On the public citation graph

https://doi.org/10.2139/ssrn.4145749

0 signed · 27 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/pmj.21556openalex-extracted
Cost Overruns in Hydrocarbon Megaprojects: A Critical Review and Implications for Research
inferredcites →https://doi.org/10.1016/c2011-0-07476-8openalex-extracted
Handbook of Liquefied Natural Gas
inferredcites →https://doi.org/10.1016/j.egyr.2019.01.008openalex-extracted
Schedule overruns as a barrier for liquefied natural gas projects: A review of the literature and research agenda
inferredcites →https://doi.org/10.1016/j.ibusrev.2013.01.003openalex-extracted
Managing global megaprojects: Complexity and risk management
inferredcites →https://doi.org/10.1016/j.ijproman.2017.01.012openalex-extracted
The societal governance of megaproject social responsibility
inferredcites →https://doi.org/10.1016/j.renene.2018.03.025openalex-extracted
Parametric analysis for cost-optimal renewable energy integration into residential buildings: Techno-economic model
inferredcites →https://doi.org/10.1021/acs.iecr.7b03899openalex-extracted
Key Issues and Challenges on the Liquefied Natural Gas Value Chain: A Review from the Process Systems Engineering Point of View
inferredcites →https://doi.org/10.1057/ejis.2008.33openalex-extracted
Improving the impact of IT development projects: the benefits realization capability model
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000476openalex-extracted
Keys to Success in Megaproject Management in Mexico and the United States: Case Study
inferredcites →https://doi.org/10.1061/(asce)me.1943-5479.0000734openalex-extracted
Novel Approach to Satisfying Stakeholders in Megaprojects: Balancing Mutual Values
inferredcites →https://doi.org/10.1080/14488353.2017.1362806openalex-extracted
Shaping complex mega-projects: practical steps for success
inferredcites →https://doi.org/10.1080/15578771.2016.1276109openalex-extracted
Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East
inferredcites →https://doi.org/10.1080/15623599.2020.1735610openalex-extracted
Identifying the gaps in construction megaproject management research: a bibliographic analysis
inferredcites →https://doi.org/10.1108/ecam-05-2016-0117openalex-extracted
Critical factors impacting the performance of mega-projects
inferredcites →https://doi.org/10.1108/ijmpb-02-2018-0020openalex-extracted
Top government hands-on megaproject management: the case of Istanbul’s grand airport
inferredcites →https://doi.org/10.1108/manm-01-2022-0006openalex-extracted
An overview on megaproject management systems
inferredcites →https://doi.org/10.1115/ipc2014-33515openalex-extracted
Why Projects Fail (and What We Can Do About It)
inferredcites →https://doi.org/10.1176/appi.ajp.2007.07121842openalex-extracted
Me, Myself, and Them: A Firsthand Account of One Young Person’s Experience With Schizophrenia
inferredcites →https://doi.org/10.1177/875697281704800602openalex-extracted
The past and Present of Megaprojects
inferredcites →https://doi.org/10.1680/jmapl.18.00021openalex-extracted
Discussion: Experience of the role of contracts in megaproject execution
inferredcites →https://doi.org/10.18820/24150487/as27i1.5openalex-extracted
An assessment of the causes of schedule and cost overruns in South African megaprojects: A case of the critical energy sector projects of Medupi and Kusile
inferredcites →https://doi.org/10.2118/191764-msopenalex-extracted
Mapping the Success Dimensions of Large Oil and Gas Projects
inferredcites →https://doi.org/10.4186/ej.2022.26.1.55openalex-extracted
An Integration of Project Management Body of Knowledge and Project Management Information System to Improve On-time Deliverable of Liquefied Natural Gas Station Construction Projects

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4819807openalex-snapshot
Selection of Optimal Design Alternatives for the C3mr Lng Technology Processing Various Feedstocks: Optimization and Multi-Criteria Decision Analysis
inferred← citeshttps://doi.org/10.30574/wjaets.2024.11.2.0075openalex-snapshot
A review of sustainable project management practices in modern LNG industry initiatives
inferred← citeshttps://doi.org/10.30574/wjarr.2024.21.2.0463openalex-snapshot
Reviewing the development of floating LNG facilities and their global impact
inferred← citeshttps://doi.org/10.61426/sjbcm.v11i1.2853openalex-snapshot
PROJECT PROCUREMENT MANAGEMENT PRACTICES AND PERFORMANCE OF ROAD CONSTRUCTION PROJECTS IN HOMA BAY COUNTY, KENYA
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.