On the public citation graph

Automated Crane Planning and Optimization for modular construction

0 signed · 118 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1016/j.autcon.2010.11.006openalex-snapshot
An algorithm for the calculation of feasible mobile crane position areas
inferredcites →https://doi.org/10.1016/j.autcon.2011.11.006openalex-snapshot
A fast path planning method for single and dual crane erections
inferredcites →https://doi.org/10.1016/j.autcon.2012.11.042openalex-snapshot
A methodology for mobile crane lift path checking in heavy industrial projects
inferredcites →https://doi.org/10.1016/j.autcon.2014.03.007openalex-snapshot
Lift path planning for a nonholonomic crawler crane
inferredcites →https://doi.org/10.1016/j.autcon.2014.03.015openalex-snapshot
Evolution of the crane selection and on-site utilization process for modular construction multilifts
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1993)119:3(498)openalex-snapshot
Computer‐Aided Planning for Heavy Lifts
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1995)121:1(1)openalex-snapshot
Routing Large Vehicles on Industrial Construction Sites
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1996)122:4(354)openalex-snapshot
Multiple Heavy Lifts Optimization
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1999)125:2(115)openalex-snapshot
Location Optimization for a Group of Tower Cranes
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2002)128:3(265)openalex-snapshot
Adaptive Probabilistic Neural Network-based Crane Type Selection System
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2005)131:5(579)openalex-snapshot
Optimization Algorithm for Selection and on Site Location of Mobile Cranes
inferredcites →https://doi.org/10.1061/(asce)0887-3801(2003)17:3(197)openalex-snapshot
Automated Path Planning of Cooperative Crane Lifts Using Heuristic Search
inferredcites →https://doi.org/10.1061/(asce)0887-3801(2005)19:2(182)openalex-snapshot
Collision Free Path Planning of Cooperative Crane Manipulators Using Genetic Algorithm
inferredcites →https://doi.org/10.1061/(asce)0887-3801(2008)22:1(21)openalex-snapshot
Simulation-Based Identification of Possible Locations for Mobile Cranes on Construction Sites
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000929openalex-snapshot
Algorithm for Mobile Crane Walking Path Planning in Congested Industrial Plants
inferredcites →https://doi.org/10.1061/(asce)cp.1943-5487.0000065openalex-snapshot
Algorithm of Crane Selection for Heavy Lifts
inferredcites →https://doi.org/10.1061/(asce)cp.1943-5487.0000181openalex-snapshot
Multiagent Approach for Real-Time Collision Avoidance and Path Replanning for Cranes
inferredcites →https://doi.org/10.1061/41020(339)129openalex-snapshot
Integrated Simulation-Based Scheduling for Module Assembly Yard
inferredcites →https://doi.org/10.1061/41109(373)35openalex-snapshot
Simulation-Based Multiple Heavy Lift Planning in Industrial Construction
inferredcites →https://doi.org/10.1061/9780784412343.0056openalex-snapshot
3D-Modeling for Crane Selection and Logistics for Modular Construction On-Site Assembly
inferredcites →https://doi.org/10.1061/9780784486115openalex-snapshot
Computing in Civil Engineering 2024
inferredcites →https://doi.org/10.1080/01446190010008079openalex-snapshot
IntelliCranes: an integrated crane type and model selection system
inferredcites →https://doi.org/10.1080/01446199000000015openalex-snapshot
Expert systems for crane selection
inferredcites →https://doi.org/10.1108/14714170110814532openalex-snapshot
An algorithm for mobile crane selection and location on construction sites
inferredcites →https://doi.org/10.1109/tase.2017.2723539openalex-snapshot
Nonlinear Antiswing Control for Crane Systems With Double-Pendulum Swing Effects and Uncertain Parameters: Design and Experiments
inferredcites →https://doi.org/10.1109/tii.2017.2754540openalex-snapshot
Nonlinear Motion Control of Underactuated Three-Dimensional Boom Cranes With Hardware Experiments
inferredcites →https://doi.org/10.1111/0885-9507.00005openalex-snapshot
Automated Path Planning for Mobile Crane Lifts
inferredcites →https://doi.org/10.1111/0885-9507.00044openalex-snapshot
A Heavy Lift Planning System for Crane Lifts
inferredcites →https://doi.org/10.1139/cjce-2014-0313openalex-snapshot
From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies
inferredcites →https://doi.org/10.14288/1.0076356openalex-snapshot
A rapid lift study generation system for heavy industrial projects
inferredcites →https://doi.org/10.2307/2583667openalex-snapshot
Introduction to Algorithms

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4678044openalex-extracted
An Automated Approach to Enhance Safety and Practicality of Lift Plan in Modular Constructions
inferred← citeshttps://doi.org/10.1007/978-981-19-1029-6_8openalex-snapshot
An Automated Approach to Generating Optimized Crane Mat Layout Plans
inferred← citeshttps://doi.org/10.1007/978-981-19-1029-6_9openalex-snapshot
An Automated Mobile Crane Selection System for Heavy Industrial Construction Projects
inferred← citeshttps://doi.org/10.1007/s42524-019-0059-7openalex-snapshot
Risks of modular integrated construction: A review and future research directions
inferred← citeshttps://doi.org/10.1016/j.aei.2021.101346openalex-snapshot
Automation and optimization in crane lift planning: A critical review
inferred← citeshttps://doi.org/10.1016/j.aei.2023.101885openalex-snapshot
Integrated mathematical optimisation approach for the tower crane hook routing problem to satisfy material demand requests on-site
inferred← citeshttps://doi.org/10.1016/j.aei.2024.102509openalex-snapshot
Developing a fast and accurate collision detection strategy for crane-lift path planning in high-rise modular integrated construction
inferred← citeshttps://doi.org/10.1016/j.aei.2025.103778openalex-snapshot
Leveraging linked data for space constraints checking of mobile cranes in modular construction assembly lookahead planning
inferred← citeshttps://doi.org/10.1016/j.aei.2026.104493openalex-snapshot
Multi-objective optimization of tower crane layout planning in modular integrated construction: An interactive and interpretable platform
inferred← citeshttps://doi.org/10.1016/j.aei.2026.104624openalex-snapshot
Two-stage 3D lift path planning method for mobile cranes in industrial modular projects
inferred← citeshttps://doi.org/10.1016/j.aei.2026.105157openalex-snapshot
Adaptive graph sequencing for crane lift planning in modular construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2019.03.015openalex-snapshot
Auction-based Simulation for Industrial Crane Operations
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103083openalex-snapshot
Automated rigging design for heavy industrial lifts
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103175openalex-snapshot
Evaluating industrial modularization strategies: Local vs. overseas fabrication
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103253openalex-snapshot
Crane operation planning in overlapping areas through dynamic supply selection
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103259openalex-snapshot
Mixed integer programming for dynamic tower crane and storage area optimization on construction sites
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103271openalex-snapshot
Lift planning and optimization in construction: A thirty-year review
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103305openalex-snapshot
Multi crane lift simulation using Building Information Modeling
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103447openalex-snapshot
An A-Star algorithm for semi-optimization of crane location and configuration in modular construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103466openalex-snapshot
Crane operations and planning in modular integrated construction: Mixed review of literature
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103508openalex-snapshot
Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103513openalex-snapshot
Integrating discrete event simulation and genetic algorithm optimization for bridge maintenance planning
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103520openalex-snapshot
A system boundary-based critical review on crane selection in building construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2021.103695openalex-snapshot
A practicality and safety-oriented approach for path planning in crane lifts
inferred← citeshttps://doi.org/10.1016/j.autcon.2021.103766openalex-snapshot
BIM-based 4D mobile crane simulation and onsite operation management
inferred← citeshttps://doi.org/10.1016/j.autcon.2021.103843openalex-snapshot
Nonlinear antiswing control for offshore boom cranes subject to ship roll and heave disturbances
inferred← citeshttps://doi.org/10.1016/j.autcon.2021.103854openalex-snapshot
Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2022.104372openalex-snapshot
Online trajectory planning for three-dimensional offshore boom cranes
inferred← citeshttps://doi.org/10.1016/j.autcon.2022.104434openalex-snapshot
Crane-lift path planning for high-rise modular integrated construction through metaheuristic optimization and virtual prototyping
inferred← citeshttps://doi.org/10.1016/j.autcon.2022.104455openalex-snapshot
Planning and coordination of modular construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2023.105034openalex-snapshot
Real-time trajectory planning for asphalt compaction operator support
inferred← citeshttps://doi.org/10.1016/j.autcon.2024.105731openalex-snapshot
Automated safety and practicality enhancement of lift plans in modular construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2025.106107openalex-snapshot
Optimized crane mat design and transit path planning using a graph search algorithm
inferred← citeshttps://doi.org/10.1016/j.cacaie.2026.100243openalex-snapshot
Construction-state-driven virtual trial assembly of large steel structures with temperature-window identification
inferred← citeshttps://doi.org/10.1016/j.eswa.2021.116053openalex-snapshot
An integrated decision support system for mobile crane selection
inferred← citeshttps://doi.org/10.1016/j.jclepro.2021.127503openalex-snapshot
Modelling in off-site construction supply chain management: A review and future directions for sustainable modular integrated construction
inferred← citeshttps://doi.org/10.1016/j.jobe.2021.102265openalex-snapshot
A systematic review of emerging technologies in industrialized construction
inferred← citeshttps://doi.org/10.1016/j.jobe.2021.102849openalex-snapshot
Design for manufacture and assembly: A case study for a prefabricated bathroom wet wall panel
inferred← citeshttps://doi.org/10.1016/j.jobe.2021.103720openalex-snapshot
Automating the modular construction process: A review of digital technologies and future directions with blockchain technology
inferred← citeshttps://doi.org/10.1016/j.net.2023.07.023openalex-snapshot
WITHDRAWN: Modular reactors: What can we learn from modular industrial plants and off site construction research
inferred← citeshttps://doi.org/10.1016/j.net.2023.09.029openalex-snapshot
Modular reactors: What can we learn from modular industrial plants and off site construction research
inferred← citeshttps://doi.org/10.1016/j.renene.2025.122528openalex-snapshot
Dynamic analysis of lowering operations during floating offshore wind turbine assembly mating
inferred← citeshttps://doi.org/10.1016/j.tsep.2024.102954openalex-snapshot
Application of low energy building thermal energy optimization based on image recognition and light sensors in urban green environment planning
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0001883openalex-snapshot
4D-Based Workspace Conflict Detection in Prefabricated Building Constructions
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0001909openalex-snapshot
Process-Oriented Framework to Improve Modular and Offsite Construction Manufacturing Performance
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0001922openalex-snapshot
Application of Last Planner System to Modular Offshore Wind Construction
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0002033openalex-snapshot
Optimized Mobile Crane Path Planning in Discretized Polar Space
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0002157openalex-snapshot
Optimizing Heavy Lift Plans for Industrial Construction Sites Using Dijkstra’s Algorithm
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0002177openalex-snapshot
Evaluating Mobile Crane Lift Operations Using an Interactive Virtual Reality System
inferred← citeshttps://doi.org/10.1061/9780784482438.048openalex-snapshot
Game Simulation to Support Construction Automation in Modular Construction Using BIM and Robotics Technology—Stage I
inferred← citeshttps://doi.org/10.1061/9780784482865.004openalex-snapshot
Demand-Dependent Inventory Management System for an Offsite Construction Facility
inferred← citeshttps://doi.org/10.1061/9780784482889.085openalex-snapshot
Toward Automated Virtual Assembly for Prefabricated Construction: Construction Sequencing through Simulated BIM
inferred← citeshttps://doi.org/10.1061/9780784486993.115openalex-snapshot
Systematic Review of Literature on Safety Risks in Off-Site Construction
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-12891openalex-snapshot
Crane Mat Layout Optimization Based on Agent-Based Greedy and Reinforcement-Learning Approach
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-12955openalex-snapshot
Collaborative Planning for Stacking and Installation of Prefabricated Building Components Regarding Crane-Collision Avoidance
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-13109openalex-snapshot
Planning of Mobile Crane Walking Operations in Congested Industrial Construction Sites
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-14567openalex-snapshot
Transportation-Induced Impact on a Prefinished Volumetric Modular House Using Trailer Bogie: Case Study
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-15866openalex-snapshot
Verifiable Safety Path Planning: Utilizing Planar Analysis for Improved Lifting Operations
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-17744openalex-snapshot
Safety Performance Evaluation Model for Off-Site Construction through the Integration of Key Leading and Lagging Factors
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-18233openalex-snapshot
A Multitower Crane Layout Planning Framework for Modular Integrated Construction Considering Material Relay Handling
inferred← citeshttps://doi.org/10.1080/10286608.2026.2738127openalex-snapshot
Towards human-centric construction automation: an SA-STAMP framework for safe human–autonomy teaming
inferred← citeshttps://doi.org/10.1108/ci-04-2021-0070openalex-snapshot
Best practices for implementing industrialized construction projects: lessons from nine case studies
inferred← citeshttps://doi.org/10.1108/ci-04-2023-0075openalex-snapshot
Uncertainties affecting the offsite construction supply chain resilience: a systematic literature review
inferred← citeshttps://doi.org/10.1108/ci-12-2025-0562openalex-snapshot
A performance-based safety evaluation model for workers’ compensation decision support in offsite construction
inferred← citeshttps://doi.org/10.1108/ecam-05-2024-0676openalex-snapshot
Advanced construction site layout planning for prefabricated projects: an application of the new algorithm
inferred← citeshttps://doi.org/10.1108/ecam-07-2021-0630openalex-snapshot
Computing the severities of critical onsite assembly risk factors for modular integrated construction projects
inferred← citeshttps://doi.org/10.1108/ecam-07-2021-0668openalex-snapshot
An overall review of research on prefabricated construction supply chain management
inferred← citeshttps://doi.org/10.1108/ecam-07-2023-0740openalex-snapshot
Influence of policies on stakeholders to drive the success of modular integrated construction in Hong Kong
inferred← citeshttps://doi.org/10.1109/access.2021.3092422openalex-snapshot
Research on the Hoisting Motor Drive System’s Active Disturbance Rejection Control and Energy Consumption for a Crane
inferred← citeshttps://doi.org/10.1139/cjce-2019-0825openalex-snapshot
4D-based automation of heavy lift planning in industrial construction projects
inferred← citeshttps://doi.org/10.12677/airr.2020.92016openalex-snapshot
An Unmanned Intelligent Hoisting System Architecture
inferred← citeshttps://doi.org/10.17760/d20350265openalex-snapshot
LA multifamily housing : obstacles to the adoption of off-site construction as a method of increasing production
inferred← citeshttps://doi.org/10.18273/revuin.v21n3-2022009openalex-snapshot
Modelado numérico del proceso de izado de un cabezal hemisférico de un regenerador
inferred← citeshttps://doi.org/10.2139/ssrn.7471124openalex-snapshot
Integrated Station and Sequence Planning for Mobile Construction 3D Printers
inferred← citeshttps://doi.org/10.24928/2023/0255openalex-snapshot
Comparison of Takt Planning Methods Used on Projects of Different Types
inferred← citeshttps://doi.org/10.3233/atde210039openalex-snapshot
Factory Manufactured Modular Construction of Process Plants
inferred← citeshttps://doi.org/10.32971/als.2020.003openalex-snapshot
Planning of Material Handling : Literature Review
inferred← citeshttps://doi.org/10.3389/fbuil.2024.1419899openalex-snapshot
Exploring the barriers and enablers of industrial solutions in renovation projects: a mixed-methods study in the finnish AEC industry
inferred← citeshttps://doi.org/10.3390/app13020685openalex-snapshot
State-of-the-Art on Technological Developments and Adaptability of Prefabricated Industrial Steel Buildings
inferred← citeshttps://doi.org/10.3390/app9183842openalex-snapshot
Impact of Wind on the Movement of the Load Carried by Rotary Crane
inferred← citeshttps://doi.org/10.3390/buildings10050085openalex-snapshot
Investigating U.S. Industry Practitioners’ Perspectives towards the Adoption of Emerging Technologies in Industrialized Construction
inferred← citeshttps://doi.org/10.3390/buildings12010053openalex-snapshot
Additive Manufacturing in Off-Site Construction: Review and Future Directions
inferred← citeshttps://doi.org/10.3390/buildings12070960openalex-snapshot
A Predictive Analytics Framework for Mobile Crane Configuration Selection in Heavy Industrial Construction Projects
inferred← citeshttps://doi.org/10.3390/buildings12101499openalex-snapshot
Requirements Analysis for Development of Off-Site Construction Project Management System: Focusing on Precast Concrete Construction
inferred← citeshttps://doi.org/10.3390/buildings14072238openalex-snapshot
Building Digital Twins to Overcome Digitalization Barriers for Automating Construction Site Management
inferred← citeshttps://doi.org/10.3390/su12218996openalex-snapshot
Critical Factors Influencing the Sustainable Construction Capability in Prefabrication of Chinese Construction Enterprises
inferred← citeshttps://doi.org/10.48550/arxiv.2003.06695openalex-snapshot
Toward Automated Virtual Assembly for Prefabricated Construction: Construction Sequencing through Simulated BIM
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.