On the public citation graph
https://doi.org/10.2139/ssrn.3704617
0 signed · 15 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1007/978-1-4419-0910-7openalex-extracted
Planning and Scheduling in Manufacturing and Services
inferredcites →https://doi.org/10.1111/j.1937-5956.2004.tb00146.xopenalex-extracted
Planning and Scheduling in Supply Chains: An Overview of Issues in Practice
inferredcites →https://doi.org/10.1126/stke.3342006tw156openalex-extracted
Matching Supply with Demand
inferredcites →https://doi.org/10.1287/mnsc.2017.2722openalex-extracted
Collaboration and Multitasking in Networks: Prioritization and Achievable Capacity
inferredcites →https://doi.org/10.1287/mnsc.2020.3704openalex-extracted
On the Structure of Bottlenecks in Processes
inferredcites →https://doi.org/10.1287/mnsc.37.5.587openalex-extracted
A Crane Scheduling Problem in a Computer-Integrated Manufacturing Environment
inferredcites →https://doi.org/10.1287/msom.2014.0498openalex-extracted
Collaboration and Multitasking in Networks: Architectures, Bottlenecks, and Capacity
inferredcites →https://doi.org/10.1287/msom.2017.0689openalex-extracted
Determining Process Capacity: Intractability and Efficient Special Cases
inferredcites →https://doi.org/10.1287/opre.37.6.925openalex-extracted
Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
inferredcites →https://doi.org/10.1287/opre.45.1.72openalex-extracted
Performance Measures and Schedules in Periodic Job Shops
inferredcites →https://doi.org/10.1287/opre.45.6.952openalex-extracted
Cyclic Scheduling of Identical Parts in a Robotic Cell
inferredcites →https://doi.org/10.1287/opre.48.1.177.12451openalex-extracted
Minimizing Cycle Time in a Blocking Flowshop
What points at this work
Incoming claims: where this work appears in other papers’ reference lists and arguments.
inferred← citeshttps://doi.org/10.2139/ssrn.5213819openalex-snapshot
Bias in Managerial Judgment of Operational Processes: Hasty Expectations Under Input Uncertainty
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.