On the public citation graph
Integration of Cost and Work Breakdown Structures in the Management of Construction Projects
0 signed · 197 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1007/s00163-017-0254-7openalex-snapshot
Criticality and propagation analysis of impacts between project deliverables
inferredcites →https://doi.org/10.1007/s12205-013-0617-1openalex-snapshot
A case study of time/cost analysis for aged-housing renovation using a pre-made BIM database structure
inferredcites →https://doi.org/10.1007/s12205-018-1924-3openalex-snapshot
Risk Information Management for Bridges by Integrating Risk Breakdown Structure into 3D/4D BIM
inferredcites →https://doi.org/10.1016/0263-7863(89)90035-5openalex-snapshot
Developing strategies and philosophies early for successful project implementation
inferredcites →https://doi.org/10.1016/j.autcon.2006.08.001openalex-snapshot
Assessing research issues in Automated Project Performance Control (APPC)
inferredcites →https://doi.org/10.1016/j.autcon.2008.09.004openalex-snapshot
Automating progress measurement of construction projects
inferredcites →https://doi.org/10.1016/j.autcon.2011.05.013openalex-snapshot
Using nD technology to develop an integrated construction management system for city rail transit construction
inferredcites →https://doi.org/10.1016/j.autcon.2012.11.020openalex-snapshot
Semi-automatic and specification-compliant cost estimation for tendering of building projects based on IFC data of design model
inferredcites →https://doi.org/10.1016/j.autcon.2013.10.020openalex-snapshot
BIM and ontology-based approach for building cost estimation
inferredcites →https://doi.org/10.1016/j.autcon.2016.01.007openalex-snapshot
Cost-based scheduling method using object-oriented approach
inferredcites →https://doi.org/10.1016/j.autcon.2017.01.021openalex-snapshot
WBS-based dynamic multi-dimensional BIM database for total construction as-built documentation
inferredcites →https://doi.org/10.1016/j.eswa.2009.01.032openalex-snapshot
Effect of project characteristics on project performance in construction projects based on structural equation model
inferredcites →https://doi.org/10.1016/j.ijpe.2012.05.025openalex-snapshot
Prioritization of enterprise resource planning systems criteria: Focusing on construction industry
inferredcites →https://doi.org/10.1016/j.ijproman.2005.06.001openalex-snapshot
Environmental factors and work performance of project managers in the construction industry
inferredcites →https://doi.org/10.1016/j.ijproman.2005.10.002openalex-snapshot
Project: The just necessary structure to reach your goals
inferredcites →https://doi.org/10.1016/j.ijproman.2012.01.008openalex-snapshot
Mathematical relationships between scoring parameters in capped tendering
inferredcites →https://doi.org/10.1016/j.ijproman.2013.02.006openalex-snapshot
Different stakeholder groups and their perceptions of project success
inferredcites →https://doi.org/10.1016/j.ijproman.2013.06.003openalex-snapshot
Examining the influence of participant performance factors on contractor satisfaction: A structural equation model
inferredcites →https://doi.org/10.1016/j.ijproman.2013.08.001openalex-snapshot
Project planning practices based on enterprise resource planning systems in small and medium enterprises — A case study from the Republic of Macedonia
inferredcites →https://doi.org/10.1016/j.ijproman.2015.11.001openalex-snapshot
Improving the estimation of probability of bidder participation in procurement auctions
inferredcites →https://doi.org/10.1016/j.orp.2015.02.001openalex-snapshot
Modeling bidding competitiveness and position performance in multi-attribute construction auctions
inferredcites →https://doi.org/10.1016/j.paid.2006.09.017openalex-snapshot
Understanding the limitations of global fit assessment in structural equation modeling
inferredcites →https://doi.org/10.1016/j.sbspro.2013.03.038openalex-snapshot
Managing Project Scope Definition to Improve Stakeholders’ Participation and Enhance Project Outcome
inferredcites →https://doi.org/10.1016/j.tranpol.2012.04.001openalex-snapshot
Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases
inferredcites →https://doi.org/10.1016/s0024-6301(01)00097-8openalex-snapshot
Project Success: A Multidimensional Strategic Concept
inferredcites →https://doi.org/10.1016/s0048-7333(98)00085-7openalex-snapshot
In search of project classification: a non-universal approach to project success factors
inferredcites →https://doi.org/10.1017/s0890060403172034openalex-snapshot
A feature ontology to support construction cost estimating
inferredcites →https://doi.org/10.1037/0033-2909.105.3.430openalex-snapshot
Evaluation of goodness-of-fit indices for structural equation models.
inferredcites →https://doi.org/10.1037/0033-2909.107.2.238openalex-snapshot
Comparative fit indexes in structural models.
inferredcites →https://doi.org/10.1037/0033-2909.88.3.588openalex-snapshot
Significance tests and goodness of fit in the analysis of covariance structures.
inferredcites →https://doi.org/10.1037/a0030767openalex-snapshot
On the relationship between coefficient alpha and composite reliability.
inferredcites →https://doi.org/10.1046/j.1365-232x.2001.00220.xopenalex-snapshot
Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling
inferredcites →https://doi.org/10.1051/matecconf/201815901019openalex-snapshot
Development of risk-based standardized WBS (Work Breakdown Structure) for quality planning of high rise building architectural works
inferredcites →https://doi.org/10.1051/matecconf/201815902029openalex-snapshot
Path planning for automatic guided vehicle with multiple target points in dynamic environment
inferredcites →https://doi.org/10.1057/palgrave.rm.8250004openalex-snapshot
Managing Project Risks Using a Cross Risk Breakdown Matrix
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1991)117:3(486)openalex-snapshot
Cost‐ and Schedule‐Control Integration: Issues and Needs
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1997)123:4(419)openalex-snapshot
Adaptability of Information Classification Systems for Civil Works
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2003)129:4(454)openalex-snapshot
Engineering Information Classification System
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2004)130:5(616)openalex-snapshot
Flexible Work Breakdown Structure for Integrated Cost and Schedule Control
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2006)132:1(67)openalex-snapshot
Use of a WBS Matrix to Improve Interface Management in Projects
inferredcites →https://doi.org/10.1061/(asce)1076-0431(2001)7:4(115)openalex-snapshot
Building Project Scope Definition Using Project Definition Rating Index
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000701openalex-snapshot
Selection of Third-Party Relationships in Construction
inferredcites →https://doi.org/10.1061/(asce)me.1943-5479.0000009openalex-snapshot
Integrated Schedule and Cost Model for Repetitive Construction Process
inferredcites →https://doi.org/10.1061/(asce)me.1943-5479.0000483openalex-snapshot
Infrastructure Project Scope Definition Using Project Definition Rating Index
inferredcites →https://doi.org/10.1061/9780784413616.080openalex-snapshot
INNOVance: Italian BIM Database for Construction Process Management
inferredcites →https://doi.org/10.1061/9780784479827.292openalex-snapshot
Perceptions of the Influence of Personal Demographic Factors on the Safety Performance of Field Employees
inferredcites →https://doi.org/10.1080/0144619042000326710openalex-snapshot
Delays and cost increases in the construction of private residential projects in Kuwait
inferredcites →https://doi.org/10.1080/01446193.2015.1064983openalex-snapshot
Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden
inferredcites →https://doi.org/10.1080/10429247.2017.1380579openalex-snapshot
Measuring Project Management Performance: Case of Construction Industry
inferredcites →https://doi.org/10.1080/10705519909540118openalex-snapshot
Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives
inferredcites →https://doi.org/10.1080/15411656.2007.10462262openalex-snapshot
The CEEC Code for Cost Planning: Introduction and Practical Application
inferredcites →https://doi.org/10.1088/1742-6596/1360/1/012005openalex-snapshot
Development of risk-based standardized work breakdown structure for quality planning of airport construction project
inferredcites →https://doi.org/10.1093/biomet/38.3-4.337openalex-snapshot
THE EFFECT OF STANDARDIZATION ON A χ 2 APPROXIMATION IN FACTOR ANALYSIS
inferredcites →https://doi.org/10.1108/02632770610666152openalex-snapshot
Integrating stakeholders during community FM's early project phases
inferredcites →https://doi.org/10.1108/08858621211188920openalex-snapshot
Supplier relationship management in the construction industry: the effects of trust and dependence
inferredcites →https://doi.org/10.1108/09600030810866977openalex-snapshot
Cost modeling in logistics using time‐driven ABC
inferredcites →https://doi.org/10.1108/09699980310502946openalex-snapshot
Testing Herzberg’s two‐factor theory in the Thai construction industry
inferredcites →https://doi.org/10.1108/13552510210430017openalex-snapshot
Development of a generic framework for collecting whole life cost data for the building industry
inferredcites →https://doi.org/10.1108/14714170910995930openalex-snapshot
Framework for a generic work breakdown structure for building projects
inferredcites →https://doi.org/10.1108/17538371111164010openalex-snapshot
Looking again at current practice in project management
inferredcites →https://doi.org/10.1108/sasbe-11-2017-0060openalex-snapshot
Overview: the opportunity of BIM in railway
inferredcites →https://doi.org/10.1109/icise.2009.713openalex-snapshot
Life Cycle Cost Integrative Management in Construction Engineering
inferredcites →https://doi.org/10.1109/iscram.2011.6184109openalex-snapshot
Research on WBS-based risk identification and the countermeasures for real estate projects' entire course
inferredcites →https://doi.org/10.1109/tic-sth.2009.5444463openalex-snapshot
Goal based project scope determination approach
inferredcites →https://doi.org/10.1111/j.1467-6486.1990.tb00249.xopenalex-snapshot
PLANNING AND TACTICAL FACTORS IN THE PROJECT IMPLEMENTATION PROCESS
inferredcites →https://doi.org/10.1139/l07-094openalex-snapshot
Integrated cost and schedule control in the Korean construction industry based on a modified work-packaging model
inferredcites →https://doi.org/10.1177/001316446502500201openalex-snapshot
Alpha Coefficients for Stratified-Parallel Tests
inferredcites →https://doi.org/10.1177/002224378101800104openalex-snapshot
Evaluating Structural Equation Models with Unobservable Variables and Measurement Error
inferredcites →https://doi.org/10.1177/1063293x03011001005openalex-snapshot
A Work Breakdown Structure that Integrates Different Views in Aircraft Modification Projects
inferredcites →https://doi.org/10.1177/875697289802900403openalex-snapshot
Effective Sizing and Content Definition of Work Packages
inferredcites →https://doi.org/10.1177/875697289903000405openalex-snapshot
The Logical Framework Method for Defining Project Success
inferredcites →https://doi.org/10.1201/9781420011111openalex-snapshot
Handbook of Univariate and Multivariate Data Analysis and Interpretation with SPSS
inferredcites →https://doi.org/10.1201/b17396-54openalex-snapshot
Information consistency on construction – Case study of correlation between classification systems for construction types
inferredcites →https://doi.org/10.14419/ijet.v7i3.10.15651openalex-snapshot
Analysis Cost Overruns, Delays and Risk Involved in Construction Management Using Primavera
inferredcites →https://doi.org/10.14424/ijcscm801018-19-42openalex-snapshot
Retrospective look on front-end planning in the construction industry: Aliterature review of 30 years of research
inferredcites →https://doi.org/10.18757/ejtir.2010.10.1.2864openalex-snapshot
Cost Overruns in Large-scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness
inferredcites →https://doi.org/10.2139/ssrn.485443openalex-snapshot
Time-Driven Activity-Based Costing
inferredcites →https://doi.org/10.21427/d7cf7ropenalex-snapshot
Structural Equation Modelling: Guidelines for Determining Model Fit
inferredcites →https://doi.org/10.22260/isarc2003/0095openalex-snapshot
Report of the NIST Workshop on Data Exchange Standards at the Construction Job Site
inferredcites →https://doi.org/10.22260/isarc2011/0103openalex-snapshot
Estimating with BIM: A Survey of US Construction Companies
inferredcites →https://doi.org/10.22260/isarc2014/0038openalex-snapshot
BIM-Based Integrated Framework for Detailed Cost Estimation and Schedule Planning of Construction Projects
inferredcites →https://doi.org/10.2307/270723openalex-snapshot
Asymptotic Confidence Intervals for Indirect Effects in Structural Equation Models
inferredcites →https://doi.org/10.2307/270754openalex-snapshot
Assessing Reliability and Stability in Panel Models
inferredcites →https://doi.org/10.2307/3151714openalex-snapshot
Recent Developments in Structural Equation Modeling
inferredcites →https://doi.org/10.3233/ifs-141178openalex-snapshot
Study on BIM-based construction project cost and schedule risk early warning
inferredcites →https://doi.org/10.3390/app10020654openalex-snapshot
Forecasting the Project Duration Average and Standard Deviation from Deterministic Schedule Information
inferredcites →https://doi.org/10.3390/app9245324openalex-snapshot
Filtering of Irrelevant Clashes Detected by BIM Software Using a Hybrid Method of Rule-Based Reasoning and Supervised Machine Learning
inferredcites →https://doi.org/10.3390/buildings5041265openalex-snapshot
Evaluating the Alignment of Organizational and Project Contexts for BIM Adoption: A Case Study of a Large Owner Organization
inferredcites →https://doi.org/10.3390/buildings9060147openalex-snapshot
An Exploration of Synergies between Lean Concepts and BIM in FM: A Review and Directions for Future Research
inferredcites →https://doi.org/10.3390/buildings9090191openalex-snapshot
Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK
inferredcites →https://doi.org/10.3390/su10072469openalex-snapshot
Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractors’ Schedule-Cost Performance for Offshore Oil and Gas EPC Projects
inferredcites →https://doi.org/10.3846/13923730.2014.914096openalex-snapshot
ESTIMATING FUTURE BIDDING PERFORMANCE OF COMPETITOR BIDDERS IN CAPPED TENDERS
inferredcites →https://doi.org/10.3846/13923730.2014.992467openalex-snapshot
COST OVERRUN IN CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES, GAS-OIL INDUSTRY OF IRAN AS A CASE STUDY
inferredcites →https://doi.org/10.3846/isarc.20080626.688openalex-snapshot
A study of preproject planning and project success using ANN and regression models
inferredcites →https://doi.org/10.3963/jmpm.v4i1.173openalex-snapshot
Identifying the Criteria Used for Establishing Work Package Size for Project WBS
inferredcites →https://doi.org/10.3989/ic.16.121openalex-snapshot
Aproximación a la gestión económica integral de las obras por procesos productivos: elaboración del modelo COP de control de costes de construcción
inferredcites →https://doi.org/10.4314/ijest.v2i9.63862openalex-snapshot
Implementation of critical success factors in construction research and development process
inferredcites →https://doi.org/10.4324/9781315259369openalex-snapshot
Contracting for Engineering and Construction Projects
inferredcites →https://doi.org/10.5120/4601-6803openalex-snapshot
Schedule Risk Analysis of ICT Infrastructure Projects
inferredcites →https://doi.org/10.5130/ajceb.v14i3.4155openalex-snapshot
Prioritising Project Scope Definition Elements in Public Building Projects
inferredcites →https://doi.org/10.5281/zenodo.1060708openalex-snapshot
Development Of A Support Tool For Cost And Schedule Integration Managment At Program Level
inferredcites →https://doi.org/10.5281/zenodo.1314615openalex-snapshot
Bim Application And Construction Schedule Simulation For The Horizontal Work Area
inferredcites →https://doi.org/10.5281/zenodo.258942openalex-snapshot
Risk Management In Construction Industry
inferredcites →https://doi.org/10.5345/jkic.2008.8.5.127openalex-snapshot
A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing
inferredcites →https://doi.org/10.5539/emr.v1n2p72openalex-snapshot
Cost Calculation of Building Structures and Building Works in Polish Conditions
inferredcites →https://doi.org/10.5539/ijbm.v13n8p184openalex-snapshot
Understanding Relationship between Milestone and Decision-Making in Project Management: A Qualitative Study among Project Managers in Saudi Arabia
inferredcites →https://doi.org/10.5762/kais.2017.18.11.770openalex-snapshot
A Study on Applying Information Framework for BIM Based WBS -Focusing on Civil Construction-
inferredcites →https://doi.org/10.5860/choice.34-1636openalex-snapshot
A Guide to the project management body of knowledge
inferredcites →https://doi.org/10.6036/mn7943openalex-snapshot
INFLUENCIA DE LA GESTIÓN DEL ALCANCE EN LOS PROYECTOS DEL SECTOR DE LA CONSTRUCCIÓN
inferredcites →https://doi.org/10.9708/jksci.2019.24.02.127openalex-snapshot
A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering
What points at this work
Incoming claims: where this work appears in other papers’ reference lists and arguments.
inferred← citeshttps://doi.org/10.2139/ssrn.4640386openalex-extracted
Economic Analysis of Offsite and Onsite 3d Construction Printing Techniques: A Comparative Value Stream Assessment
inferred← citeshttps://doi.org/10.1007/978-3-031-61503-0_27openalex-snapshot
Developing a Work Package Approach for Construction Robotics
inferred← citeshttps://doi.org/10.1007/978-3-031-76572-8_3openalex-snapshot
Use of AI Methods in Software Project Scheduling
inferred← citeshttps://doi.org/10.1007/978-981-16-3844-2_59openalex-snapshot
4D and 5D Design Processes Automation Using Databases, Classification and Applied Programming
inferred← citeshttps://doi.org/10.1007/978-981-95-8872-5_41openalex-snapshot
Semantic Integration of Cost, Time, Resource, and Geometry for Data-Driven Construction Management: An Interactive Dashboard for Decision Support
inferred← citeshttps://doi.org/10.1007/s00521-020-05006-2openalex-snapshot
Forecasting tunnel geology, construction time and costs using machine learning methods
inferred← citeshttps://doi.org/10.1016/j.actaastro.2025.09.086openalex-snapshot
Building an EMPIRE: Instantiating logically consistent system models using ontological architecture and process frameworks
inferred← citeshttps://doi.org/10.1016/j.autcon.2023.105183openalex-snapshot
Transformer language model for mapping construction schedule activities to uniformat categories
inferred← citeshttps://doi.org/10.1016/j.autcon.2025.106426openalex-snapshot
Automated machine learning pipeline for robust project cost and duration forecasting
inferred← citeshttps://doi.org/10.1016/j.cie.2024.110116openalex-snapshot
Dynamic selection of risk response strategies with resource allocation for construction project portfolios
inferred← citeshttps://doi.org/10.1016/j.jestch.2025.102159openalex-snapshot
Transparent and reliable construction cost prediction using advanced machine learning and explainable AI
inferred← citeshttps://doi.org/10.1016/j.jii.2023.100519openalex-snapshot
The evolution of ontology in AEC: A two-decade synthesis, application domains, and future directions
inferred← citeshttps://doi.org/10.1016/j.jobe.2023.105911openalex-snapshot
Analysis of classification systems for the built environment: Historical perspective, comprehensive review and discussion
inferred← citeshttps://doi.org/10.1038/s41598-023-50486-6openalex-snapshot
Automated quantity take-off in a Norwegian road project
inferred← citeshttps://doi.org/10.1038/s41598-026-44904-8openalex-snapshot
Uncertainty aware and explainable construction cost prediction using a hybrid probabilistic learning model
inferred← citeshttps://doi.org/10.1061/(asce)cp.1943-5487.0001046openalex-snapshot
Unified Breakdown Structure for Information Integration to Enhance Interoperability in the Built Environment
inferred← citeshttps://doi.org/10.1061/9780784483893.089openalex-snapshot
Unified Breakdown Structures for Standard Information Exchange in Building and Plant Industry: Variables for Theory and Implementation
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-12730openalex-snapshot
Automatic Classification of Construction Work Codes in Bill of Quantities of National Roadway Based on Text Analysis
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-14590openalex-snapshot
Reframing Sustainability Rating Systems to Emphasize Interconnected Benefits Increases Sustainable Design Practices among Engineers
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-15856openalex-snapshot
A Hybrid and Intuitive Work Packaging Approach with Multiple Task Relations, General Work Package Precedence, and BIM in Modular Construction
inferred← citeshttps://doi.org/10.1061/jladah.ladr-1172openalex-snapshot
Enhancing Construction Claims Resolution Efficiency: A Systematic Review of the UAVs Applications in Construction Claim Management
inferred← citeshttps://doi.org/10.1063/5.0169643openalex-snapshot
Influence of BIM on work breakdown structure in the construction industry
inferred← citeshttps://doi.org/10.1063/5.0254530openalex-snapshot
Conceptual framework of green retrofitting guided by GBCI and PUPR ministerial regulation number 21 of 2021 at high-rise office building based on WBS and BIM-5D to increase accuracy of cost estimation
inferred← citeshttps://doi.org/10.1080/09613218.2025.2593269openalex-snapshot
Integrating work breakdown structure and social network analysis for stakeholder coordination in European building permitting
inferred← citeshttps://doi.org/10.1080/13467581.2022.2085718openalex-snapshot
Contractor-led design risk management in international large project: Korean contractor’s perspective
inferred← citeshttps://doi.org/10.1080/15623599.2023.2267845openalex-snapshot
Contribution mechanisms of project managers’ behavioural competencies towards the success of oil and gas projects
inferred← citeshttps://doi.org/10.1108/ecam-03-2020-0203openalex-snapshot
Requirement management in a life cycle perspective based on ISO 19650-1 and CoClass as the new classification system in Sweden
inferred← citeshttps://doi.org/10.1108/ijppm-02-2024-0135openalex-snapshot
Multilateral analysis of stakeholder integration, project complexity and project performance on information technology (IT) projects
inferred← citeshttps://doi.org/10.1108/sasbe-01-2026-0071openalex-snapshot
Developing a smart construction supply chain payment management system: an action design research
inferred← citeshttps://doi.org/10.1109/access.2020.3018169openalex-snapshot
Measuring the Impact of Scope Changes on Project Plan Using EVM
inferred← citeshttps://doi.org/10.1109/icteca60133.2023.10490658openalex-snapshot
Integrate WBS and Forecast Task Completion in Construction Projects using Data Analytics
inferred← citeshttps://doi.org/10.1109/sustech67720.2026.11536452openalex-snapshot
A Structured Checkpoint Framework for Early Integration and Validation of Schedule and Cost Baselines in Construction Planning
inferred← citeshttps://doi.org/10.1117/12.3023969openalex-snapshot
Coding structure of digital highway model and implementation of automatic encoding based on rule engine
inferred← citeshttps://doi.org/10.1145/3468013.3468304openalex-snapshot
Identification of E-Maintenance Dominant Factor that Affect Maintenance Performance of High Rise Buildings
inferred← citeshttps://doi.org/10.1145/3787223openalex-snapshot
An Experimental Analysis of Machine Learning Algorithms and Necessity of Classification System for Semantic Segmentation of Point Clouds for Heritage Buildings
inferred← citeshttps://doi.org/10.1155/2022/9623385openalex-snapshot
WBS-Based Method in Teaching Management Information Project
inferred← citeshttps://doi.org/10.1155/adce/7915818openalex-snapshot
Assessment of Factors Causing Construction Delays in Building Construction Projects in Somaliland
inferred← citeshttps://doi.org/10.11606/t.9.2023.tde-11072023-101813openalex-snapshot
Isolation and identification of bacteriocin-producing probiotic lactic acid bacteria from the rainbow trout (>i /i<): activity against >i /i<
inferred← citeshttps://doi.org/10.15446/dyna.v90n228.108642openalex-snapshot
Performance management in construction projects: a systematic literature review
inferred← citeshttps://doi.org/10.1590/s1678-86212021000200517openalex-snapshot
Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
inferred← citeshttps://doi.org/10.2139/ssrn.6192139openalex-snapshot
Developing a Digital Construction Supply Chain Payment Management System- An Action Design Research
inferred← citeshttps://doi.org/10.21638/spbu18.2020.404openalex-snapshot
The impact of limited rationality on the creation and management of complex infrastructure projects: The cases of Heathrow and Berlin- Brandenburg airports
inferred← citeshttps://doi.org/10.24940/theijbm/2021/v9/i5/bm2105-056openalex-snapshot
Funding and Implementation of Constituency Development Fund Projects in Kinangop Constituency in Nyandarua County, Kenya
inferred← citeshttps://doi.org/10.24940/theijbm/2021/v9/i6/bm2106-008openalex-snapshot
Stakeholder Involvement and Performance of Projects at the Kenya Revenue Authority
inferred← citeshttps://doi.org/10.2991/ijcis.d.200828.002openalex-snapshot
A Novel Particle Swarm Optimization Approach to Support Decision-Making in the Multi-Round of an Auction by Game Theory
inferred← citeshttps://doi.org/10.3130/aijt.28.986openalex-snapshot
ANALYSIS OF THE POSSIBILITY OF TABLE-TO-TABLE LINKAGE IN THE CREATION OF WBS USING A FACETED CLASSIFICATION SYSTEMS
inferred← citeshttps://doi.org/10.33564/ijeast.2023.v07i09.010openalex-snapshot
ACTIVITIES OF RAILWAY INFRASTRUCTURE WORK IN SEQUENCE BY USING WORK BREAK DOWN STRUCTURE
inferred← citeshttps://doi.org/10.3390/admsci16010031openalex-snapshot
A Hybrid Agile-Quality Management Framework for Enhancing Productivity in a Public Academic Research Laboratory: A Case Study
inferred← citeshttps://doi.org/10.3390/app10217913openalex-snapshot
Proposal and Application of a Methodology to Improve the Control and Monitoring of Complex Hydroelectric Power Station Construction Projects
inferred← citeshttps://doi.org/10.3390/app131810191openalex-snapshot
A Multi-Story Expandable Systematic Hierarchical Construction Information Classification System for Implementing Information Processing in Highway Construction
inferred← citeshttps://doi.org/10.3390/app16115640openalex-snapshot
Coding and Relationships Between Construction and Maintenance Work Units and Their Life Cycle: A Study of the Economic, Environmental and Social Sustainability of Housing in Andalusia
inferred← citeshttps://doi.org/10.3390/buildings11050184openalex-snapshot
The Relationship between Building Agents in the Context of Integrated Project Management: A Prospective Analysis
inferred← citeshttps://doi.org/10.3390/buildings12050656openalex-snapshot
Comparative Study of Construction Information Classification Systems: CCI versus Uniclass 2015
inferred← citeshttps://doi.org/10.3390/buildings12122191openalex-snapshot
Risk Response Strategies Selection over the Life Cycle of Project Portfolio
inferred← citeshttps://doi.org/10.3390/buildings13030664openalex-snapshot
Use of BIM as a Support for Tendering of Facility Management Services
inferred← citeshttps://doi.org/10.3390/buildings13051206openalex-snapshot
Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management
inferred← citeshttps://doi.org/10.3390/buildings14041119openalex-snapshot
A Work Breakdown Structure for Estimating Building Life Cycle Cost Aligned with Sustainable Assessment—Application to Functional Costs
inferred← citeshttps://doi.org/10.3390/buildings15152684openalex-snapshot
Platform Approaches in the AEC Industry: Stakeholder Perspectives and Case Study
inferred← citeshttps://doi.org/10.3390/buildings16010203openalex-snapshot
Current Possibilities of Using BIM Models for Compiling Cost Estimates in the Design Phase of Residential Buildings
inferred← citeshttps://doi.org/10.3390/engproc2025084074openalex-snapshot
The Risk of Implementing Green Retrofitting in High-Rise Buildings Based on Work Breakdown Structures to Improve Quality of Resource Planning and Cost Accuracy
inferred← citeshttps://doi.org/10.3390/su14159711openalex-snapshot
The Influence of Knowledge on Managing Risk for the Success in Complex Construction Projects: The IPMA Approach
inferred← citeshttps://doi.org/10.35631/jistm.1143004openalex-snapshot
A CONCEPTUAL INTEGRATION OF 5D BIM AND BIG DATA ANALYTICS FOR ENHANCED PROJECT COST MANAGEMENT
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.02openalex-snapshot
Ecossistemas de negócios e cluster: Uma revisão da literatura
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.03openalex-snapshot
Capacidade de absorção do conhecimento dos agentes de microcrédito no processo de acompanhamento de seus clientes
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.04openalex-snapshot
Business Management and Economic Viability: enhance applied in the Civil Construction
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.05openalex-snapshot
Análise dos pacotes de benefícios oferecidos aos trabalhadores da cidade de São José dos Campos
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.08openalex-snapshot
Fator humano nas paradas ou projetos
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.09openalex-snapshot
A relevância do Modelo Organizacional para o sucesso estratégico do empreendimento: Um estudo de caso sobre Shopping Center
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.11openalex-snapshot
Estruturação de Programa de Ergonomia em empresa do setor elétrico
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.12openalex-snapshot
Imagem da marca, qualidade percebida, satisfação do consumidor e risco percebido como preditores da lealdade do consumidor
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.13openalex-snapshot
Análise do comportamento do consumidor de feiras orgânicas ecológicas
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.15openalex-snapshot
Economia circular e descarte consciente de medicamentos pós-uso, Cuiabá – 2019
inferred← citeshttps://doi.org/10.36229/978-65-5866-042-2.cap.17openalex-snapshot
Medidas para reduzir impactos da poluição originados do consumo de energia no setor industrial do Estado de Alagoas
inferred← citeshttps://doi.org/10.36253/10.36253/979-12-215-0289-3.56openalex-snapshot
Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process
inferred← citeshttps://doi.org/10.36680/j.itcon.2022.005openalex-snapshot
Construction safety ontology development and alignment with industry foundation classes (IFC)
inferred← citeshttps://doi.org/10.36680/j.itcon.2025.031openalex-snapshot
RealCONs: A Digital Framework for Construction Reporting Accuracy and Early Delay Detection
inferred← citeshttps://doi.org/10.3724/sp.j.1249.2022.04424openalex-snapshot
Coding structure of highway engineering information model
inferred← citeshttps://doi.org/10.37547/tajmei/volume07issue08-08openalex-snapshot
Features Of Implementing a Work Breakdown Structure in Multidisciplinary Projects
inferred← citeshttps://doi.org/10.38140/as.v31i2.8196openalex-snapshot
SME contractors’ management practices to achieve sustainable business performance in the Eastern Cape province, South Africa
inferred← citeshttps://doi.org/10.47670/wuwijar202371amhkaopenalex-snapshot
Improving Project Budgeting Systems by Developing Machine Learning Models
inferred← citeshttps://doi.org/10.48084/etasr.7023openalex-snapshot
Assessing the Influence of Various Work Breakdown Structures on Project Completion Time
inferred← citeshttps://doi.org/10.56726/irjmets46092openalex-snapshot
PLANNING AND SCHEDULING OF MULTISTORIED BUILDING CONSTRUCTION BY PROJECT MANAGEMENT TOOL PRIMAVERA P6
inferred← citeshttps://doi.org/10.61194/ijss.v7i3.2516openalex-snapshot
Stakeholder Participation Analysis in the Development of Work Breakdown Structure (WBS): A Qualitative Analysis of Health Project Management Practices
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.