On the public citation graph

Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus

0 signed · 79 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1007/s11518-018-5379-3openalex-snapshot
Cost and Service-Level-Based Model for a Seru Production System Formation Problem with Uncertain Demand
inferredcites →https://doi.org/10.1007/s11740-018-0840-1openalex-snapshot
Scheduling two interfering job sets on parallel machines under peak power constraint
inferredcites →https://doi.org/10.1016/j.asoc.2018.11.043openalex-snapshot
A multi-objective cellular grey wolf optimizer for hybrid flowshop scheduling problem considering noise pollution
inferredcites →https://doi.org/10.1016/j.cie.2016.11.035openalex-snapshot
Line-hybrid seru system conversion: Models, complexities, properties, solutions and insights
inferredcites →https://doi.org/10.1016/j.cie.2021.107552openalex-snapshot
Optimal cross-trained worker assignment for a hybrid seru production system to minimize makespan and workload imbalance
inferredcites →https://doi.org/10.1016/j.cor.2018.04.009openalex-snapshot
A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost
inferredcites →https://doi.org/10.1016/j.cor.2020.104917openalex-snapshot
Attaining flexibility in seru production system by means of Shojinka: An optimization model and solution approaches
inferredcites →https://doi.org/10.1016/j.jclepro.2013.07.060openalex-snapshot
An investigation into minimising total energy consumption and total weighted tardiness in job shops
inferredcites →https://doi.org/10.1016/j.jclepro.2014.07.025openalex-snapshot
Sustainable performance oriented operational decision-making of single machine systems with deterministic product arrival time
inferredcites →https://doi.org/10.1016/j.jclepro.2017.04.018openalex-snapshot
Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs
inferredcites →https://doi.org/10.1016/j.jclepro.2017.10.188openalex-snapshot
A new double flexible job-shop scheduling problem integrating processing time, green production, and human factor indicators
inferredcites →https://doi.org/10.1016/j.jclepro.2017.10.342openalex-snapshot
A green scheduling algorithm for flexible job shop with energy-saving measures
inferredcites →https://doi.org/10.1016/j.jclepro.2018.02.004openalex-snapshot
Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions
inferredcites →https://doi.org/10.1016/j.jclepro.2018.02.224openalex-snapshot
Multi-object optimization of flexible flow shop scheduling with batch process — Consideration total electricity consumption and material wastage
inferredcites →https://doi.org/10.1016/j.jclepro.2018.03.254openalex-snapshot
A two-stage optimization method for energy-saving flexible job-shop scheduling based on energy dynamic characterization
inferredcites →https://doi.org/10.1016/j.jclepro.2018.05.056openalex-snapshot
Bi-objective identical parallel machine scheduling to minimize total energy consumption and makespan
inferredcites →https://doi.org/10.1016/j.jclepro.2018.06.137openalex-snapshot
A multi-objective approach to welding shop scheduling for makespan, noise pollution and energy consumption
inferredcites →https://doi.org/10.1016/j.jclepro.2018.10.048openalex-snapshot
Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing
inferredcites →https://doi.org/10.1016/j.jclepro.2018.10.193openalex-snapshot
Sustainable evaluation of environmental and occupational risks scheduling flexible job shop manufacturing systems
inferredcites →https://doi.org/10.1016/j.jclepro.2018.10.289openalex-snapshot
Energy- and labor-aware flexible job shop scheduling under dynamic electricity pricing: A many-objective optimization investigation
inferredcites →https://doi.org/10.1016/j.jclepro.2018.11.021openalex-snapshot
MILP models for energy-aware flexible job shop scheduling problem
inferredcites →https://doi.org/10.1016/j.jclepro.2018.11.231openalex-snapshot
Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption
inferredcites →https://doi.org/10.1016/j.jclepro.2019.01.166openalex-snapshot
Bi-objective green scheduling in uniform parallel machine environments
inferredcites →https://doi.org/10.1016/j.jclepro.2019.03.155openalex-snapshot
A multi-objective iterated local search algorithm for comprehensive energy-aware hybrid flow shop scheduling
inferredcites →https://doi.org/10.1016/j.jclepro.2019.04.046openalex-snapshot
Stochastic multi-objective modelling and optimization of an energy-conscious distributed permutation flow shop scheduling problem with the total tardiness constraint
inferredcites →https://doi.org/10.1016/j.jclepro.2019.06.151openalex-snapshot
Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization
inferredcites →https://doi.org/10.1016/j.jclepro.2019.118845openalex-snapshot
A multi-objective cellular genetic algorithm for energy-oriented balancing and sequencing problem of mixed-model assembly line
inferredcites →https://doi.org/10.1016/j.jclepro.2019.118869openalex-snapshot
Bi-objective optimization approach for energy aware scheduling considering electricity cost and preventive maintenance using genetic algorithm
inferredcites →https://doi.org/10.1016/j.jclepro.2019.119070openalex-snapshot
Integrated intelligent green scheduling of sustainable flexible workshop with edge computing considering uncertain machine state
inferredcites →https://doi.org/10.1016/j.jclepro.2019.119071openalex-snapshot
The mixed production mode considering continuous and intermittent processing for an energy-efficient hybrid flow shop scheduling
inferredcites →https://doi.org/10.1016/j.jclepro.2019.119093openalex-snapshot
Infinitely repeated game based real-time scheduling for low-carbon flexible job shop considering multi-time periods
inferredcites →https://doi.org/10.1016/j.jclepro.2019.119300openalex-snapshot
Green manufacturing: Order acceptance and scheduling subject to the budgets of energy consumption and machine launch
inferredcites →https://doi.org/10.1016/j.jclepro.2019.119393openalex-snapshot
Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs
inferredcites →https://doi.org/10.1016/j.jclepro.2019.119428openalex-snapshot
Scheduling of unrelated parallel machines considering sequence-related setup time, start time-dependent deterioration, position-dependent learning and power consumption minimization
inferredcites →https://doi.org/10.1016/j.jclepro.2019.119734openalex-snapshot
Multi-objective green flowshop scheduling problem under uncertainty: Estimation of distribution algorithm
inferredcites →https://doi.org/10.1016/j.jclepro.2020.120009openalex-snapshot
An optimization method for energy-conscious production in flexible machining job shops with dynamic job arrivals and machine breakdowns
inferredcites →https://doi.org/10.1016/j.jmse.2020.10.002openalex-snapshot
Minimizing makespan of a production batch within concurrent systems: Seru production perspective
inferredcites →https://doi.org/10.1016/j.jmse.2021.05.004openalex-snapshot
Solving the rotating seru production problem with dynamic multi-objective evolutionary algorithms
inferredcites →https://doi.org/10.1016/j.jmsy.2011.08.004openalex-snapshot
A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
inferredcites →https://doi.org/10.1016/j.omega.2016.01.013openalex-snapshot
Effects of key enabling technologies for seru production on sustainable performance
inferredcites →https://doi.org/10.1016/j.omega.2018.01.001openalex-snapshot
A memetic differential evolution algorithm for energy-efficient parallel machine scheduling
inferredcites →https://doi.org/10.1016/j.orl.2013.04.007openalex-snapshot
Single-machine scheduling to minimize the total earliness and tardiness is strongly NP-hard
inferredcites →https://doi.org/10.1016/j.rcim.2013.04.001openalex-snapshot
Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm
inferredcites →https://doi.org/10.1016/j.resconrec.2016.12.001openalex-snapshot
Minimizing total carbon footprint and total late work criterion in flexible job shop scheduling by using an improved multi-objective genetic algorithm
inferredcites →https://doi.org/10.1080/00207540701450013openalex-snapshot
Operational methods for minimization of energy consumption of manufacturing equipment
inferredcites →https://doi.org/10.1080/00207543.2017.1284359openalex-snapshot
Line-seru conversion towards reducing worker(s) without increasing makespan: models, exact and meta-heuristic solutions
inferredcites →https://doi.org/10.1080/00207543.2017.1401236openalex-snapshot
Scheduling on a two-machine permutation flow shop under time-of-use electricity tariffs
inferredcites →https://doi.org/10.1080/00207543.2017.1414969openalex-snapshot
Production scheduling optimisation with machine state and time-dependent energy costs
inferredcites →https://doi.org/10.1080/00207543.2018.1501166openalex-snapshot
Mathematical modelling and optimisation of energy-conscious hybrid flow shop scheduling problem with unrelated parallel machines
inferredcites →https://doi.org/10.1080/00207543.2018.1504251openalex-snapshot
An improved multi-objective evolutionary algorithm based on decomposition for energy-efficient permutation flow shop scheduling problem with sequence-dependent setup time
inferredcites →https://doi.org/10.1080/00207543.2019.1581955openalex-snapshot
Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study
inferredcites →https://doi.org/10.1080/00207543.2019.1669841openalex-snapshot
Operational strategies for seru production system: a bi-objective optimisation model and solution methods
inferredcites →https://doi.org/10.1080/01605682.2019.1595190openalex-snapshot
Green parallel machines scheduling problem: A bi-objective model and a heuristic algorithm to obtain Pareto frontier
inferredcites →https://doi.org/10.1080/0305215x.2017.1296437openalex-snapshot
Bi-objective scheduling on uniform parallel machines considering electricity cost
inferredcites →https://doi.org/10.1080/0951192x.2017.1337929openalex-snapshot
IoT-enabled real-time energy efficiency optimisation method for energy-intensive manufacturing enterprises
inferredcites →https://doi.org/10.1080/19761597.2010.9668694openalex-snapshot
Seru Seisan‐ an innovation of the production management Mode in Japan
inferredcites →https://doi.org/10.1109/4235.996017openalex-snapshot
A fast and elitist multiobjective genetic algorithm: NSGA-II
inferredcites →https://doi.org/10.1109/access.2018.2889372openalex-snapshot
A Cooperative Coevolution Algorithm for the Seru Production With Minimizing Makespan
inferredcites →https://doi.org/10.1109/tase.2015.2495328openalex-snapshot
Parallel Machine Scheduling Under Time-of-Use Electricity Prices: New Models and Optimization Approaches
inferredcites →https://doi.org/10.1109/tase.2016.2631491openalex-snapshot
An Improved Model for Parallel Machine Scheduling Under Time-of-Use Electricity Price
inferredcites →https://doi.org/10.1109/tcyb.2018.2796119openalex-snapshot
A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold
inferredcites →https://doi.org/10.1109/tem.2017.2774281openalex-snapshot
A novel teaching-learning-based optimization algorithm for energy-efficient scheduling in hybrid flow shop
inferredcites →https://doi.org/10.1109/tsmc.2016.2616347openalex-snapshot
A Collaborative Multiobjective Fruit Fly Optimization Algorithm for the Resource Constrained Unrelated Parallel Machine Green Scheduling Problem
inferredcites →https://doi.org/10.1109/tsmc.2017.2788879openalex-snapshot
A Knowledge-Based Cooperative Algorithm for Energy-Efficient Scheduling of Distributed Flow-Shop
inferredcites →https://doi.org/10.1111/itor.12014openalex-snapshot
An implementation framework for seru production
inferredcites →https://doi.org/10.1155/2016/9748378openalex-snapshot
Formulations, Features of Solution Space, and Algorithms for Line-PureSeruSystem Conversion
inferredcites →https://doi.org/10.1177/1687814017695959openalex-snapshot
Energy-efficient job shop scheduling problem with variable spindle speed using a novel multi-objective algorithm
inferredcites →https://doi.org/10.1186/s40064-016-2445-5openalex-snapshot
Complexity of line-seru conversion for different scheduling rules and two improved exact algorithms for the multi-objective optimization
inferredcites →https://doi.org/10.1287/opre.26.6.1079openalex-snapshot
Technical Note—Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties
inferredcites →https://doi.org/10.1504/ajmsa.2015.075337openalex-snapshot
Comparison of two typical scheduling rules of line-seru conversion problem
inferredcites →https://doi.org/10.1504/ejie.2022.121959openalex-snapshot
Task dispatching in reconfigurable seru production systems to minimise total earliness and tardiness
inferredcites →https://doi.org/10.3390/su10030841openalex-snapshot
Multi-Objective Flexible Flow Shop Scheduling Problem Considering Variable Processing Time due to Renewable Energy
inferredcites →https://doi.org/10.4018/jsds.2012010104openalex-snapshot
Seru
inferredcites →https://doi.org/10.4028/www.scientific.net/amr.139-141.1415openalex-snapshot
Green Scheduling and its Solution

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4666189openalex-extracted
Scheduling Problems in Seru Production System Considering Worker Cooperation and Learning Behavior
inferred← citeshttps://doi.org/10.1016/j.cie.2024.110399openalex-snapshot
Integrated optimization of worker assignment, batch splitting and scheduling for a hybrid assembly line-seru production system
inferred← citeshttps://doi.org/10.1016/j.ejor.2025.02.038openalex-snapshot
Lagrangian relaxation and branch-and-price algorithm for resource assignment problem in divisional seru systems
inferred← citeshttps://doi.org/10.1016/j.ijpe.2025.109769openalex-snapshot
Optimization of production scheduling and energy cost considering carbon trading strategies
inferred← citeshttps://doi.org/10.3390/pr12010038openalex-snapshot
Optimizing Production Schedules: Balancing Worker Cooperation and Learning Dynamics in Seru Systems
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.