On the public citation graph

Robust optimization for resource-constrained project scheduling with uncertain activity durations

https://doi.org/10.1007/s10696-012-9147-2
0 signed · 180 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/9780470172377openalex-snapshot
Managing the Unknown
inferredcites →https://doi.org/10.1002/9780470611227.ch3openalex-snapshot
Mathematical Programming Formulations and Lower Bounds
inferredcites →https://doi.org/10.1002/net.20414openalex-snapshot
Resource allocation by means of project networks: Dominance results
inferredcites →https://doi.org/10.1002/net.20415openalex-snapshot
Resource allocation by means of project networks: Complexity results
inferredcites →https://doi.org/10.1002/net.3230130102openalex-snapshot
Preselective strategies for the optimization of stochastic project networks under resource constraints
inferredcites →https://doi.org/10.1007/978-1-4615-6089-0openalex-snapshot
Tabu Search
inferredcites →https://doi.org/10.1007/978-1-4757-2620-6openalex-snapshot
Robust Discrete Optimization and Its Applications
inferredcites →https://doi.org/10.1007/978-1-4899-3472-7_8openalex-snapshot
Statistical reasoning
inferredcites →https://doi.org/10.1007/978-3-540-24800-2openalex-snapshot
Project Scheduling with Time Windows and Scarce Resources
inferredcites →https://doi.org/10.1007/978-3-540-78484-5openalex-snapshot
Discrete Optimization with Interval Data : Minmax Regret and Fuzzy Approach
inferredcites →https://doi.org/10.1007/978-3-662-22341-3openalex-snapshot
Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions
inferredcites →https://doi.org/10.1007/b101924openalex-snapshot
Project Scheduling: A Research Handbook
inferredcites →https://doi.org/10.1007/pl00011380openalex-snapshot
Robust solutions of Linear Programming problems contaminated with uncertain data
inferredcites →https://doi.org/10.1007/s10107-003-0396-4openalex-snapshot
Robust discrete optimization and network flows
inferredcites →https://doi.org/10.1007/s10107-004-0512-0openalex-snapshot
On the generation of circuits and minimal forbidden sets
inferredcites →https://doi.org/10.1007/s101070100286openalex-snapshot
Robust optimization ? methodology and applications
inferredcites →https://doi.org/10.1007/s10852-006-9044-3openalex-snapshot
A Mixed Integer Programming Formulation for the Total Flow Time Single Machine Robust Scheduling Problem with Interval Data
inferredcites →https://doi.org/10.1007/s10951-009-0143-7openalex-snapshot
New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
inferredcites →https://doi.org/10.1007/s10957-007-9334-6openalex-snapshot
Min-Max Regret Robust Optimization Approach on Interval Data Uncertainty
inferredcites →https://doi.org/10.1016/0166-218x(83)90012-4openalex-snapshot
Scheduling subject to resource constraints: classification and complexity
inferredcites →https://doi.org/10.1016/0377-2217(95)00357-6openalex-snapshot
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
inferredcites →https://doi.org/10.1016/b978-0-444-87358-3.50019-5openalex-snapshot
RESOURCE ALLOCATION IN A NETWORK MODEL - THE LEINET SYSTEM
inferredcites →https://doi.org/10.1016/j.cor.2006.10.013openalex-snapshot
Scenario relaxation algorithm for finite scenario-based min–max regret and min–max relative regret robust optimization
inferredcites →https://doi.org/10.1016/j.dam.2005.04.015openalex-snapshot
Complexity of minimizing the total flow time with interval data and minmax regret criterion
inferredcites →https://doi.org/10.1016/j.disopt.2005.07.001openalex-snapshot
Computing and minimizing the relative regret in combinatorial optimization with interval data
inferredcites →https://doi.org/10.1016/j.disopt.2006.12.002openalex-snapshot
Computing robust basestock levels
inferredcites →https://doi.org/10.1016/j.ejor.2008.09.012openalex-snapshot
Min–max and min–max regret versions of combinatorial optimization problems: A survey
inferredcites →https://doi.org/10.1016/s0166-218x(03)00462-1openalex-snapshot
Interval data minmax regret network optimization problems
inferredcites →https://doi.org/10.1016/s0167-6377(00)00025-0openalex-snapshot
Minmax regret solutions for minimax optimization problems with uncertainty
inferredcites →https://doi.org/10.1016/s0167-6377(99)00016-4openalex-snapshot
Robust solutions of uncertain linear programs
inferredcites →https://doi.org/10.1016/s0305-0483(00)00046-3openalex-snapshot
An integrated survey of deterministic project scheduling
inferredcites →https://doi.org/10.1016/s0377-2217(02)00758-0openalex-snapshot
Insertion techniques for static and dynamic resource-constrained project scheduling
inferredcites →https://doi.org/10.1016/s0377-2217(99)00496-8openalex-snapshot
A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
inferredcites →https://doi.org/10.1023/a:1010945830113openalex-snapshot
A Computational Study on Bounding the Makespan Distribution in Stochastic Project Networks
inferredcites →https://doi.org/10.1023/a:1022283403119openalex-snapshot
RanGen: A Random Network Generator for Activity-on-the-Node Networks
inferredcites →https://doi.org/10.1038/sj/jors/0460109openalex-snapshot
Criticality in Resource Constrained Networks
inferredcites →https://doi.org/10.1057/jors.1972.72openalex-snapshot
Robustness and Optimality as Criteria for Strategic Decisions
inferredcites →https://doi.org/10.1057/jors.1995.9openalex-snapshot
Criticality in Resource Constrained Networks
inferredcites →https://doi.org/10.1080/01621459.1951.10500768openalex-snapshot
The Theory of Statistical Decision
inferredcites →https://doi.org/10.1080/03155986.1989.11732098openalex-snapshot
A Classified Bibliography Of Research On Stochastic Pert Networks: 1966-1987
inferredcites →https://doi.org/10.1080/07408170008963918openalex-snapshot
Robust scheduling of a two-machine flow shop with uncertain processing times
inferredcites →https://doi.org/10.1080/07408170490447348openalex-snapshot
Stability and resource allocation in project planning
inferredcites →https://doi.org/10.1111/j.1937-5956.2009.01023.xopenalex-snapshot
Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
inferredcites →https://doi.org/10.1214/aoms/1177730030openalex-snapshot
Statistical Decision Functions
inferredcites →https://doi.org/10.1287/mnsc.38.12.1803openalex-snapshot
A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
inferredcites →https://doi.org/10.1287/mnsc.41.2.363openalex-snapshot
Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
inferredcites →https://doi.org/10.1287/opre.1030.0065openalex-snapshot
The Price of Robustness
inferredcites →https://doi.org/10.1287/opre.34.5.769openalex-snapshot
Markov and Markov-Regenerative pert Networks
inferredcites →https://doi.org/10.1287/opre.43.2.264openalex-snapshot
Robust Optimization of Large-Scale Systems
inferredcites →https://doi.org/10.1287/opre.7.5.646openalex-snapshot
Application of a Technique for Research and Development Program Evaluation
inferredcites →https://doi.org/10.14279/depositonce-398openalex-snapshot
Stochastic resource-constrained project scheduling
inferredcites →https://doi.org/10.2307/1391565openalex-snapshot
Decision Theory: An Introduction to the Mathematics of Rationality
inferredcites →https://doi.org/10.2307/2288951openalex-snapshot
Decision Theory: An Introduction to the Mathematics of Rationality.
inferredcites →https://doi.org/10.2307/2290362openalex-snapshot
Statistical Reasoning With Imprecise Probabilities
inferredcites →https://doi.org/10.2307/2551889openalex-snapshot
Applications of Mathematical Programming Techniques.
inferredcites →https://doi.org/10.2307/3010157openalex-snapshot
Robust Discrete Optimization and Its Applications.

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.2724501openalex-extracted
New Benchmark Results for the Stochastic Resource-Constrained Project Scheduling Problem
inferred← citeshttps://doi.org/10.2139/ssrn.2976350openalex-extracted
The Proactive and Reactive Resource-Constrained Project Scheduling Problem: The Crucial Role of Buffer-Based Reactions
inferred← citeshttps://doi.org/10.2139/ssrn.4471654openalex-extracted
Multiskill Resource Constrained Project Scheduling Model Considering Tardiness Ignorance
inferred← citeshttps://doi.org/10.2139/ssrn.4760922openalex-extracted
A Matheuristic-Oriented Iterated Greedy Algorithm for Multi-Mode Resource-Constrained Project Scheduling Problem Under Uncertainty
inferred← citeshttps://doi.org/10.1007/978-3-030-81123-5_3openalex-snapshot
Optimization for Project Scheduling
inferred← citeshttps://doi.org/10.1007/978-3-031-13397-8_4openalex-snapshot
Robust Optimisation for Multiple Medical Service Project Scheduling Considering the Uncertainty of Activity Durations and Resource Allocation
inferred← citeshttps://doi.org/10.1007/978-3-031-82481-4_26openalex-snapshot
Augmented Human-AI Forecasting for Ship Refit Project Scheduling: A Predict-then-Optimize Approach
inferred← citeshttps://doi.org/10.1007/978-3-319-05915-0_13openalex-snapshot
Further Research Opportunities in Project Management
inferred← citeshttps://doi.org/10.1007/978-3-319-05915-0_9openalex-snapshot
Robust Optimization for the Discrete Time-Cost Tradeoff Problem with Cost Uncertainty
inferred← citeshttps://doi.org/10.1007/978-3-319-10428-7_23openalex-snapshot
A Declarative Paradigm for Robust Cumulative Scheduling
inferred← citeshttps://doi.org/10.1007/978-3-319-29504-6_6openalex-snapshot
Scenario-Based Evolutionary Approach for Robust RCPSP
inferred← citeshttps://doi.org/10.1007/978-3-319-50920-4_9openalex-snapshot
Multi-Agent Optimization of Resource-Constrained Project Scheduling Problem Using Nature-Inspired Computing
inferred← citeshttps://doi.org/10.1007/978-3-319-91479-4_19openalex-snapshot
A Comparative Analysis of Accurate and Robust Bi-objective Scheduling Heuristics for Datacenters
inferred← citeshttps://doi.org/10.1007/978-3-319-94196-7_51openalex-snapshot
Resource Constrained Multi-project Scheduling: Application in Software Company
inferred← citeshttps://doi.org/10.1007/978-3-319-95711-1_72openalex-snapshot
Configuring and Optimizing the Maintenance Support Resource Based on a Double Layer Algorithm
inferred← citeshttps://doi.org/10.1007/978-981-10-1837-4_88openalex-snapshot
Advances in Hybrid Metaheuristics for Stochastic Manufacturing Scheduling: Part I Models and Methods
inferred← citeshttps://doi.org/10.1007/s00500-021-06147-9openalex-snapshot
A resource flow-based branch-and-bound algorithm to solve fuzzy stochastic resource-constrained project scheduling problem
inferred← citeshttps://doi.org/10.1007/s00500-021-06399-5openalex-snapshot
Constraint programming-based transformation approach for a mixed fuzzy-stochastic resource investment project scheduling problem
inferred← citeshttps://doi.org/10.1007/s10479-018-2899-7openalex-snapshot
Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
inferred← citeshttps://doi.org/10.1007/s10479-023-05403-5openalex-snapshot
A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
inferred← citeshttps://doi.org/10.1007/s10479-023-05537-6openalex-snapshot
Exact and heuristic methods for Anchor-Robust and Adjustable-Robust RCPSP
inferred← citeshttps://doi.org/10.1007/s10479-024-05854-4openalex-snapshot
A robust multi-project scheduling problem under a resource dedication-transfer policy
inferred← citeshttps://doi.org/10.1007/s10479-026-07092-2openalex-snapshot
Sample average approximation for the stochastic resource-constrained project scheduling problem with flexible resource profiles
inferred← citeshttps://doi.org/10.1007/s10696-018-9316-zopenalex-snapshot
A branch-and-bound approach for the single machine maximum lateness stochastic scheduling problem to minimize the value-at-risk
inferred← citeshttps://doi.org/10.1007/s10696-019-09358-3openalex-snapshot
Expected shortfall for the makespan in activity networks under imperfect information
inferred← citeshttps://doi.org/10.1007/s10732-025-09562-5openalex-snapshot
A new, efficient approach to speed up local search by estimating the solution quality: an application to stochastic, parallel machine scheduling
inferred← citeshttps://doi.org/10.1007/s10951-016-0505-xopenalex-snapshot
New strategies for stochastic resource-constrained project scheduling
inferred← citeshttps://doi.org/10.1007/s10951-018-0592-yopenalex-snapshot
Stochastic project management: multiple projects with multi-skilled human resources
inferred← citeshttps://doi.org/10.1007/s12351-017-0321-xopenalex-snapshot
A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem
inferred← citeshttps://doi.org/10.1007/s12351-018-0380-7openalex-snapshot
Single mode resource constrained project scheduling with unreliable resources
inferred← citeshttps://doi.org/10.1007/s12351-023-00750-4openalex-snapshot
A two-phase resource-constrained project scheduling approach for design and development of complex product systems
inferred← citeshttps://doi.org/10.1007/s40092-019-00328-wopenalex-snapshot
Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
inferred← citeshttps://doi.org/10.1016/j.amc.2015.02.092openalex-snapshot
A hybrid simulation-optimization approach for the robust Discrete Time/Cost Trade-off Problem
inferred← citeshttps://doi.org/10.1016/j.autcon.2023.105030openalex-snapshot
Integrated optimization of stochastic resource scheduling and machine maintenance in prefabricated component production processes
inferred← citeshttps://doi.org/10.1016/j.cie.2016.12.040openalex-snapshot
Resource constrained project scheduling with uncertain activity durations
inferred← citeshttps://doi.org/10.1016/j.cie.2017.10.027openalex-snapshot
Scheduling resource-constrained project problem with alternative activity chains
inferred← citeshttps://doi.org/10.1016/j.cie.2019.01.002openalex-snapshot
A branch-and-bound approach to schedule a no-wait flow shop to minimize the CVaR of the residual work content
inferred← citeshttps://doi.org/10.1016/j.cie.2019.04.046openalex-snapshot
Robust resource-constrained project scheduling problem of the project’s subcontractors in a cooperative environment under uncertainty: Social complex construction case study
inferred← citeshttps://doi.org/10.1016/j.cie.2020.106981openalex-snapshot
An event-based reactive scheduling approach for the Resource Constrained Project Scheduling Problem with unreliable resources
inferred← citeshttps://doi.org/10.1016/j.cie.2021.107363openalex-snapshot
Scheduling project with stochastic durations and time-varying resource requests: A metaheuristic approach
inferred← citeshttps://doi.org/10.1016/j.cie.2024.110333openalex-snapshot
A matheuristic-oriented iterated greedy algorithm for multi-mode resource-constrained project scheduling problem under uncertainty
inferred← citeshttps://doi.org/10.1016/j.cie.2024.110752openalex-snapshot
A comparison of different clustering algorithms for the project time buffering problem
inferred← citeshttps://doi.org/10.1016/j.cor.2018.06.016openalex-snapshot
A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
inferred← citeshttps://doi.org/10.1016/j.cor.2021.105232openalex-snapshot
A compact reformulation of the two-stage robust resource-constrained project scheduling problem
inferred← citeshttps://doi.org/10.1016/j.cor.2022.106098openalex-snapshot
Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks
inferred← citeshttps://doi.org/10.1016/j.cor.2023.106453openalex-snapshot
Γ-robust optimization of project scheduling problems
inferred← citeshttps://doi.org/10.1016/j.cor.2025.107215openalex-snapshot
Robust optimization approach for the resource-constrained project scheduling problem with uncertain activity release times
inferred← citeshttps://doi.org/10.1016/j.cor.2026.107637openalex-snapshot
A robust optimization approach for scheduling with uncertain start-time dependent costs
inferred← citeshttps://doi.org/10.1016/j.ejor.2015.05.004openalex-snapshot
Bi-Objective Multi-Mode Project Scheduling Under Risk Aversion
inferred← citeshttps://doi.org/10.1016/j.ejor.2015.11.031openalex-snapshot
Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project
inferred← citeshttps://doi.org/10.1016/j.ejor.2018.05.022openalex-snapshot
Robust allocation of operating rooms: A cutting plane approach to handle lognormal case durations
inferred← citeshttps://doi.org/10.1016/j.ejor.2018.07.037openalex-snapshot
Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems
inferred← citeshttps://doi.org/10.1016/j.ejor.2019.09.052openalex-snapshot
A robust optimization approach for the multi-mode resource-constrained project scheduling problem
inferred← citeshttps://doi.org/10.1016/j.ejor.2025.04.013openalex-snapshot
Reactive scheduling of uncertain jobs with maximum time lags
inferred← citeshttps://doi.org/10.1016/j.eswa.2020.113189openalex-snapshot
An interval-stochastic programming based approach for a fully uncertain multi-objective and multi-mode resource investment project scheduling problem with an application to ERP project implementation
inferred← citeshttps://doi.org/10.1016/j.eswa.2023.122002openalex-snapshot
Robustifying the resource-constrained project scheduling against uncertain durations
inferred← citeshttps://doi.org/10.1016/j.ijpe.2014.07.001openalex-snapshot
A robust R&D project portfolio optimization model for pharmaceutical contract research organizations
inferred← citeshttps://doi.org/10.1016/j.ijpe.2016.07.019openalex-snapshot
Tactical capacity planning in a real-world ETO industry case: A robust optimization approach
inferred← citeshttps://doi.org/10.1016/j.ijpe.2019.107522openalex-snapshot
A classification and review of approaches and methods for modeling uncertainty in projects
inferred← citeshttps://doi.org/10.1016/j.omega.2016.09.009openalex-snapshot
An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
inferred← citeshttps://doi.org/10.1016/j.orl.2022.08.003openalex-snapshot
A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
inferred← citeshttps://doi.org/10.1016/j.procs.2014.09.056openalex-snapshot
An Effective Multi-objective EDA for Robust Resource Constrained Project Scheduling with Uncertain Durations
inferred← citeshttps://doi.org/10.1016/j.sbspro.2016.06.159openalex-snapshot
Modeling and Solving Project Portfolio and Contractor Selection Problem Based on Project Scheduling under Uncertainty
inferred← citeshttps://doi.org/10.1051/ro/2018103openalex-snapshot
Preemptive multi-skilled resource constrained project scheduling problem with hard/soft interval due dates
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0001929openalex-snapshot
RCPSP with Combined Precedence Relations and Resource Calendars
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0001990openalex-snapshot
Resource-Constrained Project Scheduling Problem under Multiple Time Constraints
inferred← citeshttps://doi.org/10.1080/00207543.2018.1504245openalex-snapshot
A novel branch-and-bound algorithm for the chance-constrained resource-constrained project scheduling problem
inferred← citeshttps://doi.org/10.1080/00207543.2018.1552371openalex-snapshot
A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncertainty of activity duration
inferred← citeshttps://doi.org/10.1080/00207543.2019.1636319openalex-snapshot
The integration of resource allocation and time buffering for bi-objective robust project scheduling
inferred← citeshttps://doi.org/10.1080/00207543.2019.1695168openalex-snapshot
A bi-objective robust resource allocation model for the RCPSP considering resource transfer costs
inferred← citeshttps://doi.org/10.1080/01605682.2018.1441636openalex-snapshot
Solving the FS-RCPSP with hyper-heuristics: A policy-driven approach
inferred← citeshttps://doi.org/10.1080/01605682.2020.1718558openalex-snapshot
Resource flow network generation algorithm in robust project scheduling
inferred← citeshttps://doi.org/10.1080/01605682.2025.2463556openalex-snapshot
A two-stage adjustable robust optimization approach for multi-work package project scheduling problem under uncertain environments
inferred← citeshttps://doi.org/10.1080/01605682.2026.2651219openalex-snapshot
A two-stage robust optimisation model for multi-project scheduling and material ordering under demand uncertainty
inferred← citeshttps://doi.org/10.1080/0951192x.2023.2228273openalex-snapshot
Proactive project scheduling using GPU-accelerated simulations under uncertainty environment
inferred← citeshttps://doi.org/10.1080/10429247.2022.2030179openalex-snapshot
Project Schedule Expediting under Structural and Parametric Uncertainty
inferred← citeshttps://doi.org/10.1080/17509653.2026.2706585openalex-snapshot
A framework for project sustainability assessment and schedule optimization in multi-mode construction projects
inferred← citeshttps://doi.org/10.1080/21681015.2016.1140089openalex-snapshot
Preemption resource-constrained project scheduling problems with fuzzy random duration and resource availabilities
inferred← citeshttps://doi.org/10.1108/imds-01-2019-0002openalex-snapshot
Activity scheduling and resource allocation with uncertainties and learning in activities
inferred← citeshttps://doi.org/10.1109/access.2021.3063766openalex-snapshot
Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach
inferred← citeshttps://doi.org/10.1109/iccp.2015.7312610openalex-snapshot
Skill-oriented priority scheduling for solving the Resource Constrained Project Scheduling Problem
inferred← citeshttps://doi.org/10.1109/icdcs.2016.95openalex-snapshot
RUSH: A RobUst ScHeduler to Manage Uncertain Completion-Times in Shared Clouds
inferred← citeshttps://doi.org/10.1109/icrse.2015.7366521openalex-snapshot
The robust optimization method of aircraft fleet scheduling under uncertain operational support time
inferred← citeshttps://doi.org/10.1109/ieem.2011.6117887openalex-snapshot
Robust optimization for resource-constrained project scheduling with uncertain activity durations
inferred← citeshttps://doi.org/10.1109/ieem.2015.7385637openalex-snapshot
New benchmark results for the stochastic resource-constrained project scheduling problem
inferred← citeshttps://doi.org/10.1109/ieem.2016.7798166openalex-snapshot
Robust Resource Investment Problem with Time-Dependent Resource Cost and Tardiness Penalty
inferred← citeshttps://doi.org/10.1109/ieem45057.2020.9309878openalex-snapshot
Robust Optimization Based Heuristic Approach for Solving Stochastic Multi-Mode Resource Constrained Project Scheduling Problem
inferred← citeshttps://doi.org/10.1109/iesm45758.2019.8948221openalex-snapshot
Resource Constrained Project Proactive Scheduling to Minimize Uncertainty Cost Considering Information handling
inferred← citeshttps://doi.org/10.1109/noms47738.2020.9110298openalex-snapshot
Network Service Mapping and Scheduling under Uncertain Processing Time
inferred← citeshttps://doi.org/10.1109/tase.2022.3151611openalex-snapshot
Robust Optimization on Unrelated Parallel Machine Scheduling With Setup Times
inferred← citeshttps://doi.org/10.1109/tase.2022.3195540openalex-snapshot
A Robust Optimization Approach for the Resource Investment Problem of an Aircraft Final Assembly Line
inferred← citeshttps://doi.org/10.1109/temscon.2018.8488454openalex-snapshot
Robust Project Planning under Resource Constraints
inferred← citeshttps://doi.org/10.1109/tpwrs.2020.3041900openalex-snapshot
Dynamic Repair Scheduling for Transmission Systems Based on Look-Ahead Strategy Approximation
inferred← citeshttps://doi.org/10.1111/exsy.70051openalex-snapshot
Enhancing Analytic Hierarchy Process Modelling Under Uncertainty With Fine‐Tuning LLM
inferred← citeshttps://doi.org/10.1142/s0217595919500106openalex-snapshot
The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework
inferred← citeshttps://doi.org/10.1155/2020/3154047openalex-snapshot
Reactive Strategies in the Multiproject Scheduling with Multifactor Disruptions
inferred← citeshttps://doi.org/10.1155/2021/5595354openalex-snapshot
Research on Reasoning concerning Emergency Measures for Industrial Project Scheduling Control
inferred← citeshttps://doi.org/10.1177/10591478241276927openalex-snapshot
Framing Inclusive Practice Options for Financial, Operational, and Community Outcomes
inferred← citeshttps://doi.org/10.1287/ijoc.2021.0138openalex-snapshot
Overload-Checking and Edge-Finding for Robust Cumulative Scheduling
inferred← citeshttps://doi.org/10.1541/ieejeiss.137.957openalex-snapshot
Robust Optimization Method based on Hybridization of GA and MMEDA for Resource Constraint Project Scheduling with Uncertainty
inferred← citeshttps://doi.org/10.1590/0103-6513.001417openalex-snapshot
An optimisation approach for capacity planning: modelling insights and empirical findings from a tactical perspective
inferred← citeshttps://doi.org/10.1609/icaps.v25i1.13690openalex-snapshot
Ground and Onboard Decision-Making on Satellite Data Downloads
inferred← citeshttps://doi.org/10.17771/pucrio.acad.32733openalex-snapshot
EFFECTIVE RESOURCE ALLOCATION FOR PLANNING AND CONTROL PROJECT PORTFOLIOS UNDER UNCERTAINTY: A ROBUST OPTIMIZATION APPROACH
inferred← citeshttps://doi.org/10.17771/pucrio.acad.37813openalex-snapshot
TACTICAL CAPACITY PLANNING IN AN ETO PRODUCTION SETTING USING OPTIMIZATION MODELS: A REAL-WORLD INDUSTRIAL CONTEXT
inferred← citeshttps://doi.org/10.2139/ssrn.6104648openalex-snapshot
Solving a robust real-life multi-skill resource-constrained multi-projects cheduling problem
inferred← citeshttps://doi.org/10.2139/ssrn.7345321openalex-snapshot
Two-stage Adaptive Robust Resource-constrained Project Scheduling Problem: New Formulations, Algorithms, and Performance Analysis
inferred← citeshttps://doi.org/10.2139/ssrn.7347358openalex-snapshot
Pareto Efficiency in the Two-stage Adaptive Robust Resource-constrained Project Scheduling Problem
inferred← citeshttps://doi.org/10.24200/sci.2019.21387openalex-snapshot
Integrated bi-objective project selection and scheduling using Bayesian Networks: A risk- based approach
inferred← citeshttps://doi.org/10.2478/jeppm-2021-0012openalex-snapshot
Scheduling of Post-Flood Recovery Project with Flexible Project Structure
inferred← citeshttps://doi.org/10.2514/1.i010383openalex-snapshot
Adaptable Data Download Schedules for Agile Earth-Observing Satellites
inferred← citeshttps://doi.org/10.3390/app12063034openalex-snapshot
A Robust Scheduling Framework for Re-Manufacturing Activities of Turbine Blades
inferred← citeshttps://doi.org/10.3390/buildings16163266openalex-snapshot
Sustainable Integrated Project Control for Prefabricated Construction: A Synchronization-Loss Metric Linking Multi-Stage Scheduling, Cost, and Delivery Risk
inferred← citeshttps://doi.org/10.37266/iser.2014v2i1.pp52-61openalex-snapshot
Decision Support System for Production Planning in the Ship Repair Industry
inferred← citeshttps://doi.org/10.3926/jiem.2492openalex-snapshot
The project scheduling problem with non-deterministic activities duration: A literature review
inferred← citeshttps://doi.org/10.5121/csit.2016.60200openalex-snapshot
Computer Science & Information Technology ( CS & IT )
inferred← citeshttps://doi.org/10.5121/csit.2016.60212openalex-snapshot
Grasp Approach to RCPSP with MinMax Robustness Objective
inferred← citeshttps://doi.org/10.5121/ijsea.2016.7205openalex-snapshot
Robust Optimization for RCPSP Under Uncertainty
inferred← citeshttps://doi.org/10.5445/ir/1000052683openalex-snapshot
Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty
inferred← citeshttps://doi.org/10.5505/pajes.2019.10734openalex-snapshot
An Interval Programming Based Approach for fully uncertain Resource-Constrained Project Scheduling Problem Considering Project Manager’s Attitude toward Risk
inferred← citeshttps://doi.org/10.59254/sbpo-2018-85443openalex-snapshot
Robust optimization for tactical capacity planning in ETO industry subject to uncertain costs
inferred← citeshttps://doi.org/10.5935/978-85-7042-007-7.2018b001openalex-snapshot
Métodos Quantitativos - Pesquisa Operacional - Volume 2
inferred← citeshttps://doi.org/10.70675/42261a8bz73c5z43a5zb0abz6a55aea42799openalex-snapshot
Anchored solutions in robust combinatorial optimization
inferred← citeshttps://doi.org/10.70675/60e246d3z8ba7z4330za26cza4845012e105openalex-snapshot
Conception et gestion d'un réseau logistique de recharge pour véhicules électriques centré solaire
inferred← citeshttps://doi.org/10.70675/e4339ac1zc7b0z427czadb4z6757f717ee0bopenalex-snapshot
Méthodes d'optimisation robuste pour les problèmes d'ordonnancement cyclique
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.