On the public citation graph

Exploring Monte Carlo Simulation Applications for Project Management

https://doi.org/10.1057/palgrave.rm.8250017
0 signed · 180 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1016/s0006-3495(03)75126-1openalex-snapshot
FRET or No FRET: A Quantitative Comparison
inferredcites →https://doi.org/10.1016/s0166-4972(03)00033-6openalex-snapshot
Project risk management: lessons learned from software development environment
inferredcites →https://doi.org/10.1038/sj.hdy.6882530openalex-snapshot
Multi-interval mapping of correlated trait complexes
inferredcites →https://doi.org/10.1057/palgrave.jors.2601739openalex-snapshot
Functional estimation of activity criticality indices and sensitivity analysis of expected project completion time
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1996)122:4(308)openalex-snapshot
Project-Network Analysis Using Fuzzy Sets Theory
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2000)126:4(298)openalex-snapshot
Investment Risk Analysis in Airport Parking Facility Development
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2002)128:5(456)openalex-snapshot
Analytical and Approximate Variance of Total Project Cost
inferredcites →https://doi.org/10.1080/00137919808903195openalex-snapshot
On the Use of Martingales in Monte Carlo approaches to multiperiod Parameter Uncertainty in Capital Investment Risk Analysis
inferredcites →https://doi.org/10.1080/00220389908422623openalex-snapshot
Refining the use of Monte Carlo techniques for risk analysis in project planning
inferredcites →https://doi.org/10.1080/00268970310001632309openalex-snapshot
Improving the sampling efficiency of Monte Carlo molecular simulations: an evolutionary approach
inferredcites →https://doi.org/10.1080/01621459.1949.10483310openalex-snapshot
The Monte Carlo Method
inferredcites →https://doi.org/10.1080/10635150590923254openalex-snapshot
Towards Building the Tree of Life: A Simulation Study for All Angiosperm Genera
inferredcites →https://doi.org/10.1093/ije/30.4.771openalex-snapshot
The economics of ‘more research is needed’
inferredcites →https://doi.org/10.1093/imaman/14.1.3openalex-snapshot
The contribution of mathematical modelling to the practice of project management
inferredcites →https://doi.org/10.1108/00251749410071595openalex-snapshot
Incorporating Risk into Capital Budgeting Decisions Using Simulation
inferredcites →https://doi.org/10.1109/52.526838openalex-snapshot
Large-scale project management is risk management
inferredcites →https://doi.org/10.1139/l03-019openalex-snapshot
Prediction and mitigation of construction noise in an urban environment
inferredcites →https://doi.org/10.1139/t02-034openalex-snapshot
Probabilistic slope stability analysis for practice
inferredcites →https://doi.org/10.1147/rd.492.0489openalex-snapshot
Optimizing task layout on the Blue Gene/L supercomputer
inferredcites →https://doi.org/10.1175/1520-0450(2003)042<1837:euaogm>2.0.co;2openalex-snapshot
Error Uncertainty Analysis of GPCP Monthly Rainfall Products: A Data-Based Simulation Study
inferredcites →https://doi.org/10.1243/147509005x10404openalex-snapshot
Monte Carlo simulation of damaged ship survivability
inferredcites →https://doi.org/10.1515/156939603322728987openalex-snapshot
Project duration prediction using a Monte Carlo simulation of the periodic output of the project resources
inferredcites →https://doi.org/10.2165/00019053-200321050-00001openalex-snapshot
A Simulation Model for Estimating Direct Costs of Type 1 Diabetes Prevention

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.1594116openalex-extracted
Simulation-Based Valuation of Project Finance - Does Model Complexity Really Matter?
inferred← citeshttps://doi.org/10.2139/ssrn.2845560openalex-extracted
Incorporating Risk and Uncertainty in Cost-Benefit Analysis
inferred← citeshttps://doi.org/10.2139/ssrn.2872142openalex-extracted
Moments and Distribution of the NPV of a Project
inferred← citeshttps://doi.org/10.2139/ssrn.4585886openalex-extracted
Analysing the Impact of Risk Management Practice on Construction Project Performance: A Systematic Literature Review
inferred← citeshttps://doi.org/10.1002/nme.5702openalex-snapshot
Modeling of uncertainty for flood wave propagation induced by variations in initial and boundary conditions using expectation operator on explicit numerical solutions
inferred← citeshttps://doi.org/10.1007/978-1-4471-6723-5_12openalex-snapshot
Project Management for Product Development
inferred← citeshttps://doi.org/10.1007/978-1-4471-7531-5_12openalex-snapshot
Project Management for Product Development
inferred← citeshttps://doi.org/10.1007/978-3-030-03813-7_8openalex-snapshot
Procedure Model for Supply Chain Digitalization Scenarios for a Data-Driven Supply Chain Risk Management
inferred← citeshttps://doi.org/10.1007/978-3-030-81123-5_10openalex-snapshot
Optimization for Project Risk Management
inferred← citeshttps://doi.org/10.1007/978-3-319-21407-8_21openalex-snapshot
Geostatistics Applied to the Geoprospective
inferred← citeshttps://doi.org/10.1007/978-3-319-54490-8_15openalex-snapshot
Russian Mechanism to Support Renewable Energy Investments: Before and After Analysis
inferred← citeshttps://doi.org/10.1007/s00791-015-0258-7openalex-snapshot
An efficient approach for calculating default probabilities for cash-flow based project finance with reserve account
inferred← citeshttps://doi.org/10.1007/s11431-015-5781-8openalex-snapshot
Construction schedule risk analysis of high roller-compacted concrete dams based on improved CSRAM
inferred← citeshttps://doi.org/10.1007/s11740-022-01172-5openalex-snapshot
The 3Es framework: a project framework for simulating costs for engineering efforts under uncertainties in the healthcare solution industry
inferred← citeshttps://doi.org/10.1007/s12647-019-00345-5openalex-snapshot
Monte Carlo Simulation in Uncertainty Evaluation: Strategy, Implications and Future Prospects
inferred← citeshttps://doi.org/10.1007/s12665-023-11045-4openalex-snapshot
A framework for assessing hazards related to pit lakes: application on European case studies
inferred← citeshttps://doi.org/10.1007/s13369-015-1597-xopenalex-snapshot
Measuring Flexibility in Software Project Schedules
inferred← citeshttps://doi.org/10.1007/s40430-016-0576-9openalex-snapshot
Risk quantification combining geostatistical realizations and discretized Latin Hypercube
inferred← citeshttps://doi.org/10.1007/s40614-021-00318-7openalex-snapshot
Monte Carlo Analyses for Single-Case Experimental Designs: An Untapped Resource for Applied Behavioral Researchers and Practitioners
inferred← citeshttps://doi.org/10.1016/b978-0-12-821187-8.00009-5openalex-snapshot
Prediction and classification of diabetes mellitus using genomic data
inferred← citeshttps://doi.org/10.1016/j.aei.2014.09.001openalex-snapshot
BIM extension for the sustainability appraisal of conceptual steel design
inferred← citeshttps://doi.org/10.1016/j.apenergy.2018.09.170openalex-snapshot
Assessing energy storage technology options using a multi-criteria decision analysis-based framework
inferred← citeshttps://doi.org/10.1016/j.apmt.2018.03.004openalex-snapshot
Metallic nanowires: Mechanical properties – Theory and experiment
inferred← citeshttps://doi.org/10.1016/j.aquaculture.2014.10.035openalex-snapshot
Private incentives for the emergence of co-production of offshore wind energy and mussel aquaculture
inferred← citeshttps://doi.org/10.1016/j.asoc.2026.115030openalex-snapshot
A multi-expert Fermatean fuzzy approach to improve the critical path method under uncertainty
inferred← citeshttps://doi.org/10.1016/j.cie.2021.107537openalex-snapshot
On the project risk baseline: Integrating aleatory uncertainty into project scheduling
inferred← citeshttps://doi.org/10.1016/j.cie.2024.110694openalex-snapshot
A simheuristic for project portfolio optimization combining individual project risk, scheduling effects, interruptions, and project risk correlations
inferred← citeshttps://doi.org/10.1016/j.cie.2025.111021openalex-snapshot
Optimizing bio-hydrogen production from agri-waste: A digital twin approach for sustainable supply chain management and carbon neutrality
inferred← citeshttps://doi.org/10.1016/j.cor.2020.105104openalex-snapshot
An evolutionary approach for resource constrained project scheduling with uncertain changes
inferred← citeshttps://doi.org/10.1016/j.cropro.2013.03.016openalex-snapshot
Predicted economic impact of black Sigatoka on the Australian banana industry
inferred← citeshttps://doi.org/10.1016/j.dss.2015.08.002openalex-snapshot
A multivariate approach for top-down project control using earned value management
inferred← citeshttps://doi.org/10.1016/j.ejor.2016.11.018openalex-snapshot
A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence
inferred← citeshttps://doi.org/10.1016/j.eswa.2021.114635openalex-snapshot
Minimizing activity exposures in project scheduling under uncertainty
inferred← citeshttps://doi.org/10.1016/j.health.2021.100008openalex-snapshot
The application of industry 4.0 technologies in pandemic management: Literature review and case study
inferred← citeshttps://doi.org/10.1016/j.ifacol.2022.09.423openalex-snapshot
Multi-Partners Digital Project Twin: A Tool for Project Monitoring
inferred← citeshttps://doi.org/10.1016/j.ijpe.2022.108463openalex-snapshot
Coastal housing recovery in a postdisaster environment: A supply chain perspective
inferred← citeshttps://doi.org/10.1016/j.ijproman.2012.02.001openalex-snapshot
Reasonable concession period for build-operate-transfer road projects in the Philippines
inferred← citeshttps://doi.org/10.1016/j.ijproman.2014.09.005openalex-snapshot
A review of analytical models, approaches and decision support tools in project monitoring and control
inferred← citeshttps://doi.org/10.1016/j.jclepro.2020.120046openalex-snapshot
Integrating life-cycle assessment and life-cycle cost analysis to select sustainable pavement: A probabilistic model using managerial flexibilities
inferred← citeshttps://doi.org/10.1016/j.jclepro.2023.137597openalex-snapshot
Assessing the effects of unit cost uncertainty on flexible road pavement economics under the influence of climate change
inferred← citeshttps://doi.org/10.1016/j.orp.2020.100170openalex-snapshot
Survive IT! Survival analysis of IT project planning approaches
inferred← citeshttps://doi.org/10.1016/j.sbspro.2013.12.568openalex-snapshot
Monte Carlo Method Application for Environmental Risks Impact Assessment in Investment Projects
inferred← citeshttps://doi.org/10.1016/j.sbspro.2014.03.003openalex-snapshot
Effect of Network's Morphology and Merge Bias Correction Procedures on Project Duration Mean and Variance
inferred← citeshttps://doi.org/10.1016/j.sbspro.2014.03.095openalex-snapshot
Improving Risk Sharing and Investment Appraisal for PPP Procurement Success in Large Green Projects
inferred← citeshttps://doi.org/10.1016/j.scitotenv.2022.157301openalex-snapshot
Life cycle assessment of transparent wood production using emerging technologies and strategic scale-up framework
inferred← citeshttps://doi.org/10.1016/j.techfore.2025.124456openalex-snapshot
Managing cybersecurity risks in Small businesses: A simulation-based decision framework
inferred← citeshttps://doi.org/10.1016/j.tmp.2021.100857openalex-snapshot
Measuring risks and vulnerability of tourism to the COVID-19 crisis in the context of extreme uncertainty: The case of the Balearic Islands
inferred← citeshttps://doi.org/10.1016/s2212-5671(14)00463-8openalex-snapshot
Monte Carlo Method in Risk Analysis for Investment Projects
inferred← citeshttps://doi.org/10.1017/s1074070800029059openalex-snapshot
Economics and Uncertainty of Lignocellulosic Biofuel Production from Energy Cane and Sweet Sorghum in South Texas
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0001022openalex-snapshot
Empirical Perspective on Activity Durations for Project-Management Simulation Studies
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0001207openalex-snapshot
New Approach to Estimating the Standard Deviations of Lognormal Cost Variables in the Monte Carlo Analysis of Construction Risks
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0001996openalex-snapshot
Fuzzy Linear and Repetitive Scheduling for Construction Projects
inferred← citeshttps://doi.org/10.1061/(asce)cp.1943-5487.0000264openalex-snapshot
Group Decision Making for Stochastic Optimization of Time, Cost, and Quality in Construction Projects
inferred← citeshttps://doi.org/10.1061/(asce)is.1943-555x.0000720openalex-snapshot
Early Termination Mechanism of Public–Private Partnership Transportation Projects with Government Guarantee
inferred← citeshttps://doi.org/10.1061/(asce)me.1943-5479.0000742openalex-snapshot
Optimal Design of Energy Storage System to Buffer Charging Infrastructure in Smart Cities
inferred← citeshttps://doi.org/10.1061/(asce)me.1943-5479.0001071openalex-snapshot
Managing Interdependence-Induced Systemic Risks in Infrastructure Projects
inferred← citeshttps://doi.org/10.1061/9780784480274.159openalex-snapshot
Risk Analysis in the Subcontractor Selection Process for International Construction Projects
inferred← citeshttps://doi.org/10.1061/ajrua6.rueng-1390openalex-snapshot
Mitigating Engineering Phase Delays in EPC Projects: Monte Carlo Simulation Method with Project XYZ
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-13014openalex-snapshot
Decision Framework for Efficient Risk Mitigation in BOT Highway Infrastructure Service Projects
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-13753openalex-snapshot
Choice of Probability Distributions for Activity Durations in Project Networks with Limited Sample Size
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-15381openalex-snapshot
Data-Driven Assessment of Complexity-Induced Risks in Infrastructure Projects
inferred← citeshttps://doi.org/10.1061/jmenea.meeng-5900openalex-snapshot
Dynamic Real-Time Optimization of Modular Unit Allocation to Off-Site Facilities in Postdisaster Reconstruction Using Deep Reinforcement Learning
inferred← citeshttps://doi.org/10.1063/5.0000918openalex-snapshot
Analysis of risk factors nonproductive time on geothermal drilling in Indonesia
inferred← citeshttps://doi.org/10.1063/5.0095771openalex-snapshot
Analysis of overbreak effect on rockbolt cost in Extraction level Panel 29 West at PT freeport Indonesia using Monte Carlo regression and simulation analysis
inferred← citeshttps://doi.org/10.1063/5.0235679openalex-snapshot
Analysis of inventory system for jewelry raw materials using Monte Carlo simulation
inferred← citeshttps://doi.org/10.1080/01446193.2022.2034906openalex-snapshot
Monte Carlo simulation approach to understand the cost variance for energy retrofit projects: comparative study of Finland and the United States
inferred← citeshttps://doi.org/10.1088/1755-1315/1639/1/012025openalex-snapshot
Monte Carlo Simulation Approach to Predict the Toll Road Revenue
inferred← citeshttps://doi.org/10.1108/15982681211265472openalex-snapshot
Capacity and availability management by quantitative project management in the IT service industry
inferred← citeshttps://doi.org/10.1108/17538370810906255openalex-snapshot
Risk management framework for pharmaceutical research and development projects
inferred← citeshttps://doi.org/10.1108/17554251211247599openalex-snapshot
Scenario planning for service quality: a Monte Carlo simulation study
inferred← citeshttps://doi.org/10.1108/bepam-11-2016-0058openalex-snapshot
Simulation techniques for cost management and performance in construction projects in Malaysia
inferred← citeshttps://doi.org/10.1108/ecam-03-2014-0039openalex-snapshot
Contingency modelling for construction projects using fuzzy-set theory
inferred← citeshttps://doi.org/10.1108/md-06-2021-0804openalex-snapshot
From ambiguity to action: integrating collective sensemaking and rational decision making in management pedagogy and practice
inferred← citeshttps://doi.org/10.1108/sef-05-2018-0149openalex-snapshot
Risk-adjusted pricing of project loans
inferred← citeshttps://doi.org/10.1109/access.2026.3723786openalex-snapshot
Schedule Risk and Execution Challenges in Hyperscale Data-Center Construction: A Qualitative Case Study
inferred← citeshttps://doi.org/10.1109/aparm49247.2020.9209516openalex-snapshot
Simulation-based approach for risk assessment in onshore wind farm construction projects
inferred← citeshttps://doi.org/10.1109/asiancon66527.2025.11280977openalex-snapshot
Portfolio Optimization using the Monte Carlo Method: Stochastic Models for Efficient Asset Allocation
inferred← citeshttps://doi.org/10.1109/ems.2015.35openalex-snapshot
A Probability Model for the Size of Investment Projects
inferred← citeshttps://doi.org/10.1109/idaacs.2011.6072907openalex-snapshot
Managing large HW/SW Codesign projects
inferred← citeshttps://doi.org/10.1109/idaacs.2017.8095141openalex-snapshot
Multi-agent system of IT project planning
inferred← citeshttps://doi.org/10.1109/wsc.2015.7408222openalex-snapshot
Improving business project performance by increasing the effectiveness of resource capacity and allocation policies
inferred← citeshttps://doi.org/10.1109/wsc.2015.7408501openalex-snapshot
A comparison of the usage of different approaches for the management of plant engineering projects
inferred← citeshttps://doi.org/10.1111/radm.12183openalex-snapshot
Structuring innovation funnels for R & D projects under uncertainty
inferred← citeshttps://doi.org/10.1145/3557738.3557847openalex-snapshot
Feasibility Evaluation Analysis of Mobile Tower Using Sensitivity Analysis and Monte Carlo Simulation
inferred← citeshttps://doi.org/10.11594/nstp.2020.0529openalex-snapshot
Optimization of Annual and Five Years Tax Payment Services for Motorized Vehicles in Samsat "X"
inferred← citeshttps://doi.org/10.11606/d.96.2013.tde-07112013-100105openalex-snapshot
Análise de viabilidade sócio-ambiental e econômica de alternativas de produção energética de subprodutos do sistema sucroenergético para usinas da região de Ribeirão Preto - SP
inferred← citeshttps://doi.org/10.1201/b11903-3openalex-snapshot
Model Systems and Architecture Behavior
inferred← citeshttps://doi.org/10.1287/ited.2018.0200openalex-snapshot
Using a Monte Carlo Simulation Exercise to Teach Principles of Distribution: An Enhanced Version of the Classic Transportation Problem
inferred← citeshttps://doi.org/10.1287/mnsc.1120.1653openalex-snapshot
Total Cost Control in Project Management via Satisficing
inferred← citeshttps://doi.org/10.14488/1676-1901.v11i2.737openalex-snapshot
Simulação aplicada ao gerenciamento de projetos: uma revisão
inferred← citeshttps://doi.org/10.14710/j.gauss.12.1.81-91openalex-snapshot
PENGUKURAN NILAI RISIKO PORTOFOLIO SAHAM PADA INDEKS LQ45 DI BIDANG TELEKOMUNIKASI MENGUNAKAN METODE KOPULA CLAYTON
inferred← citeshttps://doi.org/10.1504/ijlsm.2014.065499openalex-snapshot
Scheduling new product development projects using simulation-based dependency structure matrix
inferred← citeshttps://doi.org/10.15548/jostech.v1i1.2440openalex-snapshot
Ekspektasi Maksimum Percentage Drawdown pada data Saham PT. Mayora Tbk dengan simulasi Monte Carlo
inferred← citeshttps://doi.org/10.18273/revuin.v23n1-2024011openalex-snapshot
Quantitative Risk Analysis for Construction Projects Considering Risks Correlations and Fuzzy Logic
inferred← citeshttps://doi.org/10.19101/ijatee.2022.10100150openalex-snapshot
Predicting initial duration of project using linear and nonlinear regression models
inferred← citeshttps://doi.org/10.20868/upm.thesis.56394openalex-snapshot
Factor de visibilidad nuevo indicador para la evaluación cuantitativa de riesgos
inferred← citeshttps://doi.org/10.21834/ajqol.v5i18.204openalex-snapshot
Monte Carlo Simulation for Cost Forecasting in the Green Building Project
inferred← citeshttps://doi.org/10.21834/e-bpj.v5i13.2101openalex-snapshot
A Conceptual Study on the Monte Carlo Simulation for Cost Forecasting in the Green Building Project
inferred← citeshttps://doi.org/10.22004/ag.econ.154295openalex-snapshot
An Economic Analysis of Wine Grape Production in the State of Connecticut
inferred← citeshttps://doi.org/10.22158/asir.v8n2p102openalex-snapshot
Assessing the Environmental, Economic, and Route Optimization Impacts of Implementing a Green Bus System in Urban Areas
inferred← citeshttps://doi.org/10.22214/ijraset.2020.5116openalex-snapshot
Application of Operation Research Techniques in Agriculture
inferred← citeshttps://doi.org/10.22260/isarc2012/0037openalex-snapshot
Fuzzy Set-Based Contingency Estimating and Management
inferred← citeshttps://doi.org/10.22434/ifamr2015.0179openalex-snapshot
Economic feasibility of tobacco leaves for biofuel production and high value squalene
inferred← citeshttps://doi.org/10.22487/renstra.v3i2.448openalex-snapshot
Estimating Project Completion Time with Monte Carlo Simulation
inferred← citeshttps://doi.org/10.24036/unpjomath.v7i4.13769openalex-snapshot
Simulasi Monte Carlo dan Penerapannya dalam Menentukan Probabilitas Pergerakan Saham Indeks LQ-45
inferred← citeshttps://doi.org/10.24912/jmts.v7i3.28079openalex-snapshot
PERBANDINGAN KELAYAKAN FINANSIAL GEDUNG GREEN BUILDING DAN NON- GREEN BUILDING MENGGUNAKAN METODE MONTE CARLO
inferred← citeshttps://doi.org/10.2495/cmem150171openalex-snapshot
The building blocks of risk theory and methodology
inferred← citeshttps://doi.org/10.2507/27th.daaam.proceedings.099openalex-snapshot
Monte Carlo Simulation in Valuation of Investment Projects
inferred← citeshttps://doi.org/10.28991/cej-2016-00000063openalex-snapshot
Reviewing of the Simulation Models in Cost Management of the Construction Projects
inferred← citeshttps://doi.org/10.29130/dubited.1061297openalex-snapshot
İnşaat Maliyet Risklerinin Simülasyon Yöntemi ile Analizi
inferred← citeshttps://doi.org/10.29244/jam.10.1.93-110openalex-snapshot
Analisis Return, Risk dan VaR Portofolio Saham JII dengan Metode SIM, MAD dan DD
inferred← citeshttps://doi.org/10.30564/jaeser.v4i3.3383openalex-snapshot
Assessing the Impact of the Lead/Lag Times on the Project Duration Estimates in Highway Construction
inferred← citeshttps://doi.org/10.31258/jamt.3.1.22-29openalex-snapshot
Simulations of the Crude Oil Tank Refurbishment Project Risks Using Monte Carlo
inferred← citeshttps://doi.org/10.31414/adm.2023.d.131628openalex-snapshot
Análise de riscos em projetos complexos associados ao prazo
inferred← citeshttps://doi.org/10.31428/10317/12807openalex-snapshot
Statiscal and optimization tolos for the efficient mangement of port terminals. Application to the port of Cartagena
inferred← citeshttps://doi.org/10.31586/wjcea.2022.512openalex-snapshot
A Framework for the Application of Optimization Techniques in the Achievement of Global Emission Targets in the Housing Sector
inferred← citeshttps://doi.org/10.32709/akusosbil.1054686openalex-snapshot
Stratejik Yönetim Araçlarına Dayalı Kurumsal Risk Yönetimi: Bir Model ve Uygulama Önerisi
inferred← citeshttps://doi.org/10.32734/ee.v2i3.782openalex-snapshot
Optimasi Waktu Pengerjaan Proyek Menggunakan Simulasi Monte Carlo Pada Proyek Konstruksi Hotel Y Oleh PT X
inferred← citeshttps://doi.org/10.32782/2524-0072/2025-75-87openalex-snapshot
СИНЕРГЕТИЧНИЙ ПІДХІД ДО ЗАСТОСУВАННЯ МЕТОДІВ МОНТЕ-КАРЛО ТА БЕНЧМАРКІНГУ В УПРАВЛІННІ ІНФРАСТРУКТУРНИМИ ПРОЄКТАМИ В УМОВАХ ВІДНОВЛЕННЯ
inferred← citeshttps://doi.org/10.3311/ppci.18877openalex-snapshot
Study on Construction Resource Optimization and Uncertain Risk of Urban Sewage Pipe Network
inferred← citeshttps://doi.org/10.33141/po.2024.01.07openalex-snapshot
VaR and VaO in project management: A new approach
inferred← citeshttps://doi.org/10.33197/jitter.vol6.iss3.2020.398openalex-snapshot
ANALISA PERBANDINGAN PERAMALAN DATA PENUMPANG PT KAI ANTARA METODE SIMULASI MONTE CARLO DAN DOUBLE MOVING AVERAGE
inferred← citeshttps://doi.org/10.33423/jaf.v19i5.2248openalex-snapshot
Using Monte Carlo Simulation for Pro Forma Financial Statements
inferred← citeshttps://doi.org/10.33564/ijeast.2021.v06i01.009openalex-snapshot
RISK ASSESSMENT FOR HAZARDOUS SUBSTANCES STORAGE
inferred← citeshttps://doi.org/10.3390/a13120325openalex-snapshot
Fuzzy-Based Multivariate Analysis for Input Modeling of Risk Assessment in Wind Farm Projects
inferred← citeshttps://doi.org/10.3390/app12010008openalex-snapshot
Life-Cycle Oriented Risk Assessment Using a Monte Carlo Simulation
inferred← citeshttps://doi.org/10.3390/buildings16051017openalex-snapshot
A Data-Driven Optimization Framework for Project Quality Management in Construction
inferred← citeshttps://doi.org/10.3390/land11122287openalex-snapshot
Challenges in the Geo-Processing of Big Soil Spatial Data
inferred← citeshttps://doi.org/10.3390/nano12050831openalex-snapshot
Recent Advances in Theoretical Development of Thermal Atomic Layer Deposition: A Review
inferred← citeshttps://doi.org/10.3390/su11215971openalex-snapshot
What Enables a High-Risk Project to Yield High Return from a Construction Contractor’s Perspective?
inferred← citeshttps://doi.org/10.3390/su14010147openalex-snapshot
Ex-Ante Study of Biofuel Policies–Analyzing Policy-Induced Flexibility
inferred← citeshttps://doi.org/10.3390/systems14091168openalex-snapshot
Supporting Organizational Resilience Under Systemic Disruptions: A Process-Role Model for Technologically Complex Projects
inferred← citeshttps://doi.org/10.34626/jsx4-qk58openalex-snapshot
Uma abordagem aos projetos complexos na perspetiva da prevenção
inferred← citeshttps://doi.org/10.35297/qjae.010153openalex-snapshot
An Austrian View on Risk and Its Quantification: A Reply to Hering, Olbrich, and Rapp
inferred← citeshttps://doi.org/10.35760/eb.2026.v31i2.906openalex-snapshot
ENHANCING REAL ESTATE FEASIBILITY STUDIES WITH MULTI-CRITERIA AND RISK ANALYSIS TOOLS
inferred← citeshttps://doi.org/10.37610/dyo.v0i82.662openalex-snapshot
Análisis cuantitativo de riesgos utilizando "MCSimulRisk" como herramienta didáctica
inferred← citeshttps://doi.org/10.3846/ijspm.2018.6049openalex-snapshot
EARLY TERMINATION COMPENSATION UNDER DEMAND UNCERTAINTY IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS
inferred← citeshttps://doi.org/10.4018/978-1-5225-0335-4.ch008openalex-snapshot
On Using Monte Carlo Simulations for Project Risk Management
inferred← citeshttps://doi.org/10.4018/978-1-5225-9265-5.ch013openalex-snapshot
The Use of Quantitative Methods in Investment Decisions
inferred← citeshttps://doi.org/10.4018/978-1-7998-8049-3.ch001openalex-snapshot
The Use of Quantitative Methods in Investment Decisions
inferred← citeshttps://doi.org/10.4043/28073-msopenalex-snapshot
Evaluation of the Discrete Latin Hypercube with Geostatistical Realizations Sampling for History Matching Under Uncertainties for the Norne Benchmark Case
inferred← citeshttps://doi.org/10.4236/ti.2011.22011openalex-snapshot
Assessing Uncertainty and Risk in Public Sector Investment Projects
inferred← citeshttps://doi.org/10.47191/ijmcr/v10i7.01openalex-snapshot
Prediction of Telecommunication Service Providers' Stock Prices in Indonesia to Support The Digital Economy
inferred← citeshttps://doi.org/10.48780/publications.aston.ac.uk.00033316openalex-snapshot
Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects
inferred← citeshttps://doi.org/10.5130/ajceb.v18i2.5842openalex-snapshot
A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks
inferred← citeshttps://doi.org/10.5130/pppm.v1i1.1573openalex-snapshot
Risk management reconceived: reconciling economic rationality with behavioural tendencies
inferred← citeshttps://doi.org/10.52547/ifej.8.15.128openalex-snapshot
Time and Cost Simulation of Forest Roads Construction Using Monte Carlo analysis
inferred← citeshttps://doi.org/10.5267/j.msl.2014.1.023openalex-snapshot
A Monte Carlo simulation technique to determine the optimal portfolio
inferred← citeshttps://doi.org/10.54097/3dg18k50openalex-snapshot
Analysis of the Principle and Two Applications for Monte-Carlo Simulations
inferred← citeshttps://doi.org/10.5430/afr.v4n2p99openalex-snapshot
A Probabilistic Capital Budgeting Model for New Product Development under Stage-Gate Process
inferred← citeshttps://doi.org/10.55905/oelv22n1-074openalex-snapshot
Análise de riscos em projetos complexos associados ao prazo
inferred← citeshttps://doi.org/10.5935/978-85-93729-51-5.2018b001openalex-snapshot
Gestão da produção em foco: volume 9
inferred← citeshttps://doi.org/10.7166/28-2-1604openalex-snapshot
USING MONTE CARLO SIMULATION TO CREATE A RANKED CHECK LIST OF RISKS IN A PORTFOLIO OF RAILWAY CONSTRUCTION PROJECTS
inferred← citeshttps://doi.org/10.7166/33-3-2794openalex-snapshot
EVALUATION OF BUDGETING METHODS FOR MAINTENANCE OF HERITAGE BUILDINGS
inferred← citeshttps://doi.org/10.7595/management.fon.2018.0004openalex-snapshot
Examining the Value of Monte Carlo Simulation for Project Time Management
inferred← citeshttps://doi.org/10.7939/r3-5348-4y72openalex-snapshot
Decision-Support System for Construction Risk Management in Onshore Wind Projects
inferred← citeshttps://doi.org/10.7939/r39c6sb73openalex-snapshot
Understanding and Improving Input for Quantitative Risk Analysis in the Construction Industry
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.