On the public citation graph

Dynamic multi-objective scheduling for the dual-resource constrained flexible job shop considering noise exposure and worker fatigue

https://doi.org/10.2139/ssrn.5957783
0 signed · 33 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1007/bf02023073openalex-snapshot
Routing and scheduling in a flexible job shop by tabu search
inferredcites →https://doi.org/10.1007/bf02238804openalex-snapshot
Job-shop scheduling with multi-purpose machines
inferredcites →https://doi.org/10.1007/s10696-022-09453-yopenalex-snapshot
Concurrent scheduling of jobs and AGVs in a flexible job shop system: a parallel hybrid PSO-GA meta-heuristic
inferredcites →https://doi.org/10.1007/s10845-017-1350-2openalex-snapshot
Review of job shop scheduling research and its new perspectives under Industry 4.0
inferredcites →https://doi.org/10.1007/s10845-020-01713-8openalex-snapshot
Research on flexible job-shop scheduling problem in green sustainable manufacturing based on learning effect
inferredcites →https://doi.org/10.1007/s10845-021-01859-zopenalex-snapshot
Correction to: An effective approach for the dual-resource flexible job shop scheduling problem considering loading and unloading
inferredcites →https://doi.org/10.1007/s10951-008-0090-8openalex-snapshot
A survey of dynamic scheduling in manufacturing systems
inferredcites →https://doi.org/10.1016/j.aei.2025.103282openalex-snapshot
Tackling dual-resource flexible job shop scheduling problem in the production line reconfiguration scenario: An efficient meta-heuristic with critical path-based neighborhood search
inferredcites →https://doi.org/10.1016/j.apm.2013.02.028openalex-snapshot
Incorporating human fatigue and recovery into the learning–forgetting process
inferredcites →https://doi.org/10.1016/j.autcon.2021.103657openalex-snapshot
Automated noise exposure assessment model for the health of construction workers
inferredcites →https://doi.org/10.1016/j.cie.2003.03.002openalex-snapshot
Human related issues in manufacturing cell design, implementation, and operation: a review and survey
inferredcites →https://doi.org/10.1016/j.cie.2008.07.021openalex-snapshot
An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem
inferredcites →https://doi.org/10.1016/j.cie.2017.02.008openalex-snapshot
A simulation-optimization based heuristic for the online assignment of multi-skilled workers subjected to fatigue in manufacturing systems
inferredcites →https://doi.org/10.1016/j.cie.2019.106064openalex-snapshot
Solving the flexible job shop scheduling problem using an improved Jaya algorithm
inferredcites →https://doi.org/10.1016/j.ejor.2011.03.004openalex-snapshot
Recent developments in Dual Resource Constrained (DRC) system research
inferredcites →https://doi.org/10.1016/j.ergon.2008.10.012openalex-snapshot
Comparison of rest allowance models for static muscular work
inferredcites →https://doi.org/10.1016/j.eswa.2020.113754openalex-snapshot
NSGA-II variants for solving a social-conscious dual resource-constrained scheduling problem
inferredcites →https://doi.org/10.1016/j.ins.2014.11.036openalex-snapshot
Mathematical modeling and multi-objective evolutionary algorithms applied to dynamic flexible job shop scheduling problems
inferredcites →https://doi.org/10.1016/j.ins.2016.08.046openalex-snapshot
A shuffled multi-swarm micro-migrating birds optimizer for a multi-resource-constrained flexible job shop scheduling problem
inferredcites →https://doi.org/10.1016/j.jmsy.2021.09.018openalex-snapshot
Real-time integrated production-scheduling and maintenance-planning in a flexible job shop with machine deterioration and condition-based maintenance
inferredcites →https://doi.org/10.1016/j.jmsy.2023.01.004openalex-snapshot
Flexible job shop scheduling problem under Industry 5.0: A survey on human reintegration, environmental consideration and resilience improvement
inferredcites →https://doi.org/10.1016/j.jmsy.2025.04.001openalex-snapshot
A Q-learning improved differential evolution algorithm for human-centric dynamic distributed flexible job shop scheduling problem
inferredcites →https://doi.org/10.1016/j.jpdc.2018.07.022openalex-snapshot
GPU based parallel genetic algorithm for solving an energy efficient dynamic flexible flow shop scheduling problem
inferredcites →https://doi.org/10.1049/cim2.12003openalex-snapshot
A survival duration‐guided NSGA‐III for sustainable flexible job shop scheduling problem considering dual resources
inferredcites →https://doi.org/10.1080/00140130050174518openalex-snapshot
Prospective validation of a low-back disorder risk model and assessment of ergonomic interventions associated with manual materials handling tasks
inferredcites →https://doi.org/10.1080/00207543.2013.793428openalex-snapshot
Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: a mathematical programming approach
inferredcites →https://doi.org/10.1080/00207543.2016.1170226openalex-snapshot
A knowledge-guided fruit fly optimization algorithm for dual resource constrained flexible job-shop scheduling problem
inferredcites →https://doi.org/10.1080/00207543.2021.1968526openalex-snapshot
Joint optimisation for dynamic flexible job-shop scheduling problem with transportation time and resource constraints
inferredcites →https://doi.org/10.1109/access.2025.3562754openalex-snapshot
Dual-Resource Optimization Configuration and Collaborative Scheduling for Flexible Job Shop Under Worker Flexibility Constraints
inferredcites →https://doi.org/10.1111/itor.12199openalex-snapshot
A research survey: review of flexible job shop scheduling techniques
inferredcites →https://doi.org/10.1186/s12889-021-11274-xopenalex-snapshot
Occupational noise exposure and the prevalence of dyslipidemia in a cross-sectional study
inferredcites →https://doi.org/10.14743/apem2023.3.472openalex-snapshot
An improved multi-objective Wild Horse optimization for the dual-resource-constrained flexible job shop scheduling problem: A comparative analysis with NSGA-II and a real case study
inferredcites →https://doi.org/10.3390/machines9060108openalex-snapshot
Dual Resource Constrained Flexible Job Shop Scheduling Based on Improved Quantum Genetic Algorithm
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.