On the public citation graph
Managing a Portfolio of Product Development Projects under Resource Constraints
0 signed · 120 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1002/1520-6750(200102)48:1<18::aid-nav2>3.0.co;2-7openalex-snapshot
Balancing and optimizing a portfolio of R&D projects
inferredcites →https://doi.org/10.1002/ecj.10101openalex-snapshot
Solving resource constrained multiple project scheduling problems by random key‐based genetic algorithm
inferredcites →https://doi.org/10.1002/pmj.20033openalex-snapshot
Project Management Practice, Generic or Contextual: A Reality Check
inferredcites →https://doi.org/10.1002/sres.809openalex-snapshot
Effects of resource allocation policies for reducing project durations: a systems modelling approach
inferredcites →https://doi.org/10.1007/978-1-4615-5533-9_7openalex-snapshot
Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis
inferredcites →https://doi.org/10.1007/s10479-006-0158-9openalex-snapshot
A market-based multi-agent system model for decentralized multi-project scheduling
inferredcites →https://doi.org/10.1007/s10845-013-0767-5openalex-snapshot
Learning process on priority rules to solve the RCMPSP
inferredcites →https://doi.org/10.1007/s10951-009-0131-yopenalex-snapshot
A random generator of resource-constrained multi-project network problems
inferredcites →https://doi.org/10.1016/0272-6963(95)00032-1openalex-snapshot
Efficient priority rules for the resource‐constrained project scheduling problem
inferredcites →https://doi.org/10.1016/0377-2217(90)90116-sopenalex-snapshot
Some efficient multi-heuristic procedures for resource-constrained project scheduling
inferredcites →https://doi.org/10.1016/0377-2217(95)00357-6openalex-snapshot
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
inferredcites →https://doi.org/10.1016/j.cor.2005.05.033openalex-snapshot
A heuristic genetic algorithm for product portfolio planning
inferredcites →https://doi.org/10.1016/j.ejor.2003.06.021openalex-snapshot
Product development resource allocation with foresight
inferredcites →https://doi.org/10.1016/j.ejor.2005.01.065openalex-snapshot
Experimental investigation of heuristics for resource-constrained project scheduling: An update
inferredcites →https://doi.org/10.1016/j.ejor.2006.06.074openalex-snapshot
A genetic algorithm for the resource constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2009.11.005openalex-snapshot
A survey of variants and extensions of the resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2010.01.041openalex-snapshot
Multi-objective decision analysis for competence-oriented project portfolio selection
inferredcites →https://doi.org/10.1016/j.ijpe.2010.03.009openalex-snapshot
Resource-constrained multi-project scheduling: Priority rule performance revisited
inferredcites →https://doi.org/10.1016/j.ijproman.2007.06.004openalex-snapshot
Project portfolio management – There’s more to it than what management enacts
inferredcites →https://doi.org/10.1016/j.jom.2004.12.001openalex-snapshot
Impact of role in the decision to fail: An exploratory study of terminated projects
inferredcites →https://doi.org/10.1016/s0263-7863(01)00022-9openalex-snapshot
A comparative morphologic analysis of benchmark sets of project networks
inferredcites →https://doi.org/10.1016/s0263-7863(01)00028-xopenalex-snapshot
Effective Project Management
inferredcites →https://doi.org/10.1016/s0263-7863(02)00113-8openalex-snapshot
The resource allocation syndrome: the prime challenge of multi-project management?
inferredcites →https://doi.org/10.1016/s0263-7863(98)00026-xopenalex-snapshot
Human resource allocation in a multi-project R&D environment
inferredcites →https://doi.org/10.1016/s0377-2217(98)00027-7openalex-snapshot
Scheduling of design projects with uncertain number of iterations
inferredcites →https://doi.org/10.1016/s0377-2217(99)00485-3openalex-snapshot
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/s0737-6782(99)00031-4openalex-snapshot
The Effect of “Front‐Loading” Problem‐Solving on Product Development Performance
inferredcites →https://doi.org/10.1023/a:1010966401888openalex-snapshot
Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling
inferredcites →https://doi.org/10.1057/jors.1989.196openalex-snapshot
Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2006)132:6(554)openalex-snapshot
Developing a Complexity Measure for Project Schedules
inferredcites →https://doi.org/10.1080/00345334.1985.11756910openalex-snapshot
Innovation Is Not a Linear Process
inferredcites →https://doi.org/10.1080/01446198800000010openalex-snapshot
Multi-project scheduling: a new categorization for heuristic scheduling rules in construction scheduling problems
inferredcites →https://doi.org/10.1080/05695557508974995openalex-snapshot
Project Network Summary Measures Constrained- Resource Scheduling
inferredcites →https://doi.org/10.1080/07408170601180510openalex-snapshot
Projects with sequential iteration: Models and complexity
inferredcites →https://doi.org/10.1080/08956308.2008.11657523openalex-snapshot
Managing The Opportunity Portfolio
inferredcites →https://doi.org/10.1109/17.969428openalex-snapshot
Technology portfolio management: optimizing interdependent projects over multiple time periods
inferredcites →https://doi.org/10.1109/cis.2007.157openalex-snapshot
A Particle Swarm Optimization for Resource-Constrained Multi-Project Scheduling Problem
inferredcites →https://doi.org/10.1109/cis.2007.58openalex-snapshot
Handling Information Release and Erasure in Multi-Threaded Programs
inferredcites →https://doi.org/10.1109/tem.2002.806709openalex-snapshot
Modeling impacts of process architecture on cost and schedule risk in product development
inferredcites →https://doi.org/10.1109/tem.2005.850722openalex-snapshot
A Simulation-Based Process Model for Managing Complex Design Projects
inferredcites →https://doi.org/10.1109/tem.2009.2033144openalex-snapshot
An Adaptive Process Model to Support Product Development Project Management
inferredcites →https://doi.org/10.1111/j.1475-3995.2007.00614.xopenalex-snapshot
A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem
inferredcites →https://doi.org/10.1111/j.1937-5956.2003.tb00213.xopenalex-snapshot
OPTIMAL PROJECT SEQUENCING WITH RECOURSE AT A SCARCE RESOURCE
inferredcites →https://doi.org/10.1111/j.1937-5956.2005.tb00028.xopenalex-snapshot
Rush and Be Wrong or Wait and Be Late? A Model of Information in Collaborative Processes
inferredcites →https://doi.org/10.1111/j.1937-5956.2005.tb00029.xopenalex-snapshot
A Hierarchical Product Development Planning Framework
inferredcites →https://doi.org/10.1111/j.1937-5956.2005.tb00230.xopenalex-snapshot
Project Scheduling—Theory and Practice
inferredcites →https://doi.org/10.1111/j.1937-5956.2007.tb00174.xopenalex-snapshot
A Resource‐Process Framework of New Service Development
inferredcites →https://doi.org/10.1111/j.1937-5956.2007.tb00177.xopenalex-snapshot
A Survey of Activity Network‐Based Process Models for Managing Product Development Projects
inferredcites →https://doi.org/10.1115/detc2004-57159openalex-snapshot
Task Scheduling of Parallel Development Projects Using Genetic Algorithms
inferredcites →https://doi.org/10.1177/1063293x02010002053openalex-snapshot
A Quantitative Approach to the Process Modeling and Planning in Concurrent Engineering
inferredcites →https://doi.org/10.1177/875697280403500206openalex-snapshot
Multi-Project Scheduling and Control: A Process-Based Comparative Study of the Critical Chain Methodology and Some Alternatives
inferredcites →https://doi.org/10.1201/9781420046823-25openalex-snapshot
Project Portfolio Management
inferredcites →https://doi.org/10.1287/mnsc.1040.0204openalex-snapshot
50th Anniversary Article: Technological Innovation, Product Development, and Entrepreneurship in Management Science
inferredcites →https://doi.org/10.1287/mnsc.1060.0617openalex-snapshot
The Statistical Mechanics of Complex Product Development: Empirical and Analytical Results
inferredcites →https://doi.org/10.1287/mnsc.16.1.93openalex-snapshot
Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach
inferredcites →https://doi.org/10.1287/mnsc.21.8.944openalex-snapshot
A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
inferredcites →https://doi.org/10.1287/mnsc.22.11.1186openalex-snapshot
Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
inferredcites →https://doi.org/10.1287/mnsc.28.2.161openalex-snapshot
Multi-Project Scheduling: Categorization of Heuristic Rules Performance
inferredcites →https://doi.org/10.1287/mnsc.29.8.962openalex-snapshot
The Practice of Management Science in R&D Project Management
inferredcites →https://doi.org/10.1287/mnsc.43.3.276openalex-snapshot
Identifying Controlling Features of Engineering Design Iteration
inferredcites →https://doi.org/10.1287/mnsc.43.8.1104openalex-snapshot
A Predictive Model of Sequential Iteration in Engineering Design
inferredcites →https://doi.org/10.1287/mnsc.44.6.743openalex-snapshot
Managing Experimentation in the Design of New Products
inferredcites →https://doi.org/10.1287/mnsc.48.10.1227.275openalex-snapshot
Dynamic Portfolio Selection of NPD Programs Using Marginal Returns
inferredcites →https://doi.org/10.1287/mnsc.48.8.1008.163openalex-snapshot
On Uncertainty, Ambiguity, and Complexity in Project Management
inferredcites →https://doi.org/10.1287/msom.2013.0432openalex-snapshot
Linking Cyclicality and Product Quality
inferredcites →https://doi.org/10.1287/opre.26.1.22openalex-snapshot
Complexity of Scheduling under Precedence Constraints
inferredcites →https://doi.org/10.5860/choice.34-1636openalex-snapshot
A Guide to the project management body of knowledge
inferredcites →https://doi.org/10.7551/mitpress/8896.001.0001openalex-snapshot
Design Structure Matrix Methods and Applications
What points at this work
Incoming claims: where this work appears in other papers’ reference lists and arguments.
inferred← citeshttps://doi.org/10.1002/joom.1266openalex-snapshot
Editorial: Toyota Production System practices as Fast‐and‐Frugal heuristics
inferred← citeshttps://doi.org/10.1002/joom.1270openalex-snapshot
Vulnerability diffusions in software product networks
inferred← citeshttps://doi.org/10.1007/978-3-031-17288-5_30openalex-snapshot
Innovation Portfolio Management: How Can TRIZ Help?
inferred← citeshttps://doi.org/10.1007/978-3-031-38168-3_10openalex-snapshot
Computable and Mathematical Models for General Insight into Design and Development
inferred← citeshttps://doi.org/10.1007/978-3-031-83083-9_10openalex-snapshot
Berechenbare und mathematische Modelle für allgemeine Einblicke in Design und Entwicklung
inferred← citeshttps://doi.org/10.1007/978-3-319-57870-5_6openalex-snapshot
Project Portfolio Selection for the Digital Transformation Era
inferred← citeshttps://doi.org/10.1007/978-3-319-89920-6_74openalex-snapshot
A CTMDP-Based Exact Method for RCPSP with Uncertain Activity Durations and Rework
inferred← citeshttps://doi.org/10.1007/s00163-016-0222-7openalex-snapshot
Optimizing time–cost trade-offs in product development projects with a multi-objective evolutionary algorithm
inferred← citeshttps://doi.org/10.1007/s10479-024-05841-9openalex-snapshot
The performance of priority rules for the dynamic stochastic resource-constrained multi-project scheduling problem: an experimental investigation
inferred← citeshttps://doi.org/10.1007/s10479-026-07152-7openalex-snapshot
Efficient priority rules for the resource-constrained multi-project scheduling problem under dynamic and uncertain environments
inferred← citeshttps://doi.org/10.1007/s11047-018-9722-xopenalex-snapshot
Joint optimization of the high-end equipment development task process and resource allocation
inferred← citeshttps://doi.org/10.1007/s11573-020-00993-zopenalex-snapshot
Simultaneous structuring and scheduling of multiple projects with flexible project structures
inferred← citeshttps://doi.org/10.1016/j.cie.2017.03.001openalex-snapshot
Scheduling multiple, resource-constrained, iterative, product development projects with genetic algorithms
inferred← citeshttps://doi.org/10.1016/j.cie.2017.10.021openalex-snapshot
On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem
inferred← citeshttps://doi.org/10.1016/j.cie.2018.04.002openalex-snapshot
Product development network modelling extensions to the cycle elimination method
inferred← citeshttps://doi.org/10.1016/j.cie.2020.106505openalex-snapshot
Meta-heuristics for unrelated parallel machines scheduling with random rework to minimize expected total weighted tardiness
inferred← citeshttps://doi.org/10.1016/j.cor.2024.106968openalex-snapshot
Unrelated parallel machine scheduling with random rework and limited preemption
inferred← citeshttps://doi.org/10.1016/j.cor.2026.107599openalex-snapshot
Breaking hierarchical silos in multi-project dedicated staffing: A nested optimization approach
inferred← citeshttps://doi.org/10.1016/j.ejor.2025.06.007openalex-snapshot
Project monitoring and control with an empirically grounded budget-release model
inferred← citeshttps://doi.org/10.1016/j.indmarman.2019.04.013openalex-snapshot
Reinventing a business model in industrial networks: Implications for customers' brand perceptions
inferred← citeshttps://doi.org/10.1016/j.jclepro.2018.03.005openalex-snapshot
Framework proposal for ecodesign integration on product portfolio management
inferred← citeshttps://doi.org/10.1016/j.knosys.2024.112530openalex-snapshot
The performance of priority rules for the decentralized resource-constrained multi-project scheduling
inferred← citeshttps://doi.org/10.1016/j.procir.2023.03.138openalex-snapshot
Multi-Disciplinary Product Design and Modularization – Concept Introduction of the Module Harmonization Chart (MHC)
inferred← citeshttps://doi.org/10.1061/(asce)me.1943-5479.0001092openalex-snapshot
A Review of the Use of Game Theory in Project Management
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-15342openalex-snapshot
Heuristic Methods for Dynamic Multiproject Scheduling Problems with Stochastic Transfer Times
inferred← citeshttps://doi.org/10.1080/00207543.2025.2511233openalex-snapshot
An efficient rollout algorithm for unrelated parallel machine scheduling with random rework
inferred← citeshttps://doi.org/10.1080/00207543.2025.2596241openalex-snapshot
Integrated capacity planning and multi-project scheduling considering resource transfer and idleness
inferred← citeshttps://doi.org/10.1080/01605682.2025.2463556openalex-snapshot
A two-stage adjustable robust optimization approach for multi-work package project scheduling problem under uncertain environments
inferred← citeshttps://doi.org/10.1108/bpmj-05-2016-0095openalex-snapshot
Exploring the intersection of business process improvement and BPM capability development
inferred← citeshttps://doi.org/10.1108/jeim-02-2022-0056openalex-snapshot
Evaluation of an artificial intelligence project in the software industry based on fuzzy analytic hierarchy process and complex adaptive systems
inferred← citeshttps://doi.org/10.1109/emr.2018.2870401openalex-snapshot
Managing the Development of Complex Product Systems—What Managers Can Learn From the Research
inferred← citeshttps://doi.org/10.1109/tem.2015.2491283openalex-snapshot
Design Structure Matrix Extensions and Innovations: A Survey and New Opportunities
inferred← citeshttps://doi.org/10.1109/tem.2019.2920331openalex-snapshot
Proposal and Solution of a Mixed-Integer Nonlinear Optimization Model That Incorporates Future Preparedness for Project Portfolio Selection
inferred← citeshttps://doi.org/10.1109/tem.2019.2929660openalex-snapshot
Managing the Development of Complex Product Systems: An Integrative Literature Review
inferred← citeshttps://doi.org/10.1109/tem.2020.3014403openalex-snapshot
Is New Always Better? How Business Model Innovation Affects Consumers’ Adoption Behavior
inferred← citeshttps://doi.org/10.1111/deci.12310openalex-snapshot
Human Behavior in Project Portfolio Selection: Insights from an Experimental Study
inferred← citeshttps://doi.org/10.1111/deci.12407openalex-snapshot
The Role of Domestic and Foreign Knowledge Inflows on the Relationship between R&D Portfolio Mix and Innovation Outcomes: An Empirical Study of Manufacturing Firms in an Emerging Economy*
inferred← citeshttps://doi.org/10.1111/deci.12507openalex-snapshot
A generalized decision support framework for large‐scale project portfolio decisions
inferred← citeshttps://doi.org/10.1111/poms.13716openalex-snapshot
Multidisciplinary R&D project success in small firms: The role of multiproject status and project management experience
inferred← citeshttps://doi.org/10.1177/1063293x20957994openalex-snapshot
Managing concurrent execution of multiple activities in product development process
inferred← citeshttps://doi.org/10.15302/j-fem-2018050openalex-snapshot
Engineering management for high-end equipment intelligent manufacturing
inferred← citeshttps://doi.org/10.2139/ssrn.5380774openalex-snapshot
Multi-Objective Portfolio of Portfolios Problems with Qualitative Performance Assessments
inferred← citeshttps://doi.org/10.24200/sci.2020.54657.3850openalex-snapshot
Fuzzy Mathematical Models for Maximizing Contractors’ and Clients’ Satisfaction by Considering Flexible Start Date of the Project
inferred← citeshttps://doi.org/10.3389/fpsyg.2021.681505openalex-snapshot
Does Co-worker Presenteeism Increase Innovative Behavior? Evidence From IT Professionals Under the 996 Work Regime in China
inferred← citeshttps://doi.org/10.3390/math13091395openalex-snapshot
Efficient Rollout Algorithms for Resource-Constrained Project Scheduling with a Flexible Project Structure and Uncertain Activity Durations
inferred← citeshttps://doi.org/10.3390/systems12110476openalex-snapshot
A Novel Solution Approach Based on Dominance Evaluation Measure for Project Scheduling in Multi-Project Environments
inferred← citeshttps://doi.org/10.35199/dsm2022.07openalex-snapshot
Assessing the Influence of Digital Innovations on the Organizational Design of Product Family Generations
inferred← citeshttps://doi.org/10.35199/dsm2023.01openalex-snapshot
Enhancing Collaborative Modular Product Development: Interface Allocation and Associated Responsibilities
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.