Frequent Extensions of the Resource-Constrained Project Scheduling Problem: A Systematic Literature Review

0 signed · 232 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/int.21552openalex-snapshot
Fuzzy resource-constrained project scheduling using taboo search algorithm
inferredcites →https://doi.org/10.1002/int.21682openalex-snapshot
An Uncertain Random Programming Model for Project Scheduling Problem
inferredcites →https://doi.org/10.1002/jrsm.1378openalex-snapshot
Which academic search systems are suitable for systematic reviews or meta‐analyses? Evaluating retrieval qualities of Google Scholar, PubMed, and 26 other resources
inferredcites →https://doi.org/10.1002/nav.3800230110openalex-snapshot
Project scheduling: The effects of problem structure on heuristic performance
inferredcites →https://doi.org/10.1007/978-3-030-05983-5_2openalex-snapshot
Maximising the Net Present Value of Project Schedules Using CMSA and Parallel ACO
inferredcites →https://doi.org/10.1007/978-3-642-29210-1_75openalex-snapshot
Lower bounds for a multi-skill project scheduling problem
inferredcites →https://doi.org/10.1007/978-94-015-8702-0openalex-snapshot
Fuzzy Set Theory—and Its Applications
inferredcites →https://doi.org/10.1007/bf01919323openalex-snapshot
Stochastic scheduling problems I — General strategies
inferredcites →https://doi.org/10.1007/bf02016875openalex-snapshot
A coword analysis of scientometrics
inferredcites →https://doi.org/10.1007/s00170-012-4045-zopenalex-snapshot
A differential evolution algorithm to solve multi-skilled project portfolio scheduling problems
inferredcites →https://doi.org/10.1007/s00291-008-0144-5openalex-snapshot
Managing and modelling general resource transfers in (multi-)project scheduling
inferredcites →https://doi.org/10.1007/s00291-009-0178-3openalex-snapshot
A (μ, λ)-coordination mechanism for agent-based multi-project scheduling
inferredcites →https://doi.org/10.1007/s00291-010-0233-0openalex-snapshot
Project scheduling with flexible resources: formulation and inequalities
inferredcites →https://doi.org/10.1007/s00477-023-02589-9openalex-snapshot
Sustainable project selection and scheduling using scenario-based stochastic programming: a case study of industrial projects
inferredcites →https://doi.org/10.1007/s00500-014-1455-xopenalex-snapshot
Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1007/s00521-022-07321-2openalex-snapshot
A hybrid projection method for resource-constrained project scheduling problem under uncertainty
inferredcites →https://doi.org/10.1007/s10458-017-9370-zopenalex-snapshot
A multi-unit combinatorial auction based approach for decentralized multi-project scheduling
inferredcites →https://doi.org/10.1007/s10479-006-0158-9openalex-snapshot
A market-based multi-agent system model for decentralized multi-project scheduling
inferredcites →https://doi.org/10.1007/s10479-010-0777-zopenalex-snapshot
Time slack-based techniques for robust project scheduling subject to resource uncertainty
inferredcites →https://doi.org/10.1007/s10479-018-2899-7openalex-snapshot
Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1007/s10479-021-04106-zopenalex-snapshot
A bi-objective hierarchical program scheduling problem and its solution based on NSGA-III
inferredcites →https://doi.org/10.1007/s10479-023-05343-0openalex-snapshot
Software project scheduling under activity duration uncertainty
inferredcites →https://doi.org/10.1007/s10479-023-05403-5openalex-snapshot
A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
inferredcites →https://doi.org/10.1007/s10479-023-05537-6openalex-snapshot
Exact and heuristic methods for Anchor-Robust and Adjustable-Robust RCPSP
inferredcites →https://doi.org/10.1007/s10479-023-05784-7openalex-snapshot
Solving a real-life multi-skill resource-constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1007/s10479-024-05841-9openalex-snapshot
The performance of priority rules for the dynamic stochastic resource-constrained multi-project scheduling problem: an experimental investigation
inferredcites →https://doi.org/10.1007/s10479-024-05854-4openalex-snapshot
A robust multi-project scheduling problem under a resource dedication-transfer policy
inferredcites →https://doi.org/10.1007/s10479-024-05895-9openalex-snapshot
A new proactive and reactive approach for resource-constrained project scheduling problem under activity and resource disruption: a scenario-based robust optimization approach
inferredcites →https://doi.org/10.1007/s10479-024-05896-8openalex-snapshot
Analysis of a time–cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process
inferredcites →https://doi.org/10.1007/s10489-020-01663-xopenalex-snapshot
P-GWO and MOFA: two new algorithms for the MSRCPSP with the deterioration effect and financial constraints (case study of a gas treating company)
inferredcites →https://doi.org/10.1007/s10696-012-9140-9openalex-snapshot
Resource dedication problem in a multi-project environment
inferredcites →https://doi.org/10.1007/s10700-010-9076-zopenalex-snapshot
New fuzzy models for time-cost trade-off problem
inferredcites →https://doi.org/10.1007/s10700-012-9133-xopenalex-snapshot
Solving project scheduling problem with the philosophy of fuzzy random programming
inferredcites →https://doi.org/10.1007/s10732-014-9260-3openalex-snapshot
A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
inferredcites →https://doi.org/10.1007/s10845-013-0767-5openalex-snapshot
Learning process on priority rules to solve the RCMPSP
inferredcites →https://doi.org/10.1007/s10845-014-0980-xopenalex-snapshot
Uncertain project scheduling problem with resource constraints
inferredcites →https://doi.org/10.1007/s10951-009-0112-1openalex-snapshot
Theoretical aspects of multicriteria flight gate scheduling: deterministic and fuzzy models
inferredcites →https://doi.org/10.1007/s10951-009-0143-7openalex-snapshot
New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
inferredcites →https://doi.org/10.1007/s10951-014-0401-1openalex-snapshot
A learning-based optimization approach to multi-project scheduling
inferredcites →https://doi.org/10.1007/s10951-014-0402-0openalex-snapshot
The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
inferredcites →https://doi.org/10.1007/s10951-015-0421-5openalex-snapshot
Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
inferredcites →https://doi.org/10.1007/s10951-015-0422-4openalex-snapshot
An integer programming approach to the multimode resource-constrained multiproject scheduling problem
inferredcites →https://doi.org/10.1007/s10951-015-0423-3openalex-snapshot
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
inferredcites →https://doi.org/10.1007/s10951-015-0425-1openalex-snapshot
Robust execution strategies for project scheduling with unreliable resources and stochastic durations
inferredcites →https://doi.org/10.1007/s10951-016-0505-xopenalex-snapshot
New strategies for stochastic resource-constrained project scheduling
inferredcites →https://doi.org/10.1007/s10951-017-0553-xopenalex-snapshot
The proactive and reactive resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1007/s10951-020-00651-wopenalex-snapshot
Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
inferredcites →https://doi.org/10.1007/s12351-017-0358-xopenalex-snapshot
A lagrangian relaxation algorithm for facility location of resource-constrained decentralized multi-project scheduling problems
inferredcites →https://doi.org/10.1007/s12351-019-00468-2openalex-snapshot
Decomposition based extended project scheduling for make-to-order production
inferredcites →https://doi.org/10.1007/s12667-019-00374-8openalex-snapshot
A framework for preemptive multi-skilled project scheduling problem with time-of-use energy tariffs
inferredcites →https://doi.org/10.1007/s13369-017-3047-4openalex-snapshot
An Improved Tabu Search for Multi-skill Resource-Constrained Project Scheduling Problems Under Step-Deterioration
inferredcites →https://doi.org/10.1007/s13762-022-04377-4openalex-snapshot
An optimization model for construction project scheduling by considering CO2 emissions with multi-mode resource constraints under interval-valued fuzzy uncertainty
inferredcites →https://doi.org/10.1007/s40815-020-00984-wopenalex-snapshot
Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
inferredcites →https://doi.org/10.1016/0166-218x(83)90012-4openalex-snapshot
Scheduling subject to resource constraints: classification and complexity
inferredcites →https://doi.org/10.1016/0305-0548(89)90040-3openalex-snapshot
Heuristic framework for the resource constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1016/0377-2217(81)90348-9openalex-snapshot
Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
inferredcites →https://doi.org/10.1016/0377-2217(93)90175-mopenalex-snapshot
Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
inferredcites →https://doi.org/10.1016/j.apm.2017.09.015openalex-snapshot
Stochastic Project Scheduling with Hierarchical Alternatives
inferredcites →https://doi.org/10.1016/j.asoc.2017.01.024openalex-snapshot
Multi-skilled project scheduling with level-dependent rework risk; three multi-objective mechanisms based on cuckoo search
inferredcites →https://doi.org/10.1016/j.asoc.2017.05.030openalex-snapshot
A hybrid project scheduling and material ordering problem: Modeling and solution algorithms
inferredcites →https://doi.org/10.1016/j.asoc.2017.10.014openalex-snapshot
Hybrid Differential Evolution and Greedy Algorithm (DEGR) for solving Multi-Skill Resource-Constrained Project Scheduling Problem
inferredcites →https://doi.org/10.1016/j.asoc.2019.105805openalex-snapshot
A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.asoc.2019.106059openalex-snapshot
Cooperative coevolution with an improved resource allocation for large-scale multi-objective software project scheduling
inferredcites →https://doi.org/10.1016/j.asoc.2020.106988openalex-snapshot
Toward a scalable type-2 fuzzy model for resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.asoc.2021.107480openalex-snapshot
A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem
inferredcites →https://doi.org/10.1016/j.asoc.2022.109087openalex-snapshot
A two-stage genetic programming framework for Stochastic Resource Constrained Multi-Project Scheduling Problem under New Project Insertions
inferredcites →https://doi.org/10.1016/j.asoc.2022.109253openalex-snapshot
Investigation of benchmark dataset for many-objective Multi-Skill Resource Constrained Project Scheduling Problem
inferredcites →https://doi.org/10.1016/j.asoc.2023.111201openalex-snapshot
Bi-objective multi-mode resource-constrained multi-project scheduling using combined NSGA II and Q-learning algorithm
inferredcites →https://doi.org/10.1016/j.asoc.2024.111716openalex-snapshot
Simulation-based hybrid genetic algorithms for the stochastic multi-mode resource-constrained project scheduling problem with minimized financial risk
inferredcites →https://doi.org/10.1016/j.autcon.2018.11.029openalex-snapshot
Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution
inferredcites →https://doi.org/10.1016/j.autcon.2020.103485openalex-snapshot
Integrated scheduling of suppliers and multi-project activities for green construction supply chains under uncertainty
inferredcites →https://doi.org/10.1016/j.autcon.2023.104958openalex-snapshot
Extensions of the resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.autcon.2024.105360openalex-snapshot
Multi-skilled resource-constrained multi-project scheduling problem with dexterity improvement of workforce
inferredcites →https://doi.org/10.1016/j.cie.2011.03.015openalex-snapshot
A comprehensive framework for project selection problem under uncertainty and real-world constraints
inferredcites →https://doi.org/10.1016/j.cie.2014.03.020openalex-snapshot
The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study
inferredcites →https://doi.org/10.1016/j.cie.2015.02.006openalex-snapshot
Project scheduling under partially renewable resources and resource consumption during setup operations
inferredcites →https://doi.org/10.1016/j.cie.2016.05.017openalex-snapshot
A robust bi-objective model for concurrent planning of project scheduling and material procurement
inferredcites →https://doi.org/10.1016/j.cie.2016.12.040openalex-snapshot
Resource constrained project scheduling with uncertain activity durations
inferredcites →https://doi.org/10.1016/j.cie.2017.03.001openalex-snapshot
Scheduling multiple, resource-constrained, iterative, product development projects with genetic algorithms
inferredcites →https://doi.org/10.1016/j.cie.2017.06.016openalex-snapshot
A max-min ant system for the finance-based scheduling problem
inferredcites →https://doi.org/10.1016/j.cie.2017.07.028openalex-snapshot
A new extension of the RCPSP in a multi-site context: Mathematical model and metaheuristics
inferredcites →https://doi.org/10.1016/j.cie.2017.09.003openalex-snapshot
An experimental approach for examining solution errors of engineering problems with uncertain parameters
inferredcites →https://doi.org/10.1016/j.cie.2017.10.021openalex-snapshot
On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1016/j.cie.2019.02.039openalex-snapshot
A hybrid multi-objective EDA for robust resource constraint project scheduling with uncertainty
inferredcites →https://doi.org/10.1016/j.cie.2019.04.014openalex-snapshot
A computational experiment to explore better robustness measures for project scheduling under two types of uncertain environments
inferredcites →https://doi.org/10.1016/j.cie.2019.04.046openalex-snapshot
Robust resource-constrained project scheduling problem of the project’s subcontractors in a cooperative environment under uncertainty: Social complex construction case study
inferredcites →https://doi.org/10.1016/j.cie.2019.07.032openalex-snapshot
Multi-objective teaching-learning-based meta-heuristic algorithms to solve multi-skilled project scheduling problem
inferredcites →https://doi.org/10.1016/j.cie.2019.106060openalex-snapshot
Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival
inferredcites →https://doi.org/10.1016/j.cie.2020.106287openalex-snapshot
Efficient priority rules for project scheduling under dynamic environments: A heuristic approach
inferredcites →https://doi.org/10.1016/j.cie.2020.106582openalex-snapshot
A new resource buffer insertion approach for proactive resource investment problem
inferredcites →https://doi.org/10.1016/j.cie.2020.106857openalex-snapshot
Resource-constrained multi-project scheduling with activity and time flexibility
inferredcites →https://doi.org/10.1016/j.cie.2020.107004openalex-snapshot
Multi-skilling in scheduling problems: A review on models, methods and applications
inferredcites →https://doi.org/10.1016/j.cie.2021.107316openalex-snapshot
Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction
inferredcites →https://doi.org/10.1016/j.cie.2021.107345openalex-snapshot
Problem-specific multi-objective invasive weed optimization algorithm for reconnaissance mission scheduling problem
inferredcites →https://doi.org/10.1016/j.cie.2021.107553openalex-snapshot
A three-stage decomposition algorithm for decentralized multi-project scheduling under uncertainty
inferredcites →https://doi.org/10.1016/j.cie.2022.108147openalex-snapshot
Mathematical formulations for project scheduling problems with categorical and hierarchical skills
inferredcites →https://doi.org/10.1016/j.cie.2022.108240openalex-snapshot
Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer
inferredcites →https://doi.org/10.1016/j.cie.2022.108402openalex-snapshot
Credibility-based chance-constrained multimode resource-constrained project scheduling problem under fuzzy uncertainty
inferredcites →https://doi.org/10.1016/j.cie.2022.108711openalex-snapshot
Systematic literature review of integrated project scheduling and material ordering problem: Formulations and solution methods
inferredcites →https://doi.org/10.1016/j.cie.2023.109741openalex-snapshot
A hybrid metaheuristic algorithm for resource-constrained proactive project scheduling with uncertainty-handling effort
inferredcites →https://doi.org/10.1016/j.cie.2024.110018openalex-snapshot
Dynamic scheduling of decentralized high-end equipment R&D projects via deep reinforcement learning
inferredcites →https://doi.org/10.1016/j.cie.2024.110333openalex-snapshot
A matheuristic-oriented iterated greedy algorithm for multi-mode resource-constrained project scheduling problem under uncertainty
inferredcites →https://doi.org/10.1016/j.cie.2024.110380openalex-snapshot
Supply chain integrated resource-constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1016/j.compchemeng.2016.02.018openalex-snapshot
A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.compchemeng.2016.11.001openalex-snapshot
Preemptive multi-skilled resource investment project scheduling problem: Mathematical modelling and solution approaches
inferredcites →https://doi.org/10.1016/j.cor.2009.06.012openalex-snapshot
Solving a comprehensive model for multiobjective project portfolio selection
inferredcites →https://doi.org/10.1016/j.cor.2010.03.002openalex-snapshot
A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
inferredcites →https://doi.org/10.1016/j.cor.2015.07.003openalex-snapshot
Modelling and solving generalised operational surgery scheduling problems
inferredcites →https://doi.org/10.1016/j.cor.2018.06.016openalex-snapshot
A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.cor.2020.105104openalex-snapshot
An evolutionary approach for resource constrained project scheduling with uncertain changes
inferredcites →https://doi.org/10.1016/j.cor.2021.105232openalex-snapshot
A compact reformulation of the two-stage robust resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.cor.2022.105795openalex-snapshot
Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty
inferredcites →https://doi.org/10.1016/j.cor.2023.106453openalex-snapshot
Γ-robust optimization of project scheduling problems
inferredcites →https://doi.org/10.1016/j.ejor.2004.04.002openalex-snapshot
Project scheduling under uncertainty: Survey and research potentials
inferredcites →https://doi.org/10.1016/j.ejor.2008.07.036openalex-snapshot
A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
inferredcites →https://doi.org/10.1016/j.ejor.2009.11.005openalex-snapshot
A survey of variants and extensions of the resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2010.05.046openalex-snapshot
Robust scheduling and robustness measures for the discrete time/cost trade-off problem
inferredcites →https://doi.org/10.1016/j.ejor.2012.11.029openalex-snapshot
Personnel scheduling: A literature review
inferredcites →https://doi.org/10.1016/j.ejor.2014.06.025openalex-snapshot
Multi-mode resource constrained multi-project scheduling and resource portfolio problem
inferredcites →https://doi.org/10.1016/j.ejor.2014.10.038openalex-snapshot
Workforce Planning Incorporating Skills: State of the Art
inferredcites →https://doi.org/10.1016/j.ejor.2016.07.024openalex-snapshot
A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2017.03.022openalex-snapshot
Generic negotiation mechanisms with side payments – Design, analysis and application for decentralized resource-constrained multi-project scheduling problems
inferredcites →https://doi.org/10.1016/j.ejor.2018.04.025openalex-snapshot
Efficient priority rules for the stochastic resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2018.11.061openalex-snapshot
Competence-based estimation of activity duration in IT projects
inferredcites →https://doi.org/10.1016/j.ejor.2019.01.063openalex-snapshot
A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2019.05.023openalex-snapshot
Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules
inferredcites →https://doi.org/10.1016/j.ejor.2019.09.052openalex-snapshot
A robust optimization approach for the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2020.10.032openalex-snapshot
A new algorithm for resource-constrained project scheduling with breadth and depth of skills
inferredcites →https://doi.org/10.1016/j.ejor.2021.01.011openalex-snapshot
Underground mine scheduling under uncertainty
inferredcites →https://doi.org/10.1016/j.ejor.2021.02.034openalex-snapshot
Dominance-based linear formulation for the Anchor-Robust Project Scheduling Problem
inferredcites →https://doi.org/10.1016/j.ejor.2021.03.036openalex-snapshot
Fatigue, personnel scheduling and operations: Review and research opportunities
inferredcites →https://doi.org/10.1016/j.ejor.2021.05.004openalex-snapshot
An updated survey of variants and extensions of the resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2022.01.018openalex-snapshot
Integrated multi-project planning and scheduling - a multiagent approach
inferredcites →https://doi.org/10.1016/j.ejor.2022.05.049openalex-snapshot
A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2022.09.033openalex-snapshot
Resource-constrained multi-project scheduling problem: A survey
inferredcites →https://doi.org/10.1016/j.ejor.2023.02.029openalex-snapshot
Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty
inferredcites →https://doi.org/10.1016/j.ejor.2023.07.035openalex-snapshot
Robust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity duration
inferredcites →https://doi.org/10.1016/j.ejor.2023.10.046openalex-snapshot
A simulation-based approximate dynamic programming approach to dynamic and stochastic resource-constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2023.11.009openalex-snapshot
A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2024.06.036openalex-snapshot
Mixed-integer linear programming for project scheduling under various resource constraints
inferredcites →https://doi.org/10.1016/j.energy.2018.11.070openalex-snapshot
Multi-skill project scheduling problem under time-of-use electricity tariffs and shift differential payments
inferredcites →https://doi.org/10.1016/j.engappai.2012.07.012openalex-snapshot
Project scheduling under uncertainty using fuzzy modelling and solving techniques
inferredcites →https://doi.org/10.1016/j.engappai.2023.106726openalex-snapshot
An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: A case study of building a sports center
inferredcites →https://doi.org/10.1016/j.esr.2023.101189openalex-snapshot
An optimization model for energy project scheduling problem with cost-risk-quality-social consideration trade-off under uncertainty: A real-world application
inferredcites →https://doi.org/10.1016/j.eswa.2016.03.017openalex-snapshot
Priority-based heuristics for the multi-skill resource constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.eswa.2019.112915openalex-snapshot
A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.eswa.2020.113189openalex-snapshot
An interval-stochastic programming based approach for a fully uncertain multi-objective and multi-mode resource investment project scheduling problem with an application to ERP project implementation
inferredcites →https://doi.org/10.1016/j.eswa.2021.114635openalex-snapshot
Minimizing activity exposures in project scheduling under uncertainty
inferredcites →https://doi.org/10.1016/j.eswa.2021.115593openalex-snapshot
New closed-loop approximate dynamic programming for solving stochastic decentralized multi-project scheduling problem with resource transfers
inferredcites →https://doi.org/10.1016/j.eswa.2022.116911openalex-snapshot
A filtering genetic programming framework for stochastic resource constrained multi-project scheduling problem under new project insertions
inferredcites →https://doi.org/10.1016/j.eswa.2022.117385openalex-snapshot
A two-stage approach with softmax scoring mechanism for a multi-project scheduling problem sharing multi-skilled staff
inferredcites →https://doi.org/10.1016/j.eswa.2022.119188openalex-snapshot
Critical chain based Proactive-Reactive scheduling for Resource-Constrained project scheduling under uncertainty
inferredcites →https://doi.org/10.1016/j.eswa.2022.119472openalex-snapshot
A matrix-based flexible project-planning library and indicators
inferredcites →https://doi.org/10.1016/j.eswa.2023.120623openalex-snapshot
A bi-objective optimization for finance-based and resource-constrained robust project scheduling
inferredcites →https://doi.org/10.1016/j.eswa.2023.122002openalex-snapshot
Robustifying the resource-constrained project scheduling against uncertain durations
inferredcites →https://doi.org/10.1016/j.ijpe.2010.03.009openalex-snapshot
Resource-constrained multi-project scheduling: Priority rule performance revisited
inferredcites →https://doi.org/10.1016/j.ijpe.2013.08.013openalex-snapshot
A multi-agent system for decentralized multi-project scheduling with resource transfers
inferredcites →https://doi.org/10.1016/j.ijpe.2019.107522openalex-snapshot
A classification and review of approaches and methods for modeling uncertainty in projects
inferredcites →https://doi.org/10.1016/j.ijpe.2021.108183openalex-snapshot
The impact of flexibility on engineer-to-order production planning
inferredcites →https://doi.org/10.1016/j.ijpe.2024.109427openalex-snapshot
Efficient optimization of robust project scheduling for industry 4.0: A hybrid approach based on machine learning and meta-heuristic algorithms
inferredcites →https://doi.org/10.1016/j.ins.2016.09.010openalex-snapshot
Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1016/j.ins.2019.01.002openalex-snapshot
Improved selection in evolutionary multi–objective optimization of multi–skill resource–constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ins.2020.08.118openalex-snapshot
Diversity based selection for many-objective evolutionary optimisation problems with constraints
inferredcites →https://doi.org/10.1016/j.ins.2024.120400openalex-snapshot
Balancing Pareto Front exploration of Non-dominated Tournament Genetic Algorithm (B-NTGA) in solving multi-objective NP-hard problems with constraints
inferredcites →https://doi.org/10.1016/j.jbusres.2019.07.039openalex-snapshot
Literature review as a research methodology: An overview and guidelines
inferredcites →https://doi.org/10.1016/j.jclepro.2020.122073openalex-snapshot
A comprehensive mathematical model for resource-constrained multi-objective project portfolio selection and scheduling considering sustainability and projects splitting
inferredcites →https://doi.org/10.1016/j.knosys.2021.107099openalex-snapshot
A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.neucom.2014.04.056openalex-snapshot
A critical chains based distributed multi-project scheduling approach
inferredcites →https://doi.org/10.1016/j.omega.2016.05.007openalex-snapshot
Linear solution schemes for Mean-SemiVariance Project portfolio selection problems: An application in the oil and gas industry
inferredcites →https://doi.org/10.1016/j.omega.2016.09.009openalex-snapshot
An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
inferredcites →https://doi.org/10.1016/j.seps.2021.101182openalex-snapshot
Multi-objective competency-based approach to project scheduling and staff assignment: Case study of an internal audit project
inferredcites →https://doi.org/10.1016/j.swevo.2017.06.001openalex-snapshot
A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.swevo.2024.101678openalex-snapshot
Co-evolution genetic programming-based hyper-heuristics for the stochastic project scheduling problem with resource transfer and idle costs
inferredcites →https://doi.org/10.1016/j.techfore.2021.121137openalex-snapshot
A new approach for material ordering and multi-mode resource constraint project scheduling problem in a multi-site context under interval-valued fuzzy uncertainty
inferredcites →https://doi.org/10.1016/s0019-9958(65)90241-xopenalex-snapshot
Fuzzy sets
inferredcites →https://doi.org/10.1016/s0377-2217(96)00170-1openalex-snapshot
PSPLIB - A project scheduling problem library
inferredcites →https://doi.org/10.1016/s0377-2217(97)00341-xopenalex-snapshot
Multi-resource shop scheduling with resource flexibility
inferredcites →https://doi.org/10.1023/a:1025753309346openalex-snapshot
Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism
inferredcites →https://doi.org/10.1038/s41598-023-45970-yopenalex-snapshot
Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
inferredcites →https://doi.org/10.1057/jit.2014.26openalex-snapshot
On being ‘Systematic’ in Literature Reviews in IS
inferredcites →https://doi.org/10.1057/jors.1980.134openalex-snapshot
Two Approaches to Problems of Resource Allocation Among Project Activities — A Comparative Study
inferredcites →https://doi.org/10.1057/s41274-016-0122-2openalex-snapshot
Uncertain chance-constrained programming model for project scheduling problem
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000936openalex-snapshot
Scheduling Policies for the Stochastic Resource Leveling Problem
inferredcites →https://doi.org/10.1061/(asce)cp.1943-5487.0000070openalex-snapshot
Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects’ Portfolio
inferredcites →https://doi.org/10.1061/(asce)cp.1943-5487.0000382openalex-snapshot
Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem
inferredcites →https://doi.org/10.1061/(asce)cp.1943-5487.0000671openalex-snapshot
Resource Pool Location for Periodic Services in Decentralized Multi-Project Scheduling Problems
inferredcites →https://doi.org/10.1061/(asce)me.1943-5479.0000243openalex-snapshot
Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty
inferredcites →https://doi.org/10.1061/(asce)me.1943-5479.0000426openalex-snapshot
Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic
inferredcites →https://doi.org/10.1061/9780784485231.019openalex-snapshot
A Heuristic Algorithm for a Robust Resource-Constrained Project Scheduling Problem with Multi-Skilled Resources
inferredcites →https://doi.org/10.1061/jcemd4.coeng-13150openalex-snapshot
The Integrated Problem of Construction Project Scheduling and Multiskilled Staff Assignment with Learning Effect
inferredcites →https://doi.org/10.1080/00207540500219031openalex-snapshot
A fuzzy ANP-based approach to R&D project selection: A case study
inferredcites →https://doi.org/10.1080/00207543.2014.946570openalex-snapshot
Proactive approach for stochastic RCMPSP based on multi-priority rule combinations
inferredcites →https://doi.org/10.1080/00207543.2014.952792openalex-snapshot
Project management for uncertainty with multiple objectives optimisation of time, cost and reliability
inferredcites →https://doi.org/10.1080/00207543.2017.1326641openalex-snapshot
A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution
inferredcites →https://doi.org/10.1080/00207543.2018.1504245openalex-snapshot
A novel branch-and-bound algorithm for the chance-constrained resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1080/00207543.2018.1552371openalex-snapshot
A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncertainty of activity duration
inferredcites →https://doi.org/10.1080/00207543.2019.1693654openalex-snapshot
Mixed-integer/linear and constraint programming approaches for activity scheduling in a nuclear research facility
inferredcites →https://doi.org/10.1080/00207543.2019.1695168openalex-snapshot
A bi-objective robust resource allocation model for the RCPSP considering resource transfer costs
inferredcites →https://doi.org/10.1080/00207543.2020.1857450openalex-snapshot
Performance evaluation of scheduling policies for the dynamic and stochastic resource-constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1080/00207543.2023.2294109openalex-snapshot
A surrogate-assisted dual-tree genetic programming framework for dynamic resource constrained multi-project scheduling problem
showing the first 200 of 232 · page through all 232
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.