.2021.63497.1049openalex-snapshot
A Review of Implementing Ant System Algorithms on Scheduling Problems
inferred← citeshttps://doi.org/10.24200/sci.2023.60313.6727openalex-snapshot
Concurrent Optimization of Reliability, Maintainability and Total Cost in a Job Shop Production System with Multiple Fuzzy Parameters
inferred← citeshttps://doi.org/10.3233/mgs-180286openalex-snapshot
A hybrid genetic algorithm with a neighborhood function for flexible job shop scheduling
inferred← citeshttps://doi.org/10.32920/19780162openalex-snapshot
Energy-aware flexible job shop scheduling problem and preventive maintenance under the limited resource constraints
inferred← citeshttps://doi.org/10.32920/19780162.v1openalex-snapshot
Energy-aware flexible job shop scheduling problem and preventive maintenance under the limited resource constraints
inferred← citeshttps://doi.org/10.32920/24058728openalex-snapshot
Real-Time Optimization of Production Scheduling: Strategies, Models, and Algorithms
inferred← citeshttps://doi.org/10.32920/24058728.v1openalex-snapshot
Real-Time Optimization of Production Scheduling: Strategies, Models, and Algorithms
inferred← citeshttps://doi.org/10.33889/ijmems.2025.10.6.082openalex-snapshot
Optimizing Multi-Technician Work Order Scheduling: A Dispatching Rule Algorithm Approach to Reduce Downtime
inferred← citeshttps://doi.org/10.3390/app11114741openalex-snapshot
Graph-Based Modeling in Shop Scheduling Problems: Review and Extensions
inferred← citeshttps://doi.org/10.3390/app15137589openalex-snapshot
Advanced Planning Systems in Production Planning Control: An Ethical and Sustainable Perspective in Fashion Sector
inferred← citeshttps://doi.org/10.3390/ma14195806openalex-snapshot
Model of Production System Evaluation with the Influence of FDM Machine Reliability and Process-Dependent Product Quality
inferred← citeshttps://doi.org/10.3390/pr13020386openalex-snapshot
Solving Dynamic Multi-Objective Flexible Job Shop Scheduling Problems Using a Dual-Level Integrated Deep Q-Network Approach
inferred← citeshttps://doi.org/10.4995/wpom.v11i2.14187openalex-snapshot
Partial flexible job shop scheduling considering preventive maintenance and priorities
inferred← citeshttps://doi.org/10.5829/ije.2024.37.08b.13openalex-snapshot
Flexible Job Shop Scheduling Problem Considering Upper Bounds for the Amount of Interruptions Between Operations and Machines Maintenance Activities
inferred← citeshttps://doi.org/10.70675/cdb0051dz5a07z474ezb534z4aef357a004eopenalex-snapshot
Optimisation et simulation de la massification du transport multimodal de conteneurs
inferred← citeshttps://doi.org/10.9744/jti.23.1.65-74openalex-snapshot
The Unrelated Parallel Machine Scheduling with a Dependent Time Setup using Ant Colony Optimization Algorithm
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.