On the public citation graph

Optimal Crane Scheduling for Tankhouse Systems

0 signed · 29 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/nav.20121openalex-snapshot
A branch‐and‐cut algorithm for the quay crane scheduling problem in a container terminal
inferredcites →https://doi.org/10.1002/nav.21768openalex-snapshot
Optimally scheduling interfering and non‐interfering cranes
inferredcites →https://doi.org/10.1007/10704567_6openalex-snapshot
Constraint Programming in OPL
inferredcites →https://doi.org/10.1007/978-3-031-67398-6_58openalex-snapshot
Prevention of Anode Passivation in Copper Electrorefining
inferredcites →https://doi.org/10.1007/978-3-319-17025-1_4openalex-snapshot
A Continuous-Time Model for Multiple Yard Crane Scheduling with Last-Minute Job Arrivals
inferredcites →https://doi.org/10.1007/s10696-020-09385-5openalex-snapshot
A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
inferredcites →https://doi.org/10.1007/s10951-009-0105-0openalex-snapshot
A fast heuristic for quay crane scheduling with interference constraints
inferredcites →https://doi.org/10.1007/s13675-014-0026-3openalex-snapshot
A constraint programming primer
inferredcites →https://doi.org/10.1016/0098-1354(93)e0010-7openalex-snapshot
Modelling and computational techniques for logic based integer programming
inferredcites →https://doi.org/10.1016/0191-2615(89)90001-5openalex-snapshot
The crane scheduling problem
inferredcites →https://doi.org/10.1016/j.aei.2021.101285openalex-snapshot
Quay crane scheduling in automated container terminal for the trade-off between operation efficiency and energy consumption
inferredcites →https://doi.org/10.1016/j.autcon.2023.104960openalex-snapshot
Technologies, levels and directions of crane-lift automation in construction
inferredcites →https://doi.org/10.1016/j.cie.2021.107623openalex-snapshot
Integrated optimization of storage location assignment and crane scheduling in an unmanned slab yard
inferredcites →https://doi.org/10.1016/j.cie.2023.109149openalex-snapshot
A comprehensive review and directions for future research on the integrated scheduling of quay cranes and automated guided vehicles and yard cranes in automated container terminals
inferredcites →https://doi.org/10.1016/j.cor.2014.03.005openalex-snapshot
Scheduling multiple factory cranes on a common track
inferredcites →https://doi.org/10.1016/j.cor.2024.106853openalex-snapshot
Solving the yard crane scheduling problem with dynamic assignment of input/output points
inferredcites →https://doi.org/10.1016/j.ejor.2008.08.019openalex-snapshot
Discrete time model and algorithms for container yard crane scheduling
inferredcites →https://doi.org/10.1016/j.ejor.2017.05.040openalex-snapshot
MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2020.02.021openalex-snapshot
Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel
inferredcites →https://doi.org/10.1016/j.swevo.2023.101374openalex-snapshot
MILP modeling and optimization of multi-objective flexible job shop scheduling problem with controllable processing times
inferredcites →https://doi.org/10.1016/j.tre.2013.08.006openalex-snapshot
Constraint programming approach to quay crane scheduling problem
inferredcites →https://doi.org/10.1016/s1574-6526(07)03004-0openalex-snapshot
Chapter 4 Constraint Programming
inferredcites →https://doi.org/10.1061/(asce)0887-3801(2009)23:6(363)openalex-snapshot
Three-Dimensional Simulation and Visualization of Crane Assisted Construction Erection Processes
inferredcites →https://doi.org/10.1109/access.2022.3180752openalex-snapshot
Heuristic/Metaheuristic-Based Simulation Optimization Approaches for Integrated Scheduling of Yard Crane, Yard Truck, and Quay Crane Considering Import and Export Containers
inferredcites →https://doi.org/10.1287/ics.2011.0009openalex-snapshot
Factory Crane Scheduling by Dynamic Programming
inferredcites →https://doi.org/10.1287/ijoc.14.4.295.2828openalex-snapshot
Logic, Optimization, and Constraint Programming
inferredcites →https://doi.org/10.1515/htmp-2022-0040openalex-snapshot
A study on deep reinforcement learning-based crane scheduling model for uncertainty tasks
inferredcites →https://doi.org/10.15807/jorsj.49.188openalex-snapshot
A HEURISTIC SCHEDULING ALGORITHM FOR STEEL MAKING PROCESS WITH CRANE HANDLING( Advanced Planning and Scheduling for Supply Chain Management)
inferredcites →https://doi.org/10.3390/pr11092737openalex-snapshot
A Low-Carbon Scheduling Method of Flexible Manufacturing and Crane Transportation Considering Multi-State Collaborative Configuration Based on Hybrid Differential Evolution
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.