On the public citation graph

Project selection and its impact on the successful deployment of Six Sigma

https://doi.org/10.1108/14637150910987900
0 signed · 160 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/9781394323265.ch3openalex-snapshot
The Project Selection Process
inferredcites →https://doi.org/10.1007/978-3-8349-9320-5_24openalex-snapshot
The Six Sigma Way
inferredcites →https://doi.org/10.1007/s001700170010openalex-snapshot
Combining the Analytic Hierarchy Process and Quality Function Deployment for a Location Decision from a Requirement Perspective
inferredcites →https://doi.org/10.1016/s0263-7863(02)00112-6openalex-snapshot
The Project Excellence Model®: linking success criteria and critical success factors
inferredcites →https://doi.org/10.1016/s0263-7863(98)00040-4openalex-snapshot
Criteria of project success: an exploratory re-examination
inferredcites →https://doi.org/10.1057/palgrave.jors.2602060openalex-snapshot
Application of stochastic analytic hierarchy process within a domestic appliance manufacturer
inferredcites →https://doi.org/10.1080/00207540500272980openalex-snapshot
Lean tool selection in a die casting unit: a fuzzy-based decision support heuristic
inferredcites →https://doi.org/10.1080/09537280010016783openalex-snapshot
A decision support system for the selection of a casting process using analytic hierarchy process
inferredcites →https://doi.org/10.1108/01443570210414329openalex-snapshot
Case research in operations management
inferredcites →https://doi.org/10.1108/02656710610657602openalex-snapshot
Choosing a quality improvement project using the analytic hierarchy process
inferredcites →https://doi.org/10.1108/02656719510076258openalex-snapshot
Selection of TQM pilot projects using an MCDM approach
inferredcites →https://doi.org/10.1108/02686900410557908openalex-snapshot
Six Sigma in the UK service organisations: results from a pilot survey
inferredcites →https://doi.org/10.1108/02686900410557926openalex-snapshot
Six Sigma in the software industry: results from a pilot study
inferredcites →https://doi.org/10.1108/09544780310487730openalex-snapshot
Going from six sigma to design for six sigma: an exploratory study using analytic hierarchy process
inferredcites →https://doi.org/10.1108/14635770310495492openalex-snapshot
The analytic hierarchy process in project evaluation
inferredcites →https://doi.org/10.1243/095440505x32418openalex-snapshot
An application of Six Sigma methodology to reduce the engine-overheating problem in an automotive company
inferredcites →https://doi.org/10.1504/ijssca.2004.005274openalex-snapshot
Six-Sigma: the evolution of 100 years of business improvement methodology
inferredcites →https://doi.org/10.1504/ijssca.2005.006428openalex-snapshot
Some thoughts about problem solving in a DMAIC framework
inferredcites →https://doi.org/10.21236/ada214804openalex-snapshot
Optimization by the Analytic Hierarchy Process
inferredcites →https://doi.org/10.3280/so2008-002004openalex-snapshot
Building theories from case study research
inferredcites →https://doi.org/10.4135/9781446280119.n26openalex-snapshot
Case Study Research
inferredcites →https://doi.org/10.5465/amr.1989.4308385openalex-snapshot
Building Theories from Case Study Research

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4585004openalex-extracted
Project Portfolio Selection Using Integrated Methods: A Scientometric and Systematic Review
inferred← citeshttps://doi.org/10.1002/mcda.1798openalex-snapshot
Identifying and prioritising process portfolio for sustaining an effective business process management lifecycle
inferred← citeshttps://doi.org/10.1007/978-1-4471-5352-8_4openalex-snapshot
Six Sigma in Supply Chain
inferred← citeshttps://doi.org/10.1007/978-3-030-43897-5_1openalex-snapshot
Product Development: State of the Art and Challenges
inferred← citeshttps://doi.org/10.1007/978-3-031-09176-6_54openalex-snapshot
A Novel Comprehensive Decision-Making Criteria Weights Proposition Under Fuzzy Preference Judgments for Project Type Selection in the Shipbuilding Industry
inferred← citeshttps://doi.org/10.1007/s11227-023-05250-yopenalex-snapshot
Selection of Six Sigma projects based on integrated multi-criteria decision-making methods: the case of the software development industry
inferred← citeshttps://doi.org/10.1007/s12063-026-00592-1openalex-snapshot
Process improvement in an onshore wind turbine blade industrial unit
inferred← citeshttps://doi.org/10.1016/j.ejor.2016.03.022openalex-snapshot
The influence of challenging goals and structured method on Six Sigma project performance: A mediated moderation analysis
inferred← citeshttps://doi.org/10.1016/j.eswa.2020.114471openalex-snapshot
Ordered fuzzy WASPAS method for selection of improvement projects
inferred← citeshttps://doi.org/10.1016/j.ijproman.2013.12.004openalex-snapshot
An economic–probabilistic model for project selection and prioritization
inferred← citeshttps://doi.org/10.1016/j.promfg.2020.01.126openalex-snapshot
Six Sigma application for quality improvement of the pin insertion process
inferred← citeshttps://doi.org/10.1016/j.ssaho.2026.102845openalex-snapshot
State-of-the-art integrated approaches for project portfolio selection: A scientometric and systematic analysis
inferred← citeshttps://doi.org/10.1016/j.susmat.2023.e00617openalex-snapshot
Toward sustainable future: Strategies, indicators, and challenges for implementing sustainable production systems
inferred← citeshttps://doi.org/10.1080/00207543.2014.903345openalex-snapshot
Prioritisation of operations improvement projects in the European manufacturing industry
inferred← citeshttps://doi.org/10.1080/08874417.2021.2010150openalex-snapshot
Understanding Data Analytics Recommendation Execution: The Role of Recommendation Quality
inferred← citeshttps://doi.org/10.1080/09537287.2010.537286openalex-snapshot
Project selection through fuzzy analytic hierarchy process and a case study on Six Sigma implementation in an automotive industry
inferred← citeshttps://doi.org/10.1080/09537287.2013.867377openalex-snapshot
Nonconformity tracking and prioritisation matrix: an approach for selecting nonconformities as a contribution to the field of TQM
inferred← citeshttps://doi.org/10.1080/09537287.2014.891058openalex-snapshot
Comprehensive Six Sigma application: a case study
inferred← citeshttps://doi.org/10.1080/09537287.2014.949896openalex-snapshot
Eco-Six Sigma: integration of environmental variables into the Six Sigma technique
inferred← citeshttps://doi.org/10.1080/09537287.2016.1225999openalex-snapshot
A conceptual hybrid framework for industrial process improvement: integrating Taguchi methods, Shainin System and Six Sigma
inferred← citeshttps://doi.org/10.1080/09537287.2019.1706196openalex-snapshot
Six sigma project generation and selection: literature review and feature based method proposition
inferred← citeshttps://doi.org/10.1080/10686967.2012.11918525openalex-snapshot
Prioritizing Improvement Projects: Benefit & Effort (B&E) Analysis
inferred← citeshttps://doi.org/10.1080/10686967.2014.11918408openalex-snapshot
A Multilevel Framework of Six Sigma: A Systematic Review of the Literature, Possible Extensions, and Future Research
inferred← citeshttps://doi.org/10.1080/14783363.2011.637803openalex-snapshot
Global views on integrating Six Sigma and ISO 9001 certification
inferred← citeshttps://doi.org/10.1080/14783363.2017.1419055openalex-snapshot
An approach for identifying and selecting improvement projects
inferred← citeshttps://doi.org/10.1097/qmh.0000000000000119openalex-snapshot
Selecting Health Care Improvement Projects: A Methodology Integrating Cause-and-Effect Diagram and Analytical Hierarchy Process
inferred← citeshttps://doi.org/10.1108/02656711111132562openalex-snapshot
Reconstructing Six Sigma barriers in manufacturing and service organizations
inferred← citeshttps://doi.org/10.1108/17410401211277165openalex-snapshot
Lean Six Sigma for higher education institutions (HEIs)
inferred← citeshttps://doi.org/10.1108/20401461211282709openalex-snapshot
Deploying LSS in a global enterprise – project identification
inferred← citeshttps://doi.org/10.1108/20401461211284752openalex-snapshot
Linking Six Sigma's critical success/hindering factors and organizational change (development)
inferred← citeshttps://doi.org/10.1108/978-1-78973-687-820191014openalex-snapshot
References
inferred← citeshttps://doi.org/10.1108/978-1-83753-532-320261006openalex-snapshot
DFLSS Project Selection, Prioritisation, and Execution of Projects
inferred← citeshttps://doi.org/10.1108/bij-09-2015-0086openalex-snapshot
Prioritization of Six-Sigma project selection
inferred← citeshttps://doi.org/10.1108/bpmj-06-2023-0468openalex-snapshot
Societal impact: leveraging operational excellence in the Iowa prison industries
inferred← citeshttps://doi.org/10.1108/bpmj-09-2015-0129openalex-snapshot
Estimating performance from capabilities in business process improvement
inferred← citeshttps://doi.org/10.1108/ijlss-01-2021-0001openalex-snapshot
Six sigma project prioritization and selection methods: a systematic literature review
inferred← citeshttps://doi.org/10.1108/ijlss-01-2021-0018openalex-snapshot
Addressing critical failure factors and barriers in implementing Lean Six Sigma in Italian public hospitals
inferred← citeshttps://doi.org/10.1108/ijlss-02-2014-0006openalex-snapshot
Project barriers to Green Belts through critical success factors
inferred← citeshttps://doi.org/10.1108/ijlss-02-2017-0018openalex-snapshot
An exploration of the extent of Lean Six Sigma implementation in the West of Ireland
inferred← citeshttps://doi.org/10.1108/ijlss-02-2017-0019openalex-snapshot
Introducing Lean Six Sigma to a German municipality: an action research report
inferred← citeshttps://doi.org/10.1108/ijlss-03-2018-0018openalex-snapshot
A structured review of Lean Six Sigma in various industrial sectors
inferred← citeshttps://doi.org/10.1108/ijlss-03-2025-0047openalex-snapshot
Project portfolio selection and prioritization through supervised machine learning in continuous improvement projects
inferred← citeshttps://doi.org/10.1108/ijlss-04-2020-0054openalex-snapshot
Six sigma project prioritization and selection: a multi-criteria decision making approach in healthcare industry
inferred← citeshttps://doi.org/10.1108/ijlss-04-2023-0070openalex-snapshot
Six sigma project generation and selection: an action research study
inferred← citeshttps://doi.org/10.1108/ijlss-04-2025-0098openalex-snapshot
Project selection for integrated lean six sigma and industry 4.0 using hybrid neutrosophic ANP-TOPSIS
inferred← citeshttps://doi.org/10.1108/ijlss-06-2015-0026openalex-snapshot
The AMSE Lean Six Sigma governance model
inferred← citeshttps://doi.org/10.1108/ijlss-06-2017-0054openalex-snapshot
Exploring Lean Six Sigma implementation barriers in Information Technology industry
inferred← citeshttps://doi.org/10.1108/ijlss-08-2013-0049openalex-snapshot
Process improvement in farm equipment sector (FES): a case on Six Sigma adoption
inferred← citeshttps://doi.org/10.1108/ijlss-11-2015-0045openalex-snapshot
Six Sigma in construction: a review of critical success factors
inferred← citeshttps://doi.org/10.1108/ijlss-11-2016-0071openalex-snapshot
ISM and Fuzzy MICMAC application for analysis of Lean Six Sigma barriers with environmental considerations
inferred← citeshttps://doi.org/10.1108/ijlss-12-2013-0059openalex-snapshot
Six Sigma methodology: a structured review
inferred← citeshttps://doi.org/10.1108/ijlss-12-2020-0212openalex-snapshot
Green Lean Six Sigma sustainability – oriented project selection and implementation framework for manufacturing industry
inferred← citeshttps://doi.org/10.1108/ijqrm-01-2016-0010openalex-snapshot
A fuzzy AHP approach to prioritize the barriers of integrated Lean Six Sigma
inferred← citeshttps://doi.org/10.1108/ijqrm-01-2024-0013openalex-snapshot
Global perspectives on operational excellence: unveiling critical failure factors and sustainable pathways
inferred← citeshttps://doi.org/10.1108/ijqrm-03-2019-0093openalex-snapshot
A study into the reasons for process improvement project failures: results from a pilot survey
inferred← citeshttps://doi.org/10.1108/ijqrm-03-2023-0066openalex-snapshot
Impact of Six Sigma barriers factors on SS project success: evidence from the Tunisian service sector
inferred← citeshttps://doi.org/10.1108/ijqrm-07-2023-0237openalex-snapshot
Proposal of a facilitating methodology for fuzzy FMEA implementation with application in process risk analysis in the aeronautical sector
inferred← citeshttps://doi.org/10.1108/ijqrm-08-2015-0116openalex-snapshot
Integration of Taguchi and Shainin DOE for Six Sigma improvement: an Indian case
inferred← citeshttps://doi.org/10.1108/ijqrm-09-2013-0147openalex-snapshot
Critical failure factors of Lean Six Sigma: a systematic literature review
inferred← citeshttps://doi.org/10.1108/ijqrm-09-2016-0155openalex-snapshot
Deploying Six Sigma practices to General Electric subsidiaries in a developing economy
inferred← citeshttps://doi.org/10.1108/imds-11-2016-0498openalex-snapshot
Quality improvement pilot program selection based on dynamic hybrid MCDM approach
inferred← citeshttps://doi.org/10.1108/jmtm-12-2011-0109openalex-snapshot
An application of Six Sigma methodology for improving the first pass yield of a grinding process
inferred← citeshttps://doi.org/10.1108/k-07-2017-0250openalex-snapshot
Selection of Six Sigma project with interval data: common weight DEA model
inferred← citeshttps://doi.org/10.1108/mbe-11-2019-0106openalex-snapshot
Critical success factors for Six Sigma implementation in Indian SMEs: an evaluation using AHP
inferred← citeshttps://doi.org/10.1108/tqm-02-2019-0051openalex-snapshot
Continuous improvement framework to develop cultural change: case study, capital goods company
inferred← citeshttps://doi.org/10.1108/tqm-04-2015-0049openalex-snapshot
The underlying factorial structure and significance of the Six Sigma difficulties and critical success factors
inferred← citeshttps://doi.org/10.1108/tqm-05-2022-0176openalex-snapshot
An empirical study into the reasons for failure of sustaining operational excellence initiatives in organizations
inferred← citeshttps://doi.org/10.1108/tqm-11-2020-0271openalex-snapshot
Six Sigma to distinguish patterns in COVID-19 approaches
inferred← citeshttps://doi.org/10.1108/tqm-12-2018-0191openalex-snapshot
An evaluation into the limitations and emerging trends of Six Sigma: an empirical study
inferred← citeshttps://doi.org/10.1109/tem.2020.3009935openalex-snapshot
A Global Study Into the Reasons for Lean Six Sigma Project Failures: Key Findings and Directions for Further Research
inferred← citeshttps://doi.org/10.1109/tem.2021.3050460openalex-snapshot
An Empirical Study Into Qualifications and Skills of Quality Management Practitioners in Contemporary Organizations: Results From a Global Survey and Agenda for Future Research
inferred← citeshttps://doi.org/10.1109/tem.2021.3071294openalex-snapshot
Characterization and Examination of Operational Excellence Deployment Failures: Mediation Effect of Technical and Behavioral Failure Factors
inferred← citeshttps://doi.org/10.1109/tem.2021.3100795openalex-snapshot
Six Sigma Project Prioritization and Selection Using AHP–CODAS Integration: A Case Study in Healthcare Industry
inferred← citeshttps://doi.org/10.1109/tem.2023.3335237openalex-snapshot
Machine Learning Aided Six Sigma: Perspective and Practical Implementation
inferred← citeshttps://doi.org/10.1155/2014/730934openalex-snapshot
Applying a Hybrid MCDM Model for Six Sigma Project Selection
inferred← citeshttps://doi.org/10.11606/t.96.2015.tde-20072015-170330openalex-snapshot
Proposta de melhoria para o processo DMAIC com integração do AHP: uma aplicação na operação de distribuição física de bebidas
inferred← citeshttps://doi.org/10.1186/1472-6947-15-s3-s3openalex-snapshot
A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry
inferred← citeshttps://doi.org/10.1201/b20441-9openalex-snapshot
LSS Project Selection
inferred← citeshttps://doi.org/10.12681/eadd/47607openalex-snapshot
Πρακτικές και στρατηγικές λιτής διαχείρισης (lean management) και εξοικονόμησης πόρων σε δημόσιες επιχειρήσεις
inferred← citeshttps://doi.org/10.1504/ijpm.2013.053651openalex-snapshot
Total performance excellence - a model for successful implementation of Six Sigma
inferred← citeshttps://doi.org/10.1504/ijpqm.2012.047943openalex-snapshot
Six Sigma project selection via quality function deployment
inferred← citeshttps://doi.org/10.1504/ijqi.2013.057002openalex-snapshot
Selecting Six Sigma projects with interval data envelopment analysis
inferred← citeshttps://doi.org/10.1504/ijsom.2012.045662openalex-snapshot
Literature snapshot on Six Sigma project selection for future research
inferred← citeshttps://doi.org/10.1504/ijssca.2011.039715openalex-snapshot
A fuzzy ANP-based approach for prioritising projects: a Six Sigma case study
inferred← citeshttps://doi.org/10.1504/ijssca.2011.040677openalex-snapshot
Application of Six Sigma methodology in efficiency enhancement and scrap reduction in a water-bottling company
inferred← citeshttps://doi.org/10.1504/ijssca.2012.053471openalex-snapshot
Total performance excellence - a model to implement Six Sigma in service organisations
inferred← citeshttps://doi.org/10.15628/empricabr.2023.15383openalex-snapshot
IMPLEMENTAÇÃO DAS METODOLOGIAS BUSINESS PROCESS MANAGEMENT E LEAN SIX SIGMA NA GESTÃO DOS PROCESSOS INTERNOS DE UMA EDITORA
inferred← citeshttps://doi.org/10.15675/gepros.v10i4.1244openalex-snapshot
Seis Sigma: dificuldades, limitações, fatores críticos de sucesso e perspectivas futuras
inferred← citeshttps://doi.org/10.1590/1806-9649-2023v30e6522openalex-snapshot
Overview of stages of change of lean six sigma programs in organizations from 2005 to 2021
inferred← citeshttps://doi.org/10.1590/1807-7692bar2020190034openalex-snapshot
Promoting and Selecting Strategy-Aligned Projects through Consensus in Universities - An Artifact
inferred← citeshttps://doi.org/10.20334/2386-mopenalex-snapshot
Finansinių išteklių paskirstymas projektų portfelyje atsižvelgiant į darnumo aspektus
inferred← citeshttps://doi.org/10.21608/caf.2017.128260openalex-snapshot
تقييم نظرية إدارة الجودة الشاملة بالاستناد إلى أسلوب إدارة ديمنج في المنظمات العامة في ضوء إطار التقييم المشترک : دراسة تطبيقية عن وزارة المالية المصرية
inferred← citeshttps://doi.org/10.22201/fi.25940732e.2017.18n1.005openalex-snapshot
Use of Value Driver Maps for Six Sigma Project Selection: A Case Study on Sales and Marketing for Soft Drinks Bottling Industry
inferred← citeshttps://doi.org/10.22555/pjets.v6i2.1964openalex-snapshot
Ranking and Sensitivity Analysis of Key Factors for Successful Project Management Performance: An Application of AHP for Oil and Gas Sector
inferred← citeshttps://doi.org/10.2991/ijcis.d.210222.003openalex-snapshot
A MCDM Method with Linguistic Variables and Intuitionistic Fuzzy Numbers to Evaluate Product Development Projects
inferred← citeshttps://doi.org/10.32565/aarms.2021.2.ksz.7openalex-snapshot
Cyber Autonomy Toolbox – Project Management Digital Transformation
inferred← citeshttps://doi.org/10.3390/su15107971openalex-snapshot
Sustainable Development and Implementation of Quality Management Excellence Models in Public Organizations: A Systematic Literature Review
inferred← citeshttps://doi.org/10.3390/su8060559openalex-snapshot
Strategic Part Prioritization for Quality Improvement Practice Using a Hybrid MCDM Framework: A Case Application in an Auto Factory
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6openalex-snapshot
Gestão da Produção em Foco – Volume 51
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.01openalex-snapshot
Aplicações de algoritmos bioinspirados para estimação de rotas em um arranjo circular de antenas adaptativas
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.02openalex-snapshot
Estudo de técnicas de filtragem no desenvolvimento do quadro morfológico para geração de soluções de produtos têxteis
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.03openalex-snapshot
Produção de habitação em madeira no sistema construtivo pilar-viga
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.04openalex-snapshot
Tecnologia interativa para a captação de resíduos recicláveis
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.06openalex-snapshot
Avaliação da maturidade na gestão da sustentabilidade nas indústrias de autopeças brasileiras
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.07openalex-snapshot
Aplicação de modelo GARMA para produção industrial brasileira
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.08openalex-snapshot
Analyzing re-make versus buy decision in remanufacturing operations: issues and directions
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.09openalex-snapshot
Os estereótipos do trabalhador idoso nos últimos anos de sua carreira profissional
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.10openalex-snapshot
Uma abordagem sobre a classificação de riscos ocupacionais como fator essencial para elaboração de um Programa de Gerenciamento de Riscos-PGR
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.11openalex-snapshot
Tendência empreendedora dos acadêmicos do curso de engenharia de produção de uma universidade pública
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.12openalex-snapshot
Empreendedorismo: Análise dos micro e pequenos negócios que fecharam suas portas nos últimos anos no Vale do Paraíba e cidades adjacentes
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.13openalex-snapshot
Análise de risco da entrada de uma empresa de serviços na área de instalação de módulos fotovoltaicos
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.14openalex-snapshot
Aplicação da filosofia Lean Seis Sigma e gestão de pessoas na área produtiva de uma empresa do setor de componentes automotivos
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.15openalex-snapshot
Gestão da aplicação do Lean em empresas de serviço: Foco nas concessionárias de veículos
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.16openalex-snapshot
Alinhamento estratégico na seleção de projetos de TI com Seis Sigma
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.17openalex-snapshot
Análise dos fatores críticos de sucesso no processo de implantação do Programa 5S em uma organização pública na cidade de Canoas-RS
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.18openalex-snapshot
Um estudo da aplicação de metodologias ágeis em sistemas judiciários
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.19openalex-snapshot
Metodologia 8D: Estudo e aplicação em uma fábrica de lanternas para veículos pesados
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.20openalex-snapshot
Modelagem e otimização do sistema de extrusão de impressoras 3D para construção civil
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.21openalex-snapshot
Aplicação de um modelo de apoio à decisão multicritério para seleção de uma fábrica de forros PVC para representação comercial
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.22openalex-snapshot
Proposta de solução de emergência em Petroquímica: Um estudo de caso
inferred← citeshttps://doi.org/10.36229/978-65-5866-156-6.cap.24openalex-snapshot
Mapeamento dos pós-graduandos brasileiros e reflexão sobre métricas de desempenho científico
inferred← citeshttps://doi.org/10.36909/jer.icetetopenalex-snapshot
inferred← citeshttps://doi.org/10.36909/jer.icetet.14985openalex-snapshot
An examination of research trends and constructs concerning frameworks for Sustainable Supply Chain Management (SSCM)-Review Paper
inferred← citeshttps://doi.org/10.4018/ijqaete.2012100104openalex-snapshot
Introducing Problem Based Learning (PBL) in Textile Engineering Education and Assessing its Influence on Six Sigma Project Implementation
inferred← citeshttps://doi.org/10.4102/sajems.v21i1.1852openalex-snapshot
A Lean Six Sigma framework to enhance the competitiveness in selected automotive component manufacturing organisations
inferred← citeshttps://doi.org/10.4236/ajor.2015.53011openalex-snapshot
Selecting the Six Sigma Project: A Multi Data Envelopment Analysis Unified Scoring Framework
inferred← citeshttps://doi.org/10.47749/t/unicamp.2024.1408063openalex-snapshot
Uma abordagem multicritério na simulação a eventos discretos em lean healthcare
inferred← citeshttps://doi.org/10.51415/10321/1175openalex-snapshot
A Lean Six Sigma framework to enhance the competitiveness in selected automotive component manufacturing organisations
inferred← citeshttps://doi.org/10.5171/2018.517249openalex-snapshot
Successful and Effective Six Sigma Implementation in the Manufacturing Industry
inferred← citeshttps://doi.org/10.5267/j.msl.2015.3.009openalex-snapshot
Six Sigma Project Selection Using Fuzzy TOPSIS Decision Making Approach
inferred← citeshttps://doi.org/10.5281/zenodo.21597844openalex-snapshot
Six Sigma : A Continuous Improvement Methodology for Manufacturing Organizations
inferred← citeshttps://doi.org/10.5539/emr.v1n1p92openalex-snapshot
The Virtues of Using Profitabilitymetric for Projectsselection
inferred← citeshttps://doi.org/10.5539/ijbm.v7n7p94openalex-snapshot
Diagnosing of Sustainable Competitive Advantage Using Six Sigma Methodology
inferred← citeshttps://doi.org/10.5585/gep.v5i3.285openalex-snapshot
O Processo de Tomada de Decisão para a Seleção de Projetos em uma PME do Setor de Engenharia
inferred← citeshttps://doi.org/10.5703/1288284316379openalex-snapshot
Learning Lean Six Sigma: A Student Reflective Study
inferred← citeshttps://doi.org/10.5902/2317175839354openalex-snapshot
Métodos de seleção de projetos com multicritério e balanced scorecard: uma análise dos métodos propostos na literatura e suas estratégias de validação
inferred← citeshttps://doi.org/10.5935/978-85-93729-06-5.2017b001openalex-snapshot
Seis Sigma Coletânea de Artigos volume 1
inferred← citeshttps://doi.org/10.7763/ijmo.2011.v1.73openalex-snapshot
A Fuzzy AHP Approach to Prioritization of Critical Success Factors for Six Sigma Implementation: Evidence from the Electronics Industry in Thailand
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.