Developing a New Structure for Determining Time Risk Priority using Risk Breakdown matrix in EPC Projects

https://doi.org/10.1109/ieem.2007.4419342
0 signed · 16 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1016/s0263-7863(99)00073-3openalex-snapshot
Risk management of international projects in Russia
inferredcites →https://doi.org/10.1057/palgrave.rm.8250004openalex-snapshot
Managing Project Risks Using a Cross Risk Breakdown Matrix
inferredcites →https://doi.org/10.1108/14725960410808131openalex-snapshot
Using a Risk Breakdown Structure in project management

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.3105982openalex-extracted
Issues in Risk Management: The Perspectives of Managers in Nigeriaas Oil and Gas Industry
inferred← citeshttps://doi.org/10.1007/978-981-19-5727-7_21openalex-snapshot
Risk Evaluation of Construction Phase of EPC Residential Projects Based on Fuzzy Analytic Hierarchy Process
inferred← citeshttps://doi.org/10.1007/978-981-99-8842-6_23openalex-snapshot
Managing Risks Related to the Adoption of New Technologies by Various Stakeholders in Indian Construction Sector
inferred← citeshttps://doi.org/10.1038/s41598-024-64276-1openalex-snapshot
Development a risk assessment method for dimensional stone quarries
inferred← citeshttps://doi.org/10.1061/(asce)me.1943-5479.0000339openalex-snapshot
Protocol to Enhance Profitability by Managing Risks in Construction Projects
inferred← citeshttps://doi.org/10.1061/9780784479827.276openalex-snapshot
Defining Mitigation Strategies for Recurring EPC Contract Risks
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-12783openalex-snapshot
Risk Breakdown Matrix for Risk-Based Inspection of Transportation Infrastructure Projects
inferred← citeshttps://doi.org/10.1109/icee.2010.1294openalex-snapshot
Notice of Retraction: Empirical Study on the Performance of EPC Contractor Management Module: A Chinese Case
inferred← citeshttps://doi.org/10.1109/sose49046.2020.00009openalex-snapshot
Risk Breakdown Structure and Security Space for Security Management
inferred← citeshttps://doi.org/10.17794/rgn.2020.1.8openalex-snapshot
INVESTIGATING A COMPREHENSIVE MODEL FOR EVALUATING OCCUPATIONAL AND ENVIRONMENTAL RISKS OF DIMENSIONAL STONE MINING
inferred← citeshttps://doi.org/10.4018/ijisscm.2018040104openalex-snapshot
Risk Evaluation of EPC Supply Chain Based on SCOR and Multi-Level Grey Model
inferred← citeshttps://doi.org/10.4102/sajbm.v41i3.521openalex-snapshot
Project portfolio management implementation pitfalls
inferred← citeshttps://doi.org/10.5772/21362openalex-snapshot
A New Non-Parametric Statistical Approach to Assess Risks Associated with Climate Change in Construction Projects Based on LOOCV Technique
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.