On the public citation graph
Generation Scheduling of a Hydrothermal System Considering Multiple Provincial Peak-Shaving Demands
0 signed · 59 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1002/er.4013openalex-snapshot
Wind power and photovoltaic power: How to improve the accommodation capability of renewable electricity generation in China?
inferredcites →https://doi.org/10.1007/s10107-004-0518-7openalex-snapshot
Exploring relaxation induced neighborhoods to improve MIP solutions
inferredcites →https://doi.org/10.1007/s13369-017-2991-3openalex-snapshot
Economic Dispatch Model Based on Time-of-Use Electricity Price for Photovoltaic Systems
inferredcites →https://doi.org/10.1016/j.apenergy.2012.12.001openalex-snapshot
Peak and off-peak operations of the air separation unit in oxy-coal combustion power generation systems
inferredcites →https://doi.org/10.1016/j.apenergy.2018.01.025openalex-snapshot
Roles of wind and solar energy in China’s power sector: Implications of intermittency constraints
inferredcites →https://doi.org/10.1016/j.atmosenv.2018.10.008openalex-snapshot
Atmospheric emission inventory of SO3 from coal-fired power plants in China in the period 2009–2014
inferredcites →https://doi.org/10.1016/j.enconman.2015.02.055openalex-snapshot
Optimal operation rules of Three-gorge and Gezhouba cascade hydropower stations in flood season
inferredcites →https://doi.org/10.1016/j.enconman.2015.03.009openalex-snapshot
An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost
inferredcites →https://doi.org/10.1016/j.enconman.2018.01.064openalex-snapshot
Carbon emission reduction and reliable power supply equilibrium based daily scheduling towards hydro-thermal-wind generation system: A perspective from China
inferredcites →https://doi.org/10.1016/j.energy.2014.07.015openalex-snapshot
Optimization of peak loads among multiple provincial power grids under a central dispatching authority
inferredcites →https://doi.org/10.1016/j.energy.2015.12.011openalex-snapshot
Coordinated operations of large-scale UHVDC hydropower and conventional hydro energies about regional power grid
inferredcites →https://doi.org/10.1016/j.energy.2017.06.097openalex-snapshot
Peak shaving operation of hydro-thermal-nuclear plants serving multiple power grids by linear programming
inferredcites →https://doi.org/10.1016/j.energy.2018.08.077openalex-snapshot
An MILP-based model for short-term peak shaving operation of pumped-storage hydropower plants serving multiple power grids
inferredcites →https://doi.org/10.1016/j.ijepes.2014.11.025openalex-snapshot
An improved priority list and neighborhood search method for unit commitment
inferredcites →https://doi.org/10.1016/j.ijepes.2014.12.004openalex-snapshot
A multi-objective short term hydropower scheduling model for peak shaving
inferredcites →https://doi.org/10.1016/j.ijepes.2014.12.043openalex-snapshot
Short-term peak shaving operation for multiple power grids with pumped storage power plants
inferredcites →https://doi.org/10.1016/j.ijepes.2017.07.015openalex-snapshot
Peak operation of hydropower system with parallel technique and progressive optimality algorithm
inferredcites →https://doi.org/10.1016/j.resconrec.2018.05.019openalex-snapshot
Coal power overcapacity in China: Province-Level estimates and policy implications
inferredcites →https://doi.org/10.1016/j.scs.2018.05.049openalex-snapshot
An optimal energy management system for a commercial building with renewable energy generation under real-time electricity prices
inferredcites →https://doi.org/10.1061/(asce)wr.1943-5452.0000622openalex-snapshot
Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints
inferredcites →https://doi.org/10.1061/9780784412947.217openalex-snapshot
Some Practical Strategies and Methods for Large-Scale Hydropower System Operations in China
inferredcites →https://doi.org/10.1080/00207543.2015.1058981openalex-snapshot
Operations scheduling under electricity time-varying prices
inferredcites →https://doi.org/10.1109/access.2018.2870736openalex-snapshot
Risk–Based Admissibility Analysis of Wind Power Integration into Power System With Energy Storage System
inferredcites →https://doi.org/10.1109/access.2018.2884539openalex-snapshot
Research of Wind Power Correlation With Three Different Data Types Based on Mixed Copula
inferredcites →https://doi.org/10.1109/proc.1966.4634openalex-snapshot
Statistics of atomic frequency standards
inferredcites →https://doi.org/10.1109/tpwrs.2018.2870041openalex-snapshot
Deep Learning-Based Multivariate Probabilistic Forecasting for Short-Term Scheduling in Power Markets
inferredcites →https://doi.org/10.1111/j.1752-1688.2011.00628.xopenalex-snapshot
Short‐Term Hydroscheduling with Discrepant Objectives Using Multi‐Step Progressive Optimality Algorithm1
inferredcites →https://doi.org/10.12691/ajeee-5-1-3openalex-snapshot
Scheduling a Wind Hydro-Pumped-Storage Unit Considering the Economical Optimization
inferredcites →https://doi.org/10.18178/ijoee.3.3.145-150openalex-snapshot
Quarter-Hourly Generation Scheduling of Hydropower Systems Considering Peak Saving Demands among Multiple Provincial Power Grids in Central China
inferredcites →https://doi.org/10.3390/electronics8010048openalex-snapshot
Enhanced Time-of-Use Electricity Price Rate Using Game Theory
inferredcites →https://doi.org/10.3390/en12010144openalex-snapshot
Optimal Operation of Interprovincial Hydropower System Including Xiluodu and Local Plants in Multiple Recipient Regions
inferredcites →https://doi.org/10.3390/en81011295openalex-snapshot
Peak Operation of Cascaded Hydropower Plants Serving Multiple Provinces
What points at this work
Incoming claims: where this work appears in other papers’ reference lists and arguments.
inferred← citeshttps://doi.org/10.2139/ssrn.4827680openalex-extracted
Demand Response with Load-Block Shifting in the Day Ahead Scheduling of Predominantly Hydro Systems: Impact on the Large-Scale Brazilian Case
inferred← citeshttps://doi.org/10.2139/ssrn.5017840openalex-extracted
Demand Response with Load-Block Shifting in the Day Ahead Scheduling of Predominantly Hydro Systems: Impact on the Large-Scale Brazilian Case
inferred← citeshttps://doi.org/10.1016/j.apenergy.2024.122762openalex-snapshot
Developing operating rules for a hydro–wind–solar hybrid system considering peak-shaving demands
inferred← citeshttps://doi.org/10.1016/j.gloei.2019.11.007openalex-snapshot
Trans-regional transmission of large-scale hydropower: problems and solutions in receiving power grid
inferred← citeshttps://doi.org/10.1016/j.renene.2024.121341openalex-snapshot
MILP model for short-term peak shaving of multi-grids using cascade hydropower considering discrete HVDC constraints
inferred← citeshttps://doi.org/10.1016/j.rser.2019.109617openalex-snapshot
Multiobjective optimal operations for an interprovincial hydropower system considering peak-shaving demands
inferred← citeshttps://doi.org/10.1016/j.segan.2025.101728openalex-snapshot
Demand response with load-block shifting in the day ahead scheduling of predominantly hydro systems: Impact on the large-scale Brazilian case
inferred← citeshttps://doi.org/10.1049/esi2.12084openalex-snapshot
Comprehensive configuration strategy of energy storage allocation and line upgrading for distribution networks considering a high proportion of integrated photovoltaics
inferred← citeshttps://doi.org/10.1049/iet-rpg.2019.0469openalex-snapshot
Overview of China's hydropower absorption: evolution, problems, and suggested solutions
inferred← citeshttps://doi.org/10.1049/rpg2.12098openalex-snapshot
An efficient and accurate Mixed‐integer linear programming model for long‐term operations of large‐scale hydropower systems
inferred← citeshttps://doi.org/10.1109/access.2019.2943573openalex-snapshot
Optimization Model for the Short-Term Operation of Hydropower Plants Transmitting Power to Multiple Power Grids via HVDC Transmission Lines
inferred← citeshttps://doi.org/10.1109/access.2020.2979050openalex-snapshot
Peak Shaving Model for Coordinated Hydro-Wind-Solar System Serving Local and Multiple Receiving Power Grids via HVDC Transmission Lines
inferred← citeshttps://doi.org/10.1109/access.2020.2983183openalex-snapshot
Unit Commitment Comprehensive Optimal Model Considering the Cost of Wind Power Curtailment and Deep Peak Regulation of Thermal Unit
inferred← citeshttps://doi.org/10.1109/access.2020.3035067openalex-snapshot
Multi-Area Automatic Generation Control Scheme Considering Frequency Quality in Southwest China Grid: Challenges and Solutions
inferred← citeshttps://doi.org/10.1109/access.2021.3049280openalex-snapshot
A Short-Term Optimal Scheduling Model for Wind-Solar-Hydro Hybrid Generation System With Cascade Hydropower Considering Regulation Reserve and Spinning Reserve Requirements
inferred← citeshttps://doi.org/10.1109/eem.2019.8916500openalex-snapshot
Multi-objective Optimization Model for Cascaded Operation under Multivariate Electricity Market of South-western China
inferred← citeshttps://doi.org/10.1109/icpst61417.2024.10601934openalex-snapshot
Coordinated Dispatch for Power Grid and Pumped Storage Hydropower Plants with Embedded Market Game Model
inferred← citeshttps://doi.org/10.1109/ieecon51072.2021.9440244openalex-snapshot
A Novel Trade-off Management for Energy Storage System in Microgrid System
inferred← citeshttps://doi.org/10.1109/pandafpe57779.2023.10140868openalex-snapshot
Optimizing Method for the Scheduling of Cascade Hydro-Electric Power Energy Storage System for Peak Regulation across Multiple Regional Grids
inferred← citeshttps://doi.org/10.23919/pcmp.2023.000048openalex-snapshot
Auxiliary Service Dynamic Compensation Mechanism Design for Incentivizing Market Participants to Provide Flexibility in China
inferred← citeshttps://doi.org/10.3389/fenrg.2025.1746997openalex-snapshot
Multi-objective partitioning and cooperative peak shaving for distributed photovoltaic clusters via multi-agent reinforcement learning
inferred← citeshttps://doi.org/10.3390/en14020298openalex-snapshot
Generation of Hydro Energy by Using Data Mining Algorithm for Cascaded Hydropower Plant
inferred← citeshttps://doi.org/10.3390/en15113928openalex-snapshot
Assessment of the Modeling of Demand Response as a Dispatchable Resource in Day-Ahead Hydrothermal Unit Commitment Problems: The Brazilian Case
inferred← citeshttps://doi.org/10.3390/pr12071374openalex-snapshot
The Evolving Technological Framework and Emerging Trends in Electrical Intelligence within Nuclear Power Facilities
inferred← citeshttps://doi.org/10.3390/su13095022openalex-snapshot
Optimal Operation of a Hybrid Power System as an Island Microgrid in South-Korea
inferred← citeshttps://doi.org/10.3390/w11071392openalex-snapshot
Modeling and Solution Techniques Used for Hydro Generation Scheduling
inferred← citeshttps://doi.org/10.3390/w18202541openalex-snapshot
Short-Term Peak-Shaving Dispatch for Cascade Hydropower Based on Load Curve Reconstruction
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.