Two-stage Adaptive Robust Resource-constrained Project Scheduling Problem: New Formulations, Algorithms, and Performance Analysis

0 signed · 46 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/net.3230130102openalex-snapshot
Preselective strategies for the optimization of stochastic project networks under resource constraints
inferredcites →https://doi.org/10.1002/net.3230130103openalex-snapshot
Algorithmic approaches to preselective strategies for stochastic scheduling problems
inferredcites →https://doi.org/10.1007/978-1-4614-0237-4openalex-snapshot
Introduction to Stochastic Programming
inferredcites →https://doi.org/10.1007/s10107-003-0375-9openalex-snapshot
Logic-based Benders decomposition
inferredcites →https://doi.org/10.1007/s10107-003-0454-yopenalex-snapshot
Adjustable robust solutions of uncertain linear programs
inferredcites →https://doi.org/10.1007/s10107-004-0512-0openalex-snapshot
On the generation of circuits and minimal forbidden sets
inferredcites →https://doi.org/10.1007/s10479-023-05537-6openalex-snapshot
Exact and heuristic methods for Anchor-Robust and Adjustable-Robust RCPSP
inferredcites →https://doi.org/10.1007/s10696-012-9147-2openalex-snapshot
Robust optimization for resource-constrained project scheduling with uncertain activity durations
inferredcites →https://doi.org/10.1007/s10696-012-9152-5openalex-snapshot
Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources
inferredcites →https://doi.org/10.1007/s10951-007-0011-2openalex-snapshot
A classification of predictive-reactive project scheduling procedures
inferredcites →https://doi.org/10.1007/s10951-007-0021-0openalex-snapshot
Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
inferredcites →https://doi.org/10.1007/s10951-015-0421-5openalex-snapshot
Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
inferredcites →https://doi.org/10.1007/s10951-016-0505-xopenalex-snapshot
New strategies for stochastic resource-constrained project scheduling
inferredcites →https://doi.org/10.1016/0165-0114(94)90211-9openalex-snapshot
Fuzzy project scheduling system for software development
inferredcites →https://doi.org/10.1016/0166-218x(83)90012-4openalex-snapshot
Scheduling subject to resource constraints: classification and complexity
inferredcites →https://doi.org/10.1016/0167-6377(93)90002-xopenalex-snapshot
The integer L-shaped method for stochastic integer programs with complete recourse
inferredcites →https://doi.org/10.1016/0377-2217(93)90062-ropenalex-snapshot
The project scheduling polyhedron: Dimension, facets and lifting theorems
inferredcites →https://doi.org/10.1016/j.cie.2006.10.002openalex-snapshot
Heuristic Procedures for Reactive Project Scheduling
inferredcites →https://doi.org/10.1016/j.cor.2010.01.001openalex-snapshot
Reactive scheduling in the multi-mode RCPSP
inferredcites →https://doi.org/10.1016/j.cor.2018.06.016openalex-snapshot
A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.cor.2021.105232openalex-snapshot
A compact reformulation of the two-stage robust resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2004.04.002openalex-snapshot
Project scheduling under uncertainty: Survey and research potentials
inferredcites →https://doi.org/10.1016/j.ejor.2006.10.061openalex-snapshot
Proactive heuristic procedures for robust project scheduling: An experimental analysis
inferredcites →https://doi.org/10.1016/j.ejor.2013.09.036openalex-snapshot
Recent advances in robust optimization: An overview
inferredcites →https://doi.org/10.1016/j.ejor.2016.12.005openalex-snapshot
The Benders decomposition algorithm: A literature review
inferredcites →https://doi.org/10.1016/j.ejor.2018.08.031openalex-snapshot
A survey of adjustable robust optimization
inferredcites →https://doi.org/10.1016/j.ejor.2019.09.052openalex-snapshot
A robust optimization approach for the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2020.12.004openalex-snapshot
Solving integrated operating room planning and scheduling: Logic-based Benders decomposition versus Branch-Price-and-Cut
inferredcites →https://doi.org/10.1016/j.ejor.2021.02.034openalex-snapshot
Dominance-based linear formulation for the Anchor-Robust Project Scheduling Problem
inferredcites →https://doi.org/10.1016/j.engappai.2012.07.012openalex-snapshot
Project scheduling under uncertainty using fuzzy modelling and solving techniques
inferredcites →https://doi.org/10.1016/j.ijpe.2004.08.004openalex-snapshot
The use of buffers in project management: The trade-off between stability and makespan
inferredcites →https://doi.org/10.1016/j.ijproman.2016.06.006openalex-snapshot
Six decades of project management research: Thematic trends and future opportunities
inferredcites →https://doi.org/10.1016/j.omega.2014.12.006openalex-snapshot
A practical guide to robust optimization
inferredcites →https://doi.org/10.1016/j.omega.2016.09.009openalex-snapshot
An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
inferredcites →https://doi.org/10.1016/j.orl.2008.09.010openalex-snapshot
Duality in robust optimization: Primal worst equals dual best
inferredcites →https://doi.org/10.1016/j.orl.2013.05.003openalex-snapshot
Solving two-stage robust optimization problems using a column-and-constraint generation method
inferredcites →https://doi.org/10.1016/j.orl.2022.08.003openalex-snapshot
A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/s0377-2217(02)00758-0openalex-snapshot
Insertion techniques for static and dynamic resource-constrained project scheduling
inferredcites →https://doi.org/10.1016/s0377-2217(96)00170-1openalex-snapshot
PSPLIB - A project scheduling problem library
inferredcites →https://doi.org/10.1016/s0377-2217(96)00401-8openalex-snapshot
Accelerating the regularized decomposition method for two stage stochastic linear problems
inferredcites →https://doi.org/10.1017/cbo9780511804441openalex-snapshot
Convex Optimization
inferredcites →https://doi.org/10.1137/0201008openalex-snapshot
The Transitive Reduction of a Directed Graph
inferredcites →https://doi.org/10.1137/1.9780898718799openalex-snapshot
Applications of Stochastic Programming
inferredcites →https://doi.org/10.1287/mnsc.41.10.1693openalex-snapshot
Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
inferredcites →https://doi.org/10.1287/opre.1030.0065openalex-snapshot
The Price of Robustness
inferredcites →https://doi.org/10.1504/ijsoi.2009.023421openalex-snapshot
A robust optimisation approach to project scheduling and resource allocation
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.