On the public citation graph

An Entropy-Based Adaptive Hybrid Particle Swarm Optimization for Disassembly Line Balancing Problems

0 signed · 72 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1007/978-94-007-3010-6_143openalex-snapshot
A Simulated Annealing Algorithm for Balancing a Disassembly Line
inferredcites →https://doi.org/10.1007/s00170-005-0037-6openalex-snapshot
Ant colony optimization for disassembly sequencing with multiple objectives
inferredcites →https://doi.org/10.1007/s00170-009-2303-5openalex-snapshot
A new multi-objective ant colony algorithm for solving the disassembly line balancing problem
inferredcites →https://doi.org/10.1007/s00170-013-4990-1openalex-snapshot
A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem
inferredcites →https://doi.org/10.1007/s10479-014-1641-3openalex-snapshot
A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
inferredcites →https://doi.org/10.1016/j.cie.2013.03.014openalex-snapshot
Multi-objective optimization of stochastic disassembly line balancing with station paralleling
inferredcites →https://doi.org/10.1016/j.ejor.2005.03.055openalex-snapshot
A balancing method and genetic algorithm for disassembly line balancing
inferredcites →https://doi.org/10.1016/j.eswa.2013.06.067openalex-snapshot
Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem
inferredcites →https://doi.org/10.1016/j.ifacol.2016.07.893openalex-snapshot
Resource Constrained Disassembly Line Balancing Problem
inferredcites →https://doi.org/10.1016/j.ins.2012.04.028openalex-snapshot
A dynamic neighborhood learning based particle swarm optimizer for global numerical optimization
inferredcites →https://doi.org/10.1016/j.ins.2014.02.084openalex-snapshot
A multi-population harmony search algorithm with external archive for dynamic optimization problems
inferredcites →https://doi.org/10.1080/00207540210135622openalex-snapshot
Disassembly line in product recovery
inferredcites →https://doi.org/10.1080/00207540601137207openalex-snapshot
Profit-oriented disassembly-line balancing
inferredcites →https://doi.org/10.1080/00207543.2013.795251openalex-snapshot
Mixed model disassembly line balancing problem with fuzzy goals
inferredcites →https://doi.org/10.1108/17410381311318909openalex-snapshot
Ant colony optimization for sequence‐dependent disassembly line balancing problem
inferredcites →https://doi.org/10.1108/jmtm-11-2013-0168openalex-snapshot
A variable neighbourhood search algorithm for disassembly lines
inferredcites →https://doi.org/10.1109/4235.996017openalex-snapshot
A fast and elitist multiobjective genetic algorithm: NSGA-II
inferredcites →https://doi.org/10.1109/icmtma.2011.18openalex-snapshot
A Discrete Particle Swarm Optimization Algorithm for Assembly Line Balancing Problem of Type 1
inferredcites →https://doi.org/10.1109/tevc.2004.826067openalex-snapshot
Handling multiple objectives with particle swarm optimization
inferredcites →https://doi.org/10.1109/tevc.2004.826069openalex-snapshot
A Cooperative Approach to Particle Swarm Optimization
inferredcites →https://doi.org/10.1117/12.629121openalex-snapshot
Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem
inferredcites →https://doi.org/10.1145/1068009.1068047openalex-snapshot
An effective use of crowding distance in multiobjective particle swarm optimization
inferredcites →https://doi.org/10.1145/1143997.1144177openalex-snapshot
Non-wrapping order crossover
inferredcites →https://doi.org/10.1145/2908961.2931636openalex-snapshot
Feature Selection using Genetic Algorithm
inferredcites →https://doi.org/10.3233/ifs-130875openalex-snapshot
Fuzzy mathematical programming approaches for reverse supply chain optimization with disassembly line balancing problem
inferredcites →https://doi.org/10.3390/e15041247openalex-snapshot
A Hybrid Chaos-Particle Swarm Optimization Algorithm for the Vehicle Routing Problem with Time Window

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4654487openalex-extracted
A Grey Wolf Optimization Algorithm for Solving Paritial Destructive Disassembly Line Balancing Problem Consider Feasibility Evaluation and Noise Pollution
inferred← citeshttps://doi.org/10.1002/9781119681984.ch5openalex-snapshot
A Swarm Robot for Harvesting a Paddy Field
inferred← citeshttps://doi.org/10.1007/s10479-022-04910-1openalex-snapshot
A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time
inferred← citeshttps://doi.org/10.1007/s10845-019-01519-3openalex-snapshot
On the end-of-life state oriented multi-objective disassembly line balancing problem
inferred← citeshttps://doi.org/10.1007/s11081-019-09465-yopenalex-snapshot
Type-E disassembly line balancing problem with multi-manned workstations
inferred← citeshttps://doi.org/10.1007/s11081-021-09696-yopenalex-snapshot
Models and two-phase bee algorithms for multi-objective U-shaped disassembly line balancing problem
inferred← citeshttps://doi.org/10.1016/j.aei.2024.102418openalex-snapshot
A grey wolf optimization algorithm for solving partial destructive disassembly line balancing problem consider feasibility evaluation and noise pollution
inferred← citeshttps://doi.org/10.1016/j.asoc.2024.111415openalex-snapshot
Ensemble artificial bee colony algorithm with Q-learning for scheduling Bi-objective disassembly line
inferred← citeshttps://doi.org/10.1016/j.cie.2019.106056openalex-snapshot
Iterated local search method and mathematical model for sequence-dependent U-shaped disassembly line balancing problem
inferred← citeshttps://doi.org/10.1016/j.cie.2026.112391openalex-snapshot
Dismantling sequence planning of end-of-life products considering parts recovery strategies
inferred← citeshttps://doi.org/10.1016/j.clscn.2023.100129openalex-snapshot
Line balancing problem with multi-manned workstations and resource constraints: The case of electronics waste disassembly
inferred← citeshttps://doi.org/10.1016/j.cor.2020.105064openalex-snapshot
Balancing of two-sided disassembly lines: Problem definition, MILP model and genetic algorithm approach
inferred← citeshttps://doi.org/10.1016/j.cor.2020.105111openalex-snapshot
Constraint programming approaches to disassembly line balancing problem with sequencing decisions
inferred← citeshttps://doi.org/10.1016/j.cor.2022.105915openalex-snapshot
A novel constraint programming and simulated annealing for disassembly line balancing problem with AND/OR precedence and sequence dependent setup times
inferred← citeshttps://doi.org/10.1016/j.ejor.2018.12.035openalex-snapshot
Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations
inferred← citeshttps://doi.org/10.1016/j.eswa.2021.115431openalex-snapshot
Modelling and solving profit-oriented U-shaped partial disassembly line balancing problem
inferred← citeshttps://doi.org/10.1016/j.eswa.2022.118046openalex-snapshot
Disassembly sequence planning and application using simplified discrete gravitational search algorithm for equipment maintenance in hydropower station
inferred← citeshttps://doi.org/10.1016/j.jclepro.2019.03.188openalex-snapshot
An extended review on disassembly line balancing with bibliometric & social network and future study realization analysis
inferred← citeshttps://doi.org/10.1016/j.jclepro.2019.117826openalex-snapshot
Disassembly line balancing with sequencing decisions: A mixed integer linear programming model and extensions
inferred← citeshttps://doi.org/10.1016/j.jclepro.2020.125418openalex-snapshot
Minimizing energy consumption in multi-objective two-sided disassembly line balancing problem with complex execution constraints using dual-individual simulated annealing algorithm
inferred← citeshttps://doi.org/10.1016/j.jclepro.2025.144695openalex-snapshot
Multi-man–robot collaborative disassembly line balancing optimization via mixed-integer programming and genetic Jaya algorithm
inferred← citeshttps://doi.org/10.1016/j.jii.2022.100387openalex-snapshot
Energy-efficient open-shop scheduling with multiple automated guided vehicles and deteriorating jobs
inferred← citeshttps://doi.org/10.1016/j.jii.2026.101156openalex-snapshot
Exact formulation and two-stage optimization method for the Type-E human-robot cooperative partial disassembly line balancing problem
inferred← citeshttps://doi.org/10.1016/j.jmsy.2020.06.006openalex-snapshot
Evolutionary optimization using epsilon method for resource-constrained multi-robotic disassembly line balancing
inferred← citeshttps://doi.org/10.1016/j.jmsy.2020.06.013openalex-snapshot
Multi-objective partial parallel disassembly line balancing problem using hybrid group neighbourhood search algorithm
inferred← citeshttps://doi.org/10.1016/j.jmsy.2022.12.002openalex-snapshot
Multimanned partial disassembly line balancing optimization considering end-of-life states of products and skill differences of workers
inferred← citeshttps://doi.org/10.1016/j.jmsy.2025.02.004openalex-snapshot
Energy-efficient human-robot collaborative U-shaped disassembly line balancing problem considering turn on-off strategy: Uncertain modeling and solution method
inferred← citeshttps://doi.org/10.1016/j.rcim.2024.102816openalex-snapshot
Green and efficient-oriented human-robot hybrid partial destructive disassembly line balancing problem from non-disassemblability of components and noise pollution
inferred← citeshttps://doi.org/10.1016/j.rcim.2025.103094openalex-snapshot
Enhancing remanufacturing efficiency: a genetic teaching-learning-based optimisation algorithm for human-robot shared-workstation disassembly line balancing problem
inferred← citeshttps://doi.org/10.1016/j.swevo.2020.100719openalex-snapshot
A survey on meta-heuristics for solving disassembly line balancing, planning and scheduling problems in remanufacturing
inferred← citeshttps://doi.org/10.1080/00207543.2018.1428775openalex-snapshot
Disassembly line balancing problem: a review of the state of the art and future directions
inferred← citeshttps://doi.org/10.1080/00207543.2019.1630774openalex-snapshot
A fast branch, bound and remember algorithm for disassembly line balancing problem
inferred← citeshttps://doi.org/10.1080/00207543.2021.1897178openalex-snapshot
Improved whale optimisation algorithm for two-sided disassembly line balancing problems considering part characteristic indexes
inferred← citeshttps://doi.org/10.1080/00207543.2022.2069059openalex-snapshot
Improved social spider algorithm for partial disassembly line balancing problem considering the energy consumption involved in tool switching
inferred← citeshttps://doi.org/10.1080/2326263x.2021.1966985openalex-snapshot
Optimizing channel selection using multi-objective FODPSO for BCI applications
inferred← citeshttps://doi.org/10.1109/iccsi55536.2022.9970700openalex-snapshot
Hybrid Disassembly Lines Considering Employee Training Targets and An Improved Multi-neighborhood Tabu Search Algorithm
inferred← citeshttps://doi.org/10.1109/tii.2022.3231922openalex-snapshot
Disassembly Sequence Planning of Product Structure With an Improved QICA Considering Expert Consensus for Remanufacturing
inferred← citeshttps://doi.org/10.1111/itor.13220openalex-snapshot
A multi‐objective hybrid evolutionary search algorithm for parallel production line balancing problem including disassembly and assembly tasks
inferred← citeshttps://doi.org/10.17093/alphanumeric.891406openalex-snapshot
Disassembly Line Balancing by Using Simulation Optimization
inferred← citeshttps://doi.org/10.23919/icac50006.2021.9594072openalex-snapshot
Review of The Optimization Algorithms for Remanufacturing Disassembly Line
inferred← citeshttps://doi.org/10.24012/dumf.1366117openalex-snapshot
Logaritmik İşlem Süreleri Toplamı Tabanlı Öğrenme ve İş Bozulması Etkileri Altında Demontaj Hattı Problemi
inferred← citeshttps://doi.org/10.2514/6.2026-5123openalex-snapshot
A Comparative Study of Lattice-Boltzmann Methods for Supersonic Flow Simulations
inferred← citeshttps://doi.org/10.28948/ngumuh.975730openalex-snapshot
Balancing Disassembly Line Under Hazardous Parts with Precise and Fuzzy Goals
inferred← citeshttps://doi.org/10.3390/electronics11040533openalex-snapshot
Disassembly Line Balancing of Electronic Waste Considering the Degree of Task Correlation
inferred← citeshttps://doi.org/10.3390/s23031652openalex-snapshot
A Novel Simulated Annealing-Based Hyper-Heuristic Algorithm for Stochastic Parallel Disassembly Line Balancing in Smart Remanufacturing
inferred← citeshttps://doi.org/10.70675/e44af9c2z488fz49b3za7a5z670d44f616e5openalex-snapshot
Effective models and methods for stochastic disassembly line problems
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.