On the public citation graph

Realizing Energy Savings in Integrated Process Planning and Scheduling

0 signed · 84 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1007/bf01719250openalex-snapshot
A generalized permutation approach to job shop scheduling with genetic algorithms
inferredcites →https://doi.org/10.1007/s00170-004-2317-yopenalex-snapshot
Integration of process planning and scheduling in a job shop environment
inferredcites →https://doi.org/10.1007/s00170-007-1087-8openalex-snapshot
Bidding-based multi-agent system for integrated process planning and scheduling: a data-mining and hybrid tabu-SA algorithm-oriented approach
inferredcites →https://doi.org/10.1007/s00170-013-4815-2openalex-snapshot
A cross-entropy-based approach for the optimization of flexible process planning
inferredcites →https://doi.org/10.1007/s00170-013-5469-9openalex-snapshot
Integration of process planning and job shop scheduling with stochastic processing time
inferredcites →https://doi.org/10.1007/s00170-015-7069-3openalex-snapshot
An effective hybrid honey bee mating optimization algorithm for integrated process planning and scheduling problems
inferredcites →https://doi.org/10.1007/s00170-015-8037-7openalex-snapshot
A multi-objective memetic algorithm for integrated process planning and scheduling
inferredcites →https://doi.org/10.1007/s10479-012-1294-zopenalex-snapshot
Flow shop scheduling with peak power consumption constraints
inferredcites →https://doi.org/10.1007/s10845-014-1023-3openalex-snapshot
Integrated process planning and scheduling: an enhanced ant colony optimization heuristic with parameter tuning
inferredcites →https://doi.org/10.1007/s10845-015-1091-zopenalex-snapshot
Two-generation Pareto ant colony algorithm for multi-objective job shop scheduling problem with alternative process plans and unrelated parallel machines
inferredcites →https://doi.org/10.1007/s40684-014-0010-7openalex-snapshot
Moving towards green and sustainable manufacturing
inferredcites →https://doi.org/10.1016/0360-8352(96)00047-2openalex-snapshot
A tutorial survey of job-shop scheduling problems using genetic algorithms—I. representation
inferredcites →https://doi.org/10.1016/j.apm.2009.09.002openalex-snapshot
Mathematical models for job-shop scheduling problems with routing and process plan flexibility
inferredcites →https://doi.org/10.1016/j.cor.2007.01.001openalex-snapshot
A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
inferredcites →https://doi.org/10.1016/j.cor.2009.06.008openalex-snapshot
Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling
inferredcites →https://doi.org/10.1016/j.cor.2018.04.009openalex-snapshot
A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost
inferredcites →https://doi.org/10.1016/j.ejor.2015.01.032openalex-snapshot
An object-coding genetic algorithm for integrated process planning and scheduling
inferredcites →https://doi.org/10.1016/j.energy.2018.05.207openalex-snapshot
Developing the ecological compensation criterion of industrial solid waste based on emergy for sustainable development
inferredcites →https://doi.org/10.1016/j.eswa.2011.11.074openalex-snapshot
An active learning genetic algorithm for integrated process planning and scheduling
inferredcites →https://doi.org/10.1016/j.ijpe.2010.04.001openalex-snapshot
An effective hybrid algorithm for integrated process planning and scheduling
inferredcites →https://doi.org/10.1016/j.jclepro.2014.10.006openalex-snapshot
An energy-responsive optimization method for machine tool selection and operation sequence in flexible machining job shops
inferredcites →https://doi.org/10.1016/j.jclepro.2015.03.099openalex-snapshot
A multi-objective teaching−learning-based optimization algorithm to scheduling in turning processes for minimizing makespan and carbon footprint
inferredcites →https://doi.org/10.1016/j.jclepro.2015.09.097openalex-snapshot
Solving the energy-efficient job shop scheduling problem: a multi-objective genetic algorithm with enhanced local search for minimizing the total weighted tardiness and total energy consumption
inferredcites →https://doi.org/10.1016/j.jclepro.2016.03.101openalex-snapshot
A method for minimizing the energy consumption of machining system: integration of process planning and scheduling
inferredcites →https://doi.org/10.1016/j.jclepro.2016.06.097openalex-snapshot
A method integrating Taguchi, RSM and MOPSO to CNC machining parameters optimization for energy saving
inferredcites →https://doi.org/10.1016/j.jclepro.2016.07.029openalex-snapshot
Energy-efficient multi-pass turning operation using multi-objective backtracking search algorithm
inferredcites →https://doi.org/10.1016/j.jclepro.2017.01.166openalex-snapshot
Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing/remanufacturing systems
inferredcites →https://doi.org/10.1016/j.jclepro.2017.07.028openalex-snapshot
Operation patterns analysis of automotive components remanufacturing industry development in China
inferredcites →https://doi.org/10.1016/j.jclepro.2017.10.342openalex-snapshot
A green scheduling algorithm for flexible job shop with energy-saving measures
inferredcites →https://doi.org/10.1016/j.jclepro.2018.03.254openalex-snapshot
A two-stage optimization method for energy-saving flexible job-shop scheduling based on energy dynamic characterization
inferredcites →https://doi.org/10.1016/j.jclepro.2018.11.021openalex-snapshot
MILP models for energy-aware flexible job shop scheduling problem
inferredcites →https://doi.org/10.1016/j.rcim.2007.12.002openalex-snapshot
Applications of particle swarm optimisation in integrated process planning and scheduling
inferredcites →https://doi.org/10.1016/j.rcim.2013.04.001openalex-snapshot
Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm
inferredcites →https://doi.org/10.1016/j.scitotenv.2019.02.069openalex-snapshot
Promoting sustainability of manufacturing industry through the lean energy-saving and emission-reduction strategy
inferredcites →https://doi.org/10.1016/s0305-0548(02)00063-1openalex-snapshot
A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
inferredcites →https://doi.org/10.1023/b:jims.0000037710.80847.b6openalex-snapshot
A linearized polynomial mixed integer programming model for the integration of process planning and scheduling
inferredcites →https://doi.org/10.1080/00207540701450013openalex-snapshot
Operational methods for minimization of energy consumption of manufacturing equipment
inferredcites →https://doi.org/10.1080/00207540701827905openalex-snapshot
Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach
inferredcites →https://doi.org/10.1080/00207543.2011.622310openalex-snapshot
Integrated process planning and scheduling using an imperialist competitive algorithm
inferredcites →https://doi.org/10.1080/00207543.2011.631602openalex-snapshot
A multi-objective optimisation model to integrating flexible process planning and scheduling based on hybrid multi-objective simulated annealing
inferredcites →https://doi.org/10.1080/00207543.2012.720393openalex-snapshot
Integrated process planning and scheduling – multi-agent system with two-stage ant colony optimisation algorithm
inferredcites →https://doi.org/10.1080/00207543.2013.765074openalex-snapshot
A priority scheduling approach for flexible job shops with multiple process plans
inferredcites →https://doi.org/10.1080/00207543.2015.1005248openalex-snapshot
Multi-objective genetic algorithm for energy-efficient job shop scheduling
inferredcites →https://doi.org/10.1080/00207543.2015.1058981openalex-snapshot
Operations scheduling under electricity time-varying prices
inferredcites →https://doi.org/10.1080/00207543.2016.1140917openalex-snapshot
More MILP models for integrated process planning and scheduling
inferredcites →https://doi.org/10.1080/00207543.2016.1262082openalex-snapshot
A shuffled frog-leaping algorithm for flexible job shop scheduling with the consideration of energy consumption
inferredcites →https://doi.org/10.1080/00207543.2018.1501166openalex-snapshot
Mathematical modelling and optimisation of energy-conscious hybrid flow shop scheduling problem with unrelated parallel machines
inferredcites →https://doi.org/10.1109/4235.996017openalex-snapshot
A fast and elitist multiobjective genetic algorithm: NSGA-II
inferredcites →https://doi.org/10.1109/tase.2017.2690802openalex-snapshot
Disassembly Sequence Planning Considering Fuzzy Component Quality and Varying Operational Cost
inferredcites →https://doi.org/10.1109/tem.2017.2785774openalex-snapshot
Flexible Assembly Job-Shop Scheduling With Sequence-Dependent Setup Times and Part Sharing in a Dynamic Environment: Constraint Programming Model, Mixed-Integer Programming Model, and Dispatching Rules
inferredcites →https://doi.org/10.1115/imece2004-62600openalex-snapshot
An Environmental Analysis of Machining
inferredcites →https://doi.org/10.1162/evco.1999.7.1.1openalex-snapshot
Production Scheduling and Rescheduling with Genetic Algorithms
inferredcites →https://doi.org/10.1177/0954405415625916openalex-snapshot
Mathematical modeling and a memetic algorithm for the integration of process planning and scheduling considering uncertain processing times
inferredcites →https://doi.org/10.1177/0954405416661006openalex-snapshot
Quantum-inspired hybrid algorithm for integrated process planning and scheduling
inferredcites →https://doi.org/10.1287/mnsc.42.6.797openalex-snapshot
A Fast Taboo Search Algorithm for the Job Shop Problem
inferredcites →https://doi.org/10.1287/opre.8.2.219openalex-snapshot
On the Job-Shop Scheduling Problem
inferredcites →https://doi.org/10.3390/pr4030023openalex-snapshot
Development of Chemical Process Design and Control for Sustainability
inferredcites →https://doi.org/10.3390/pr6030025openalex-snapshot
Using Field Data for Energy Efficiency Based on Maintenance and Operational Optimisation. A Step towards PHM in Process Plants
inferredcites →https://doi.org/10.3390/su9101769openalex-snapshot
Mathematical Modeling and a Hybrid NSGA-II Algorithm for Process Planning Problem Considering Machining Cost and Carbon Emission

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4680116openalex-extracted
Many-Objective Integrated Process Planning and Scheduling: A New Mixed-Integer Linear Programming Model and Genetic Algorithm
inferred← citeshttps://doi.org/10.1007/978-3-031-43612-3_30openalex-snapshot
Minimizing Peak Energy Demand in Flexible Job Shops
inferred← citeshttps://doi.org/10.1007/s00170-019-04776-xopenalex-snapshot
Energy-efficient integration of process planning and scheduling in discrete parts manufacturing with a heuristic-based two-stage approach
inferred← citeshttps://doi.org/10.1007/s11356-023-27081-3openalex-snapshot
Hybrid evolutionary algorithm for stochastic multiobjective disassembly line balancing problem in remanufacturing
inferred← citeshttps://doi.org/10.1016/j.aei.2022.101620openalex-snapshot
An innovative approach for resource sharing and scheduling in a sustainable distributed manufacturing system
inferred← citeshttps://doi.org/10.1016/j.cor.2020.105053openalex-snapshot
Integration of process planning and scheduling for distributed flexible job shops
inferred← citeshttps://doi.org/10.1016/j.engappai.2023.107030openalex-snapshot
A multi-population co-evolutionary algorithm for green integrated process planning and scheduling considering logistics system
inferred← citeshttps://doi.org/10.1016/j.eswa.2024.123908openalex-snapshot
An efficient multi-objective adaptive large neighborhood search algorithm for solving a disassembly line balancing model considering idle rate, smoothness, labor cost, and energy consumption
inferred← citeshttps://doi.org/10.1016/j.jmsy.2020.10.012openalex-snapshot
An investigation into the method of energy monitoring and reduction for machining systems
inferred← citeshttps://doi.org/10.1016/j.swevo.2020.100820openalex-snapshot
A two-stage solution method based on NSGA-II for Green Multi-Objective integrated process planning and scheduling in a battery packaging machinery workshop
inferred← citeshttps://doi.org/10.1109/access.2020.2996496openalex-snapshot
A Neutrosophic Number-Based Memetic Algorithm for the Integrated Process Planning and Scheduling Problem With Uncertain Processing Times
inferred← citeshttps://doi.org/10.1109/mmar55195.2022.9874301openalex-snapshot
Multi-Objective Population-based Optimization Algorithms for Scheduling of Manufacturing Entities
inferred← citeshttps://doi.org/10.1109/tii.2022.3193866openalex-snapshot
An Enhanced Social Engineering Optimizer for Solving an Energy-Efficient Disassembly Line Balancing Problem Based on Bucket Brigades and Cloud Theory
inferred← citeshttps://doi.org/10.1111/itor.13108openalex-snapshot
Shop scheduling in manufacturing environments: a review
inferred← citeshttps://doi.org/10.1155/2021/8081618openalex-snapshot
Integrated Optimization Method of IPPS under TOU and Tiered Electricity Price
inferred← citeshttps://doi.org/10.3390/a18010038openalex-snapshot
A Survey on Variable Neighborhood Search for Sustainable Logistics
inferred← citeshttps://doi.org/10.3390/app11146314openalex-snapshot
A Hybrid Multi-Objective Evolutionary Algorithm-Based Semantic Foundation for Sustainable Distributed Manufacturing Systems
inferred← citeshttps://doi.org/10.3390/electronics8050524openalex-snapshot
Optimal Home Energy Demand Management Based Multi-Criteria Decision Making Methods
inferred← citeshttps://doi.org/10.3390/en13236181openalex-snapshot
Multi-Objective Optimization of Integrated Process Planning and Scheduling Considering Energy Savings
inferred← citeshttps://doi.org/10.3390/en15093013openalex-snapshot
A Simulation Model of Power Demand Management by Manufacturing Enterprises under the Conditions of Energy Sector Transformation
inferred← citeshttps://doi.org/10.3390/pr7060377openalex-snapshot
Design and Optimization of a Process for the Production of Methyl Methacrylate via Direct Methylation
inferred← citeshttps://doi.org/10.3390/pr7120866openalex-snapshot
Numerical Study on Separation Performance of Cyclone Flue Used in Grate Waste Incinerator
inferred← citeshttps://doi.org/10.3390/pr8091126openalex-snapshot
Special Issue on “Energy, Economy and Environment for Industrial Production Processes”
inferred← citeshttps://doi.org/10.3390/sym13040663openalex-snapshot
Disassembly Sequence Planning for Intelligent Manufacturing Using Social Engineering Optimizer
inferred← citeshttps://doi.org/10.4018/978-1-7998-4939-1.ch005openalex-snapshot
Evaluating the Influence of Energy Consumption on Process Plan Attributes
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.