Many-Objective Integrated Process Planning and Scheduling: A New Mixed-Integer Linear Programming Model and Genetic Algorithm
0 signed · 38 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1007/978-3-319-42111-7_17openalex-extracted
Depreciation Methods for Firm’s Assets
inferredcites →https://doi.org/10.1007/978-3-540-74581-5_1openalex-extracted
A New Evolutionary Decision Theory for Many-Objective Optimization Problems
inferredcites →https://doi.org/10.1007/s00170-011-3527-8openalex-extracted
Optimization of process planning with various flexibilities using an imperialist competitive algorithm
inferredcites →https://doi.org/10.1007/s00170-015-8037-7openalex-extracted
A multi-objective memetic algorithm for integrated process planning and scheduling
inferredcites →https://doi.org/10.1007/s001700050066openalex-extracted
Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems
inferredcites →https://doi.org/10.1007/s10845-005-7029-0openalex-extracted
A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment
inferredcites →https://doi.org/10.1007/s10845-015-1091-zopenalex-extracted
Two-generation Pareto ant colony algorithm for multi-objective job shop scheduling problem with alternative process plans and unrelated parallel machines
inferredcites →https://doi.org/10.1007/s11465-015-0353-yopenalex-extracted
Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm
inferredcites →https://doi.org/10.1016/j.cie.2019.04.028openalex-extracted
Particle swarm optimization hybridized with genetic algorithm for uncertain integrated process planning and scheduling with interval processing time
inferredcites →https://doi.org/10.1016/j.cor.2008.07.006openalex-extracted
Integration of process planning and scheduling—A modified genetic algorithm-based approach
inferredcites →https://doi.org/10.1016/j.cor.2009.06.008openalex-extracted
Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling
inferredcites →https://doi.org/10.1016/j.eng.2021.04.011openalex-extracted
A Novel MILP Model Based on the Topology of a Network Graph for Process Planning in an Intelligent Manufacturing System
inferredcites →https://doi.org/10.1016/j.eswa.2010.08.145openalex-extracted
An effective genetic algorithm for the flexible job-shop scheduling problem
inferredcites →https://doi.org/10.1016/j.ijpe.2010.04.001openalex-extracted
An effective hybrid algorithm for integrated process planning and scheduling
inferredcites →https://doi.org/10.1016/s0305-0548(02)00063-1openalex-extracted
A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
inferredcites →https://doi.org/10.1016/s0924-0136(03)00088-8openalex-extracted
Integration of scheduling with computer aided process planning
inferredcites →https://doi.org/10.1080/00207540110119991openalex-extracted
Hybrid genetic algorithm and simulated annealing approach for the optimization of process plans for prismatic parts
inferredcites →https://doi.org/10.1080/00207543.2011.631602openalex-extracted
A multi-objective optimisation model to integrating flexible process planning and scheduling based on hybrid multi-objective simulated annealing
inferredcites →https://doi.org/10.1080/00207543.2012.720393openalex-extracted
Integrated process planning and scheduling – multi-agent system with two-stage ant colony optimisation algorithm
inferredcites →https://doi.org/10.1080/00207543.2013.853890openalex-extracted
Integration of process planning and scheduling through adaptive setup planning: a multi-objective approach
inferredcites →https://doi.org/10.1080/00207543.2016.1140917openalex-extracted
More MILP models for integrated process planning and scheduling
inferredcites →https://doi.org/10.1080/00207549608905065openalex-extracted
Solving cell formation problems in a manufacturing environment with flexible processing and routeing capabilities
inferredcites →https://doi.org/10.1080/0305215x.2021.1939695openalex-extracted
Algorithms for generating Pareto fronts of multi-objective integer and mixed-integer programming problems
inferredcites →https://doi.org/10.1080/09511920600667366openalex-extracted
A simulated annealing-based optimization approach for integrated process planning and scheduling
inferredcites →https://doi.org/10.1080/21693277.2017.1415173openalex-extracted
Integrated multi-objective process planning and flexible job shop scheduling considering precedence constraints
inferredcites →https://doi.org/10.1109/4235.797969openalex-extracted
Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach
inferredcites →https://doi.org/10.1109/4235.996017openalex-extracted
A fast and elitist multiobjective genetic algorithm: NSGA-II
inferredcites →https://doi.org/10.1109/cec.2016.7743895openalex-extracted
EliteNSGA-III: An improved evolutionary many-objective optimization algorithm
inferredcites →https://doi.org/10.1109/icuems50872.2020.00035openalex-extracted
A Hybrid Colonial Competitive Algorithm for the Integrated Process Planning and Scheduling Problem
inferredcites →https://doi.org/10.1109/tase.2018.2886303openalex-extracted
A Pareto-Based Estimation of Distribution Algorithm for Solving Multiobjective Distributed No-Wait Flow-Shop Scheduling Problem With Sequence-Dependent Setup Time
inferredcites →https://doi.org/10.1109/tase.2021.3091610openalex-extracted
A Genetic Programming-Based Iterative Approach for the Integrated Process Planning and Scheduling Problem
inferredcites →https://doi.org/10.1109/tcyb.2020.3026651openalex-extracted
A Modified Genetic Algorithm With New Encoding and Decoding Methods for Integrated Process Planning and Scheduling Problem
inferredcites →https://doi.org/10.1109/tevc.2003.810758openalex-extracted
Performance assessment of multiobjective optimizers: an analysis and review
inferredcites →https://doi.org/10.1109/tevc.2007.892759openalex-extracted
MOEA/D: A Multiobjective Evolutionary Algorithm Based on Decomposition
inferredcites →https://doi.org/10.1109/tevc.2013.2281535openalex-extracted
An Evolutionary Many-Objective Optimization Algorithm Using Reference-Point-Based Nondominated Sorting Approach, Part I: Solving Problems With Box Constraints
inferredcites →https://doi.org/10.1109/tsmca.2004.824873openalex-extracted
A fuzzy definition of "optimality" for many-criteria optimization problems
inferredcites →https://doi.org/10.1109/tsmcc.2002.1009117openalex-extracted
Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
inferredcites →https://doi.org/10.3390/pr7030120openalex-extracted
Realizing Energy Savings in Integrated Process Planning and Scheduling
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.