On the public citation graph

Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs

https://doi.org/10.1016/j.jclepro.2019.119393
0 signed · 85 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1007/s00170-015-7657-2openalex-snapshot
Unrelated parallel machine scheduling problem with energy and tardiness cost
inferredcites →https://doi.org/10.1007/s11740-018-0840-1openalex-snapshot
Scheduling two interfering job sets on parallel machines under peak power constraint
inferredcites →https://doi.org/10.1016/j.asoc.2017.01.044openalex-snapshot
Bi-criteria ant colony optimization algorithm for minimizing makespan and energy consumption on parallel batch machines
inferredcites →https://doi.org/10.1016/j.cie.2012.10.002openalex-snapshot
Parallel-machine scheduling to minimize tardiness penalty and power cost
inferredcites →https://doi.org/10.1016/j.cor.2018.04.009openalex-snapshot
A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost
inferredcites →https://doi.org/10.1016/j.ejor.2015.07.017openalex-snapshot
Energy-efficient scheduling in manufacturing companies: A review and research framework
inferredcites →https://doi.org/10.1016/j.ejor.2016.09.007openalex-snapshot
Approximation schemes for parallel machine scheduling with non-renewable resources
inferredcites →https://doi.org/10.1016/j.jclepro.2017.04.018openalex-snapshot
Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs
inferredcites →https://doi.org/10.1016/j.jclepro.2018.05.056openalex-snapshot
Bi-objective identical parallel machine scheduling to minimize total energy consumption and makespan
inferredcites →https://doi.org/10.1016/j.jclepro.2018.10.048openalex-snapshot
Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing
inferredcites →https://doi.org/10.1016/j.jclepro.2019.01.166openalex-snapshot
Bi-objective green scheduling in uniform parallel machine environments
inferredcites →https://doi.org/10.1016/j.omega.2018.01.001openalex-snapshot
A memetic differential evolution algorithm for energy-efficient parallel machine scheduling
inferredcites →https://doi.org/10.1080/01605682.2019.1595190openalex-snapshot
Green parallel machines scheduling problem: A bi-objective model and a heuristic algorithm to obtain Pareto frontier
inferredcites →https://doi.org/10.1080/0305215x.2017.1296437openalex-snapshot
Bi-objective scheduling on uniform parallel machines considering electricity cost
inferredcites →https://doi.org/10.1109/ieem.2017.8289958openalex-snapshot
A genetic algorithm for unrelated parallel machine scheduling minimizing makespan cost and electricity cost under time-of-use (TOU) tariffs with job delay mechanism
inferredcites →https://doi.org/10.1109/ieem15053.2009openalex-snapshot
2009 IEEE International Conference on Industrial Engineering and Engineering Management
inferredcites →https://doi.org/10.1109/tase.2015.2495328openalex-snapshot
Parallel Machine Scheduling Under Time-of-Use Electricity Prices: New Models and Optimization Approaches
inferredcites →https://doi.org/10.1109/tase.2016.2631491openalex-snapshot
An Improved Model for Parallel Machine Scheduling Under Time-of-Use Electricity Price
inferredcites →https://doi.org/10.1155/2015/907034openalex-snapshot
An Ant Optimization Model for Unrelated Parallel Machine Scheduling with Energy Consumption and Total Tardiness
inferredcites →https://doi.org/10.1155/2018/5914360openalex-snapshot
A New Imperialist Competitive Algorithm for Multiobjective Low Carbon Parallel Machines Scheduling
inferredcites →https://doi.org/10.1155/2629openalex-snapshot
Mathematical Problems in Engineering

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4641833openalex-extracted
inferred← citeshttps://doi.org/10.1002/er.6999openalex-snapshot
Comparative analysis of the impact of energy‐aware scheduling, renewable energy generation, and battery energy storage on production scheduling
inferred← citeshttps://doi.org/10.1007/978-3-030-89743-7_13openalex-snapshot
Unrelated Parallel Machine Scheduling Problem Subject to Inventory Limitations and Resource Constraints
inferred← citeshttps://doi.org/10.1007/978-3-031-09173-5_105openalex-snapshot
Intelligent Valid Inequalities for No-Wait Permutation Flowshop Scheduling Problems
inferred← citeshttps://doi.org/10.1007/978-3-031-34020-8_18openalex-snapshot
Interactive Job Scheduling with Partially Known Personnel Availabilities
inferred← citeshttps://doi.org/10.1007/978-3-031-38145-4_12openalex-snapshot
Energy-Efficient Production Scheduling: Insides from Academia and Practice
inferred← citeshttps://doi.org/10.1007/978-3-032-21477-5_18openalex-snapshot
Learning to Predict User Replies in Interactive Job Scheduling
inferred← citeshttps://doi.org/10.1007/s00170-025-17327-4openalex-snapshot
A data-driven multi-objective scheduling method for multi-delivery parallel manufacturing under complex demand
inferred← citeshttps://doi.org/10.1007/s00170-026-18988-5openalex-snapshot
Cost-efficient job shop scheduling under strict deadline constraints: a hybrid seed-injected evolutionary search approach
inferred← citeshttps://doi.org/10.1007/s10626-023-00379-7openalex-snapshot
A multi-objective approach for manufacturing systems with multiple production routes based on supervisory control theory and heuristic algorithms
inferred← citeshttps://doi.org/10.1007/s10878-025-01367-3openalex-snapshot
A comparative computational study for parallel-machine problems with sustainable manufacturing constraints
inferred← citeshttps://doi.org/10.1007/s11081-026-10084-7openalex-snapshot
Green unrelated parallel machine scheduling problem under availability and energy constraints: a bi-objective approach
inferred← citeshttps://doi.org/10.1007/s13369-021-06114-4openalex-snapshot
An NSGA-II-Based Memetic Algorithm for an Energy-Efficient Unrelated Parallel Machine Scheduling Problem with Machine-Sequence Dependent Setup Times and Learning Effect
inferred← citeshttps://doi.org/10.1007/s40313-021-00837-3openalex-snapshot
Product Sequencing and Blending of Raw Materials to Feed Arc Furnaces: A Decision Support System for a Mining-Metallurgical Industry
inferred← citeshttps://doi.org/10.1007/s40747-021-00601-9openalex-snapshot
Decomposition approaches for parallel machine scheduling of step-deteriorating jobs to minimize total tardiness and energy consumption
inferred← citeshttps://doi.org/10.1007/s40747-024-01677-9openalex-snapshot
Automated generation of dispatching rules for the green unrelated machines scheduling problem
inferred← citeshttps://doi.org/10.1016/j.apenergy.2024.123385openalex-snapshot
Optimisation for operational decision-making in a watershed system with interconnected dams
inferred← citeshttps://doi.org/10.1016/j.apenergy.2026.127953openalex-snapshot
Demand charge determination for managing peak demand in energy-aware production scheduling
inferred← citeshttps://doi.org/10.1016/j.cie.2021.107456openalex-snapshot
Energy-aware decision support models in production environments: A systematic literature review
inferred← citeshttps://doi.org/10.1016/j.cie.2024.110004openalex-snapshot
A self-learning multi-population evolutionary algorithm for flexible job shop scheduling under time-of-use pricing
inferred← citeshttps://doi.org/10.1016/j.cie.2025.111580openalex-snapshot
A simheuristic approach to optimize energy consumption in the single-machine scheduling problem with stochastic processing times
inferred← citeshttps://doi.org/10.1016/j.cor.2024.106648openalex-snapshot
Scheduling jobs using queries to interactively learn human availability times
inferred← citeshttps://doi.org/10.1016/j.cor.2026.107440openalex-snapshot
Exact algorithms for energy-constrained scheduling on identical parallel machines
inferred← citeshttps://doi.org/10.1016/j.cor.2026.107492openalex-snapshot
A modified adaptive large neighborhood search algorithm for solving network-shared manufacturing resource scheduling
inferred← citeshttps://doi.org/10.1016/j.cor.2026.107567openalex-snapshot
A stochastic bi-objective unrelated parallel machine scheduling under time-of-use tariffs
inferred← citeshttps://doi.org/10.1016/j.cor.2026.107663openalex-snapshot
Multi-product batch scheduling for cement mills under time-of-use electricity tariffs
inferred← citeshttps://doi.org/10.1016/j.ejco.2022.100052openalex-snapshot
Unrelated parallel machine energy-efficient scheduling considering sequence-dependent setup times and time-of-use electricity tariffs
inferred← citeshttps://doi.org/10.1016/j.ejor.2023.01.029openalex-snapshot
Job scheduling under Time-of-Use energy tariffs for sustainable manufacturing: a survey
inferred← citeshttps://doi.org/10.1016/j.engappai.2025.111771openalex-snapshot
Knowledge-enhanced multi-objective memetic algorithm for energy-efficient flexible job shop scheduling with limited multi-load automated guided vehicles
inferred← citeshttps://doi.org/10.1016/j.eswa.2021.114754openalex-snapshot
Energy-cost-aware resource-constrained project scheduling for complex product system with activity splitting and recombining
inferred← citeshttps://doi.org/10.1016/j.eswa.2025.127340openalex-snapshot
EFJSP-IBDR: Energy-efficient flexible job shop scheduling under incentive-based demand response via graph reinforcement learning with dual attention mechanism
inferred← citeshttps://doi.org/10.1016/j.eswa.2025.129048openalex-snapshot
Multi-objective optimization of energy-efficient dynamic distributed job shop by multi-agent expected deep Q-network
inferred← citeshttps://doi.org/10.1016/j.ijpe.2023.109102openalex-snapshot
A deep reinforcement learning based algorithm for a distributed precast concrete production scheduling
inferred← citeshttps://doi.org/10.1016/j.jclepro.2021.129440openalex-snapshot
Hierarchical framework for maintenance and production scheduling of continuous ball mills in tile industries under TOU electricity pricing
inferred← citeshttps://doi.org/10.1016/j.jclepro.2022.133851openalex-snapshot
Energy-efficient scheduling for an energy-intensive industry under punitive electricity price
inferred← citeshttps://doi.org/10.1016/j.jclepro.2023.137844openalex-snapshot
A two-step scheduling and rescheduling framework for integrated production and usage-based maintenance planning under TOU electricity tariffs: A case study of the tile industry
inferred← citeshttps://doi.org/10.1016/j.jclepro.2025.146335openalex-snapshot
Optimizing energy consumption in stochastic production systems: Using a simulation-based approach for stopping policy
inferred← citeshttps://doi.org/10.1016/j.jmsy.2020.09.004openalex-snapshot
An energy-aware scheduling algorithm under maximum power consumption constraints
inferred← citeshttps://doi.org/10.1016/j.rser.2024.114797openalex-snapshot
A comprehensive overview of industrial demand response status in Europe
inferred← citeshttps://doi.org/10.1016/j.suscom.2023.100900openalex-snapshot
Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus
inferred← citeshttps://doi.org/10.1016/j.susoc.2022.01.002openalex-snapshot
A green model for identical parallel machines scheduling problem considering tardy jobs and job splitting property
inferred← citeshttps://doi.org/10.1016/j.swevo.2022.101131openalex-snapshot
A two-stage memetic algorithm for energy-efficient flexible job shop scheduling by means of decreasing the total number of machine restarts
inferred← citeshttps://doi.org/10.1080/00207543.2022.2118887openalex-snapshot
Energy-efficient unrelated parallel machine scheduling with general position-based deterioration
inferred← citeshttps://doi.org/10.1080/00207543.2022.2154404openalex-snapshot
A new two-stage constraint programming approach for open shop scheduling problem with machine blocking
inferred← citeshttps://doi.org/10.1080/00207543.2023.2228922openalex-snapshot
Robust identical parallel machine scheduling with two-stage time-of-use tariff and not-all-machine option
inferred← citeshttps://doi.org/10.1080/00207543.2026.2739610openalex-snapshot
Energy-efficient scheduling of unrelated parallel machines under time-of-use electricity pricing with release dates
inferred← citeshttps://doi.org/10.11606/t.18.2023.tde-19052023-162053openalex-snapshot
Contributions to new variants of the open shop scheduling problem: modeling and solution methods
inferred← citeshttps://doi.org/10.1177/0958305x231193868openalex-snapshot
Energy consumption optimization for sustainable flexible robotic cells: Proposing exact and metaheuristic methods
inferred← citeshttps://doi.org/10.1177/21582440231193390openalex-snapshot
The Strategy of Strengthening Efficiency and Environmental Performance of Product Changeover in the Multiproduct Production System
inferred← citeshttps://doi.org/10.1515/zwf-2023-1032openalex-snapshot
Energieoptimierte Produktionsplanung
inferred← citeshttps://doi.org/10.22219/jtiumm.vol21.no2.115-125openalex-snapshot
Mathematical Models of Energy-Conscious Bi-Objective Unrelated Parallel Machine Scheduling
inferred← citeshttps://doi.org/10.2991/978-94-6463-256-9_140openalex-snapshot
Integrated Energy Optimal Dispatch of Industrial Park Based on Improved Grey Wolf Algorithm
inferred← citeshttps://doi.org/10.32604/cmc.2024.054473openalex-snapshot
Dynamical Artificial Bee Colony for Energy-Efficient Unrelated Parallel Machine Scheduling with Additional Resources and Maintenance
inferred← citeshttps://doi.org/10.3390/app11167366openalex-snapshot
A Literature Review of Energy Efficiency and Sustainability in Manufacturing Systems
inferred← citeshttps://doi.org/10.3390/app12136456openalex-snapshot
Energy-Efficient Hybrid Flow-Shop Scheduling under Time-of-Use and Ladder Electricity Tariffs
inferred← citeshttps://doi.org/10.3390/math12030376openalex-snapshot
An Energy-Efficient Unrelated Parallel Machine Scheduling Problem with Batch Processing and Time-of-Use Electricity Prices
inferred← citeshttps://doi.org/10.3390/su13169277openalex-snapshot
Green Scheduling of Identical Parallel Machines with Release Date, Delivery Time and No-Idle Machine Constraints
inferred← citeshttps://doi.org/10.3390/su172411330openalex-snapshot
Towards Sustainable Factories: A Systematic Review of Energy-Conscious Job-Shop Scheduling Models and Algorithms
inferred← citeshttps://doi.org/10.70675/51518621z8001z4598za25czbced238ece14openalex-snapshot
Optimisation de l’ordonnancement avec considérations environnementales
inferred← citeshttps://doi.org/10.7287/peerj-cs.844v0.1/reviews/1openalex-snapshot
Peer Review #1 of "A mathematical formulation and an NSGA-II algorithm for minimizing the makespan and energy cost under time-of-use electricity price in an unrelated parallel machine scheduling (v0.1)"
inferred← citeshttps://doi.org/10.7287/peerj-cs.844v0.1/reviews/2openalex-snapshot
Peer Review #2 of "A mathematical formulation and an NSGA-II algorithm for minimizing the makespan and energy cost under time-of-use electricity price in an unrelated parallel machine scheduling (v0.1)"
inferred← citeshttps://doi.org/10.7287/peerj-cs.844v0.1/reviews/3openalex-snapshot
Peer Review #3 of "A mathematical formulation and an NSGA-II algorithm for minimizing the makespan and energy cost under time-of-use electricity price in an unrelated parallel machine scheduling (v0.1)"
inferred← citeshttps://doi.org/10.7287/peerj-cs.844v0.2/reviews/3openalex-snapshot
Peer Review #3 of "A mathematical formulation and an NSGA-II algorithm for minimizing the makespan and energy cost under time-of-use electricity price in an unrelated parallel machine scheduling (v0.2)"
inferred← citeshttps://doi.org/10.7717/peerj-cs.844openalex-snapshot
A mathematical formulation and an NSGA-II algorithm for minimizing the makespan and energy cost under time-of-use electricity price in an unrelated parallel machine scheduling
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.