Analysing delay factors in construction projects using Z-number approach: insights from Pakistan

https://doi.org/10.1139/cjce-2022-0310
0 signed · 69 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/int.21521openalex-snapshot
On Z-valuations using Zadeh's Z-numbers
inferredcites →https://doi.org/10.1007/s10489-017-1001-5openalex-snapshot
Total utility of Z-number
inferredcites →https://doi.org/10.1007/s12205-008-0367-7openalex-snapshot
Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
inferredcites →https://doi.org/10.1007/s12205-013-0446-2openalex-snapshot
Importance and ranking evaluation of delay factors for development construction projects in Benin
inferredcites →https://doi.org/10.1007/s12205-018-0810-3openalex-snapshot
A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS Project™
inferredcites →https://doi.org/10.1016/j.aei.2022.101683openalex-snapshot
New customer-oriented design concept evaluation by using improved Z-number-based multi-criteria decision-making method
inferredcites →https://doi.org/10.1016/j.aej.2013.03.002openalex-snapshot
Ranking of delay factors in construction projects after Egyptian revolution
inferredcites →https://doi.org/10.1016/j.aej.2016.03.006openalex-snapshot
Exploring delay causes of road construction projects in Egypt
inferredcites →https://doi.org/10.1016/j.aej.2019.07.002openalex-snapshot
Causes of delay in Saudi public construction projects
inferredcites →https://doi.org/10.1016/j.amsu.2022.104667openalex-snapshot
Various health-related challenges amidst recent floods in Pakistan; strategies for future prevention and control
inferredcites →https://doi.org/10.1016/j.asej.2020.04.009openalex-snapshot
Impact of inflation rate on construction projects budget: A review
inferredcites →https://doi.org/10.1016/j.asej.2022.101815openalex-snapshot
Study the delays and conflicts for construction projects and their mutual relationship: A review
inferredcites →https://doi.org/10.1016/j.cie.2020.106529openalex-snapshot
Application of a fuzzy-logic based model for risk assessment in additive manufacturing R&D projects
inferredcites →https://doi.org/10.1016/j.heliyon.2021.e06826openalex-snapshot
Exploring the significant factors that influence delays in construction projects in Hargeisa
inferredcites →https://doi.org/10.1016/j.ijproman.2004.03.004openalex-snapshot
Large construction projects in developing countries: a case study from Vietnam
inferredcites →https://doi.org/10.1016/j.ijproman.2005.11.010openalex-snapshot
Causes of delay in large construction projects
inferredcites →https://doi.org/10.1016/j.ijproman.2006.11.007openalex-snapshot
Causes and effects of delays in Malaysian construction industry
inferredcites →https://doi.org/10.1016/j.ijproman.2007.05.002openalex-snapshot
Understanding time delay disputes in construction contracts
inferredcites →https://doi.org/10.1016/j.ijproman.2007.09.009openalex-snapshot
Delays in construction projects: The case of Jordan
inferredcites →https://doi.org/10.1016/j.ijproman.2011.10.004openalex-snapshot
Analysing factors affecting delays in Indian construction projects
inferredcites →https://doi.org/10.1016/j.jare.2012.11.005openalex-snapshot
Analyzing delay causes in Egyptian construction projects
inferredcites →https://doi.org/10.1016/j.jclepro.2020.122788openalex-snapshot
Occupational Health and Safety in green building construction projects: A holistic Z-numbers-based risk management framework
inferredcites →https://doi.org/10.1016/j.jengtecman.2020.101572openalex-snapshot
Adoption of enterprise social networking: Revisiting the IT innovation adoption model of Hameed et al
inferredcites →https://doi.org/10.1016/j.proeng.2014.07.022openalex-snapshot
Time Extension Factors in Construction Industry of Pakistan
inferredcites →https://doi.org/10.1016/j.resourpol.2022.102591openalex-snapshot
Improved Z-number based fuzzy fault tree approach to analyze health and safety risks in surface mines
inferredcites →https://doi.org/10.1016/s0263-7863(00)00037-5openalex-snapshot
Causes of construction delay: traditional contracts
inferredcites →https://doi.org/10.1016/s0263-7863(96)00039-7openalex-snapshot
A comparative study of causes of time overruns in Hong Kong construction projects
inferredcites →https://doi.org/10.1016/s0263-7863(98)00060-xopenalex-snapshot
Construction delay: a quantitative analysis
inferredcites →https://doi.org/10.1057/rlp.2009.11openalex-snapshot
Financial-related causes contributing to project delays
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2006)132:2(125)openalex-snapshot
Delay Mitigation in the Malaysian Construction Industry
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2006)132:6(636)openalex-snapshot
Construction Delays in Hong Kong Civil Engineering Projects
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2006)132:7(667)openalex-snapshot
Construction Delays and Their Causative Factors in Nigeria
inferredcites →https://doi.org/10.1061/(asce)0742-597x(1995)11:2(45)openalex-snapshot
Causes of Delay in Large Building Construction Projects
inferredcites →https://doi.org/10.1061/(asce)me.1943-5479.0000129openalex-snapshot
Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey
inferredcites →https://doi.org/10.1061/(asce)me.1943-5479.0000261openalex-snapshot
Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects
inferredcites →https://doi.org/10.1061/9780784412909.006openalex-snapshot
Causes of Construction Delays for Engineering Projects: An Egyptian Perspective
inferredcites →https://doi.org/10.1080/01446190600827033openalex-snapshot
Significant factors causing delay in the UAE construction industry
inferredcites →https://doi.org/10.1080/014461997373132openalex-snapshot
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
inferredcites →https://doi.org/10.1080/10429247.2004.11415255openalex-snapshot
Measuring Project Success in the Construction Industry
inferredcites →https://doi.org/10.1080/10429247.2018.1484266openalex-snapshot
Risk Identification in the Chilean Tunneling Industry
inferredcites →https://doi.org/10.1080/10429247.2022.2036068openalex-snapshot
Selection of Best Practices that Enhance Phase-Based Cost and Schedule Performances in Complex Construction Projects
inferredcites →https://doi.org/10.1080/15623599.2017.1354514openalex-snapshot
Investigating the causes of delay in grain bin construction projects: the case of China
inferredcites →https://doi.org/10.1080/15623599.2018.1484991openalex-snapshot
A statistical approach to assess the schedule delays and risks in Indian construction industry
inferredcites →https://doi.org/10.1080/15623599.2019.1613206openalex-snapshot
Influencing factors indicating time delay in construction projects: impact of firm size and experience
inferredcites →https://doi.org/10.1080/23311916.2017.1291117openalex-snapshot
Causes of delay in residential construction projects in Cambodia
inferredcites →https://doi.org/10.1093/acref/9780199571123.001.0001openalex-snapshot
Oxford Dictionary of English
inferredcites →https://doi.org/10.1108/09699981211277577openalex-snapshot
Comparative study of delay factors in Libyan and the UK construction industry
inferredcites →https://doi.org/10.1108/ijmpb-05-2017-0052openalex-snapshot
The top 10 universal delay factors in construction projects
inferredcites →https://doi.org/10.1108/ijmpb-09-2018-0178openalex-snapshot
Causes of delays on construction projects: a comprehensive list
inferredcites →https://doi.org/10.1108/jedt-12-2020-0481openalex-snapshot
Impact of COVID-19 on project performance in the UAE construction industry
inferredcites →https://doi.org/10.1108/jfmpc-11-2016-0052openalex-snapshot
The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman
inferredcites →https://doi.org/10.1109/idaacs41613.2017openalex-snapshot
2017 9th IEEE International Conference on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications (IDAACS)
inferredcites →https://doi.org/10.1109/tem.2019.2943161openalex-snapshot
A Risk Assessment Framework for Scheduling Projects With Resource and Duration Uncertainties
inferredcites →https://doi.org/10.1109/tem.2020.2973027openalex-snapshot
Designing Model in Delays Risk Management Planning and Result-Oriented Delays Analysis, Based on Variance and Importance Degree (BVID)
inferredcites →https://doi.org/10.1155/2013/381670openalex-snapshot
Causes of Variation Orders in Road Construction Projects in Sri Lanka
inferredcites →https://doi.org/10.1155/2022/8479064openalex-snapshot
Assessing the Causes of Time Overrun in Building and Road Construction Projects: The Case of Addis Ababa City, Ethiopia
inferredcites →https://doi.org/10.17148/iarjset.2016.3420openalex-snapshot
Study of Delay Factors in Construction Projects
inferredcites →https://doi.org/10.22581/muet1982.1901.09openalex-snapshot
Identification of Causes and Minimization of Delays in Highway Projects of Pakistan
inferredcites →https://doi.org/10.3390/en15030814openalex-snapshot
Delay Causes and Types in Nigerian Power Construction Projects
inferredcites →https://doi.org/10.3390/su14063521openalex-snapshot
Significant Factors Causing Delay in the Cambodian Construction Industry
inferredcites →https://doi.org/10.4018/ijssmet.2021010103openalex-snapshot
Cost Estimation Methods in Quality Management and Continuous Improvement
inferredcites →https://doi.org/10.47577/tssj.v9i1.1021openalex-snapshot
Impact of Covid-19 on Oman's Construction Industry
inferredcites →https://doi.org/10.47992/ijaeml.2581.7000.0122openalex-snapshot
Causes and Effects of Design Change of Construction Projects

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4681676openalex-extracted
A New Era of Automation in the Construction Industry: Implementing Leading-Edge Generative Artificial Intelligence, such as ChatGPT or Bard
inferred← citeshttps://doi.org/10.1061/jladah.ladr-1276openalex-snapshot
Developing a Construction Delay Prediction Model as a Delay-Avoidance Strategy for Public Construction Projects
inferred← citeshttps://doi.org/10.1080/15623599.2025.2599363openalex-snapshot
Machine learning for construction delay prediction: a model built on statistically validated key factors
inferred← citeshttps://doi.org/10.2478/otmcj-2026-0009openalex-snapshot
A bibliometric review of research on delays in construction projects between 2000-2024
inferred← citeshttps://doi.org/10.52131/pjhss.2024.v12i2.2311openalex-snapshot
Analyzing The Causes of Project Failure and Cost Overruns in Building Construction Industry by Using a Mixed-Methods Approach
inferred← citeshttps://doi.org/10.59400/be2054openalex-snapshot
Analysis of skilled labor shortage in the construction industry of developing countries
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.