On the public citation graph
Auction-based Simulation for Industrial Crane Operations
0 signed · 67 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1002/9780470058411openalex-snapshot
Developing Multi‐Agent Systems with JADE
inferredcites →https://doi.org/10.1016/j.autcon.2014.06.001openalex-snapshot
Automating motion trajectory Of crane-lifted loads
inferredcites →https://doi.org/10.1016/j.autcon.2018.07.009openalex-snapshot
Automated Crane Planning and Optimization for modular construction
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1993)119:3(498)openalex-snapshot
Computer‐Aided Planning for Heavy Lifts
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1995)121:1(1)openalex-snapshot
Routing Large Vehicles on Industrial Construction Sites
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1996)122:4(298)openalex-snapshot
Culture of Using Mobile Cranes for Building Construction
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1996)122:4(354)openalex-snapshot
Multiple Heavy Lifts Optimization
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2001)127:4(315)openalex-snapshot
Genetic Algorithm for Optimizing Supply Locations around Tower Crane
inferredcites →https://doi.org/10.1061/(asce)0733-950x(2002)128:3(126)openalex-snapshot
Simulation Study of Container Terminal Performance
inferredcites →https://doi.org/10.1061/(asce)0887-3801(2003)17:3(197)openalex-snapshot
Automated Path Planning of Cooperative Crane Lifts Using Heuristic Search
inferredcites →https://doi.org/10.1061/(asce)0887-3801(2008)22:1(21)openalex-snapshot
Simulation-Based Identification of Possible Locations for Mobile Cranes on Construction Sites
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000399openalex-snapshot
Simulation-Based Auction Protocol for Resource Scheduling Problems
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000929openalex-snapshot
Algorithm for Mobile Crane Walking Path Planning in Congested Industrial Plants
inferredcites →https://doi.org/10.1061/(asce)cp.1943-5487.0000666openalex-snapshot
Near-Real-Time Optimization of Overlapping Tower Crane Operations: A Model and Case Study
inferredcites →https://doi.org/10.1061/40513(279)129openalex-snapshot
A Computer-Aided Heavy Lift Planning Model
inferredcites →https://doi.org/10.1080/0144619032000049665openalex-snapshot
GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction
inferredcites →https://doi.org/10.1108/ci-11-2016-0062openalex-snapshot
Crane overlap and operational flexibility: balancing utilization, duration, and safety
inferredcites →https://doi.org/10.1109/cca.2004.1387465openalex-snapshot
Proceedings of the 2004 IEEE International Conference on Control Applications
inferredcites →https://doi.org/10.1109/cca.2004.1387483openalex-snapshot
Optimization model and simulation-based solution for a class of crane scheduling problems
inferredcites →https://doi.org/10.1111/0885-9507.00005openalex-snapshot
Automated Path Planning for Mobile Crane Lifts
inferredcites →https://doi.org/10.1111/0885-9507.00044openalex-snapshot
A Heavy Lift Planning System for Crane Lifts
inferredcites →https://doi.org/10.1139/cjce-2013-0192openalex-snapshot
Analysis of rigging assembly for lifting heavy industrial modules
inferredcites →https://doi.org/10.1139/cjce-2014-0313openalex-snapshot
From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies
inferredcites →https://doi.org/10.5860/choice.46-5662openalex-snapshot
Multiagent systems: algorithmic, game-theoretic, and logical foundations
What points at this work
Incoming claims: where this work appears in other papers’ reference lists and arguments.
inferred← citeshttps://doi.org/10.2139/ssrn.4678044openalex-extracted
An Automated Approach to Enhance Safety and Practicality of Lift Plan in Modular Constructions
inferred← citeshttps://doi.org/10.2139/ssrn.4684036openalex-extracted
Simulation-Based Planning of Earthmoving Equipment to Reduce Greenhouse Gas (Ghg) Emissions
inferred← citeshttps://doi.org/10.2139/ssrn.4691648openalex-extracted
Schedule Information Modeling for Forensic Analysis and Assessment of Time Extension Claims
inferred← citeshttps://doi.org/10.1007/s41693-022-00074-3openalex-snapshot
An innovative crane-lift path planning system for high-rise modular integrated construction
inferred← citeshttps://doi.org/10.1016/j.aei.2021.101346openalex-snapshot
Automation and optimization in crane lift planning: A critical review
inferred← citeshttps://doi.org/10.1016/j.aei.2025.104220openalex-snapshot
Simulation-based approaches for construction resource management: methods, challenges, and future directions
inferred← citeshttps://doi.org/10.1016/j.aei.2026.104624openalex-snapshot
Two-stage 3D lift path planning method for mobile cranes in industrial modular projects
inferred← citeshttps://doi.org/10.1016/j.aei.2026.105157openalex-snapshot
Adaptive graph sequencing for crane lift planning in modular construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103083openalex-snapshot
Automated rigging design for heavy industrial lifts
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103175openalex-snapshot
Evaluating industrial modularization strategies: Local vs. overseas fabrication
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103253openalex-snapshot
Crane operation planning in overlapping areas through dynamic supply selection
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103271openalex-snapshot
Lift planning and optimization in construction: A thirty-year review
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103305openalex-snapshot
Multi crane lift simulation using Building Information Modeling
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103447openalex-snapshot
An A-Star algorithm for semi-optimization of crane location and configuration in modular construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103466openalex-snapshot
Crane operations and planning in modular integrated construction: Mixed review of literature
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103508openalex-snapshot
Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103513openalex-snapshot
Integrating discrete event simulation and genetic algorithm optimization for bridge maintenance planning
inferred← citeshttps://doi.org/10.1016/j.autcon.2020.103520openalex-snapshot
A system boundary-based critical review on crane selection in building construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2021.103766openalex-snapshot
BIM-based 4D mobile crane simulation and onsite operation management
inferred← citeshttps://doi.org/10.1016/j.autcon.2022.104434openalex-snapshot
Crane-lift path planning for high-rise modular integrated construction through metaheuristic optimization and virtual prototyping
inferred← citeshttps://doi.org/10.1016/j.autcon.2023.104960openalex-snapshot
Technologies, levels and directions of crane-lift automation in construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2023.105208openalex-snapshot
Optimized variable resource allocation framework for scheduling of fast-track industrial construction projects
inferred← citeshttps://doi.org/10.1016/j.autcon.2024.105625openalex-snapshot
A science mapping lens on discrete event simulation applications in construction engineering and management
inferred← citeshttps://doi.org/10.1016/j.autcon.2024.105731openalex-snapshot
Automated safety and practicality enhancement of lift plans in modular construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2024.105841openalex-snapshot
Simulation-based planning of earthmoving equipment for reducing greenhouse gas (GHG) emissions
inferred← citeshttps://doi.org/10.1016/j.ejor.2020.10.029openalex-snapshot
The traveling salesman puts-on a hard hat – Tower crane scheduling in construction projects
inferred← citeshttps://doi.org/10.1016/j.ssci.2020.105002openalex-snapshot
A systematic review of scholarly works addressing crane safety requirements
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0002033openalex-snapshot
Optimized Mobile Crane Path Planning in Discretized Polar Space
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0002157openalex-snapshot
Optimizing Heavy Lift Plans for Industrial Construction Sites Using Dijkstra’s Algorithm
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0002177openalex-snapshot
Evaluating Mobile Crane Lift Operations Using an Interactive Virtual Reality System
inferred← citeshttps://doi.org/10.1061/9780784482889.036openalex-snapshot
Virtual Reality Supported Site Layout Planning for Modular Integrated Construction of High-Rise Buildings
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-15866openalex-snapshot
Verifiable Safety Path Planning: Utilizing Planar Analysis for Improved Lifting Operations
inferred← citeshttps://doi.org/10.1061/jladah.ladr-1239openalex-snapshot
Schedule Information Modeling for Forensic Analysis and Assessment of Time Claims
inferred← citeshttps://doi.org/10.1063/5.0117766openalex-snapshot
Design improvement of tensioner bolt of driving system rubber tyred gantry crane
inferred← citeshttps://doi.org/10.1088/1742-6596/2800/1/012025openalex-snapshot
Closed-loop Control System Design of Wind Rope Hoisting of Transmission Tower
inferred← citeshttps://doi.org/10.1088/1757-899x/1098/6/062078openalex-snapshot
Design variations optimization of jib crane 24500 N using I beam 300
inferred← citeshttps://doi.org/10.1109/tase.2021.3062979openalex-snapshot
A Hybrid Iterated Greedy Algorithm for a Crane Transportation Flexible Job Shop Problem
inferred← citeshttps://doi.org/10.1109/wsc52266.2021.9715359openalex-snapshot
Enhanced Resource Scheduling Framework For Industrial Construction Projects
inferred← citeshttps://doi.org/10.2139/ssrn.5464617openalex-snapshot
Lean construction management: optimal tower crane scheduling for the transportation and assembly of prefabricated components in prefabricated buildings
inferred← citeshttps://doi.org/10.29173/ijic236openalex-snapshot
Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case
inferred← citeshttps://doi.org/10.3390/su132413551openalex-snapshot
Simulation-Optimization for the Planning of Off-Site Construction Projects: A Comparative Study of Recent Swarm Intelligence Metaheuristics
inferred← citeshttps://doi.org/10.3846/jcem.2026.27814openalex-snapshot
Critical risk factors for mobile crane safety in hong kong via a mixed-methods study
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.