On the public citation graph

Solving a robust real-life multi-skill resource-constrained multi-projects cheduling problem

0 signed · 57 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/net.3230180206openalex-snapshot
Computational complexity of PERT problems
inferredcites →https://doi.org/10.1007/978-3-319-05915-0_7openalex-snapshot
The Stochastic Resource-Constrained Project Scheduling Problem
inferredcites →https://doi.org/10.1007/bf01719451openalex-snapshot
Tabu search for the job-shop scheduling problem with multi-purpose machines
inferredcites →https://doi.org/10.1007/s10479-023-05784-7openalex-snapshot
Solving a real-life multi-skill resource-constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1007/s10696-012-9147-2openalex-snapshot
Robust optimization for resource-constrained project scheduling with uncertain activity durations
inferredcites →https://doi.org/10.1007/s10951-007-0011-2openalex-snapshot
A classification of predictive-reactive project scheduling procedures
inferredcites →https://doi.org/10.1007/s10951-007-0021-0openalex-snapshot
Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
inferredcites →https://doi.org/10.1007/s10951-015-0423-3openalex-snapshot
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
inferredcites →https://doi.org/10.1016/0925-5273(95)00078-8openalex-snapshot
Industrial job-shop scheduling with random operations and different priorities
inferredcites →https://doi.org/10.1016/j.advengsoft.2013.11.004openalex-snapshot
Multi-objective optimization model for multi-project scheduling on critical chain
inferredcites →https://doi.org/10.1016/j.cie.2007.11.017openalex-snapshot
A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling
inferredcites →https://doi.org/10.1016/j.cie.2016.12.040openalex-snapshot
Resource constrained project scheduling with uncertain activity durations
inferredcites →https://doi.org/10.1016/j.cie.2017.10.021openalex-snapshot
On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1016/j.cie.2019.02.039openalex-snapshot
A hybrid multi-objective EDA for robust resource constraint project scheduling with uncertainty
inferredcites →https://doi.org/10.1016/j.cie.2019.106060openalex-snapshot
Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival
inferredcites →https://doi.org/10.1016/j.cie.2023.109261openalex-snapshot
Explainable machine learning for project management control
inferredcites →https://doi.org/10.1016/j.cor.2008.08.008openalex-snapshot
Scheduling with uncertain durations: Modeling -robust scheduling with constraints
inferredcites →https://doi.org/10.1016/j.cor.2018.06.016openalex-snapshot
A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.cor.2020.105104openalex-snapshot
An evolutionary approach for resource constrained project scheduling with uncertain changes
inferredcites →https://doi.org/10.1016/j.ejor.2004.04.002openalex-snapshot
Project scheduling under uncertainty: Survey and research potentials
inferredcites →https://doi.org/10.1016/j.ejor.2006.10.061openalex-snapshot
Proactive heuristic procedures for robust project scheduling: An experimental analysis
inferredcites →https://doi.org/10.1016/j.ejor.2010.05.046openalex-snapshot
Robust scheduling and robustness measures for the discrete time/cost trade-off problem
inferredcites →https://doi.org/10.1016/j.ejor.2011.04.019openalex-snapshot
Proactive policies for the stochastic resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2018.04.025openalex-snapshot
Efficient priority rules for the stochastic resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2019.01.063openalex-snapshot
A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2019.09.052openalex-snapshot
A robust optimization approach for the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2021.05.004openalex-snapshot
An updated survey of variants and extensions of the resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2022.05.049openalex-snapshot
A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2023.07.035openalex-snapshot
Robust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity duration
inferredcites →https://doi.org/10.1016/j.eswa.2016.03.017openalex-snapshot
Priority-based heuristics for the multi-skill resource constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ijpe.2004.04.002openalex-snapshot
A bi-objective model for robust resource-constrained project scheduling
inferredcites →https://doi.org/10.1016/j.ijpe.2004.08.004openalex-snapshot
The use of buffers in project management: The trade-off between stability and makespan
inferredcites →https://doi.org/10.1016/j.ijpe.2006.07.012openalex-snapshot
A note on the paper by M. A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling
inferredcites →https://doi.org/10.1016/j.ijproman.2015.06.012openalex-snapshot
Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques
inferredcites →https://doi.org/10.1016/j.omega.2016.09.009openalex-snapshot
An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
inferredcites →https://doi.org/10.1016/j.procs.2014.09.056openalex-snapshot
An Effective Multi-objective EDA for Robust Resource Constrained Project Scheduling with Uncertain Durations
inferredcites →https://doi.org/10.1016/s0167-6377(99)00016-4openalex-snapshot
Robust solutions of uncertain linear programs
inferredcites →https://doi.org/10.1016/s0377-2217(99)00490-7openalex-snapshot
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
inferredcites →https://doi.org/10.1021/ie501898nopenalex-snapshot
A Comparative Theoretical and Computational Study on Robust Counterpart Optimization: III. Improving the Quality of Robust Solutions
inferredcites →https://doi.org/10.1023/a:1018930406487openalex-snapshot
An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000192openalex-snapshot
Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0001736openalex-snapshot
Machine Learning Algorithms for Construction Projects Delay Risk Prediction
inferredcites →https://doi.org/10.1080/00207543.2018.1504245openalex-snapshot
A novel branch-and-bound algorithm for the chance-constrained resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1080/07408178908966229openalex-snapshot
Effects of Pooling on the Optimization and Service Levels of Two-Location Inventory Systems
inferredcites →https://doi.org/10.1080/07408179708966416openalex-snapshot
β-Robust scheduling for single-machine systems with uncertain processing times
inferredcites →https://doi.org/10.1080/07408179708966417openalex-snapshot
Local search for nonpreemptive multi-mode resource-constrained project scheduling
inferredcites →https://doi.org/10.1080/21681015.2016.1172522openalex-snapshot
Measuring schedule uncertainty for a stochastic resource-constrained project using scenario-based approach with utility-entropy decision model
inferredcites →https://doi.org/10.1080/21693277.2024.2319574openalex-snapshot
Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review
inferredcites →https://doi.org/10.1109/tase.2022.3195540openalex-snapshot
A Robust Optimization Approach for the Resource Investment Problem of an Aircraft Final Assembly Line
inferredcites →https://doi.org/10.1111/itor.12301openalex-snapshot
A lexicographic approach to the robust resource‐constrained project scheduling problem
inferredcites →https://doi.org/10.1111/itor.13063openalex-snapshot
Heuristic and metaheuristic methods for the multi‐skill project scheduling problem with partial preemption
inferredcites →https://doi.org/10.1111/j.1540-5915.1996.tb00853.xopenalex-snapshot
Effects of Erroneous Estimation of Activity Durations on Scheduling and Dispatching a Single Project
inferredcites →https://doi.org/10.1111/j.1937-5956.2009.01023.xopenalex-snapshot
Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
inferredcites →https://doi.org/10.1287/opre.1030.0065openalex-snapshot
The Price of Robustness
inferredcites →https://doi.org/10.1287/opre.21.5.1154openalex-snapshot
Technical Note—Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear Programming
inferredcites →https://doi.org/10.1561/0200000021openalex-snapshot
Robust Project Scheduling
inferredcites →https://doi.org/10.5267/j.jpm.2018.1.005openalex-snapshot
Resource-constrained project scheduling problem: review of past and recent developments
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.