On the public citation graph
AI-Driven Risk-Aware Scheduling for High-Speed Rail Construction: A Deep Learning and Graph Attention Framework
0 signed · 26 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1007/s10462-023-10562-9openalex-snapshot
A survey of uncertainty in deep neural networks
inferredcites →https://doi.org/10.1007/s10845-014-0980-xopenalex-snapshot
Uncertain project scheduling problem with resource constraints
inferredcites →https://doi.org/10.1016/0166-218x(83)90012-4openalex-snapshot
Scheduling subject to resource constraints: classification and complexity
inferredcites →https://doi.org/10.1016/j.ejor.2011.03.019openalex-snapshot
Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
inferredcites →https://doi.org/10.1016/j.ejor.2011.07.054openalex-snapshot
Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation
inferredcites →https://doi.org/10.1016/j.ejor.2019.09.052openalex-snapshot
A robust optimization approach for the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2024.02.041openalex-snapshot
A genetic algorithm for the Resource-Constrained Project Scheduling Problem with Alternative Subgraphs using a boolean satisfiability solver
inferredcites →https://doi.org/10.1016/j.ijpe.2019.107522openalex-snapshot
A classification and review of approaches and methods for modeling uncertainty in projects
inferredcites →https://doi.org/10.1016/j.measurement.2024.115717openalex-snapshot
Advanced regression model fitting to experimental results in case of the effect of grinding conditions on a cutting force with the planer technical knives
inferredcites →https://doi.org/10.1016/j.orl.2009.10.006openalex-snapshot
Scheduling Markovian PERT networks to maximize the net present value
inferredcites →https://doi.org/10.1016/s0305-0483(97)00002-9openalex-snapshot
New validations of PERT times
inferredcites →https://doi.org/10.1016/s0377-2217(96)00170-1openalex-snapshot
PSPLIB - A project scheduling problem library
inferredcites →https://doi.org/10.1038/s41598-025-24125-1openalex-snapshot
Risk-indexed artificial neural network for predicting duration and cost of irrigation canal-lining projects using survey-based calibration and python validation
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0001929openalex-snapshot
RCPSP with Combined Precedence Relations and Resource Calendars
inferredcites →https://doi.org/10.1061/(asce)cp.1943-5487.0000342openalex-snapshot
BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps
inferredcites →https://doi.org/10.1061/jcemd4.coeng-15827openalex-snapshot
Multiobjective Ant Colony System Algorithm for Component-Level Construction Schedule Optimization
inferredcites →https://doi.org/10.1080/00207543.2012.674651openalex-snapshot
Looking for the best modes helps solving the MRCPSP/max
inferredcites →https://doi.org/10.1109/lra.2020.2974682openalex-snapshot
A General Framework for Uncertainty Estimation in Deep Learning
inferredcites →https://doi.org/10.1109/tevc.2013.2281535openalex-snapshot
An Evolutionary Many-Objective Optimization Algorithm Using Reference-Point-Based Nondominated Sorting Approach, Part I: Solving Problems With Box Constraints
inferredcites →https://doi.org/10.1111/itor.12644openalex-snapshot
Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic
inferredcites →https://doi.org/10.1111/mice.12356openalex-snapshot
The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
inferredcites →https://doi.org/10.1111/mice.12917openalex-snapshot
Scenario‐oriented repetitive project scheduling optimization
inferredcites →https://doi.org/10.1177/875697280203300403openalex-snapshot
Project Schedule Uncertainty Analysis using Fuzzy Logic
inferredcites →https://doi.org/10.3390/ijerph16245024openalex-snapshot
Combining Monte Carlo Simulation and Bayesian Networks Methods for Assessing Completion Time of Projects under Risk
inferredcites →https://doi.org/10.3390/s24165301openalex-snapshot
Air Traffic Controller Workload Detection Based on EEG Signals
inferredcites →https://doi.org/10.36680/j.itcon.2026.029openalex-snapshot
A novel framework for structuring and automating schedule-ready data from BIM for advanced construction scheduling
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.