Scenario‐oriented repetitive project scheduling optimization
0 signed · 106 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1007/978-94-007-6256-5_6openalex-snapshot
Success Traits for a Construction Project
inferredcites →https://doi.org/10.1007/978-94-017-8044-5_10openalex-snapshot
Optimizations in Project Scheduling: A State-of-Art Survey
inferredcites →https://doi.org/10.1007/s00158-017-1835-9openalex-snapshot
Many-objective control optimization of high-rise building structures using replicator dynamics and neural dynamics model
inferredcites →https://doi.org/10.1016/j.advengsoft.2007.08.002openalex-snapshot
Genetic algorithm-based multi-objective model for scheduling of linear construction projects
inferredcites →https://doi.org/10.1016/j.amc.2010.05.056openalex-snapshot
Experimental evaluation of simulated annealing algorithms for the time–cost trade-off problem
inferredcites →https://doi.org/10.1016/j.asoc.2019.105533openalex-snapshot
Multi-mode resource constrained project scheduling and contractor selection: Mathematical formulation and metaheuristic algorithms
inferredcites →https://doi.org/10.1016/j.asoc.2019.105887openalex-snapshot
Discrete Spider Monkey Optimization for Travelling Salesman Problem
inferredcites →https://doi.org/10.1016/j.autcon.2012.11.014openalex-snapshot
Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
inferredcites →https://doi.org/10.1016/j.autcon.2014.04.005openalex-snapshot
Multi-objective genetic optimization for scheduling a multi-storey building
inferredcites →https://doi.org/10.1016/j.autcon.2016.08.038openalex-snapshot
MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm
inferredcites →https://doi.org/10.1016/j.autcon.2017.12.024openalex-snapshot
Minimizing duration and crew work interruptions of repetitive construction projects
inferredcites →https://doi.org/10.1016/j.autcon.2018.09.009openalex-snapshot
Time-cost tradeoff analysis with minimized project financing cost
inferredcites →https://doi.org/10.1016/j.autcon.2019.03.020openalex-snapshot
Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects
inferredcites →https://doi.org/10.1016/j.cie.2018.01.012openalex-snapshot
Time Cost Quality Trade-off Problems: A survey exploring the assessment of quality
inferredcites →https://doi.org/10.1016/j.cor.2014.04.003openalex-snapshot
A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations
inferredcites →https://doi.org/10.1016/j.cor.2018.11.011openalex-snapshot
The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models
inferredcites →https://doi.org/10.1016/j.ejor.2010.03.037openalex-snapshot
Project scheduling with finite or infinite number of activity processing modes – A survey
inferredcites →https://doi.org/10.1016/j.ejor.2020.01.013openalex-snapshot
Optimizing temporary work and overtime in the Time Cost Quality Trade-off Problem
inferredcites →https://doi.org/10.1016/j.energy.2019.02.009openalex-snapshot
An improved NSGA-III integrating adaptive elimination strategy to solution of many-objective optimal power flow problems
inferredcites →https://doi.org/10.1016/j.engappai.2014.10.012openalex-snapshot
Shape optimization of free-form steel space-frame roof structures with complex geometries using evolutionary computing
inferredcites →https://doi.org/10.1016/j.eswa.2012.04.019openalex-snapshot
A hybrid genetic algorithm for the discrete time–cost trade-off problem
inferredcites →https://doi.org/10.1016/j.eswa.2019.02.026openalex-snapshot
Optimization of University Course Scheduling Problem using Particle Swarm Optimization with Selective Search
inferredcites →https://doi.org/10.1016/j.ijtst.2016.06.003openalex-snapshot
Optimizing scheduling of long-term highway work zone projects
inferredcites →https://doi.org/10.1016/j.ins.2018.10.005openalex-snapshot
Behavior of crossover operators in NSGA-III for large-scale optimization problems
inferredcites →https://doi.org/10.1016/j.jcde.2017.11.008openalex-snapshot
Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects
inferredcites →https://doi.org/10.1016/j.jclepro.2019.118810openalex-snapshot
Many-objective optimization of technology implementation in the industrial symbiosis system based on a modified NSGA-III
inferredcites →https://doi.org/10.1016/j.knosys.2018.05.015openalex-snapshot
On the importance of isolated infeasible solutions in the many-objective constrained NSGA-III
inferredcites →https://doi.org/10.1016/j.ress.2005.11.018openalex-snapshot
Multi-objective optimization using genetic algorithms: A tutorial
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1997)123:4(450)openalex-snapshot
Scheduling/Cost Optimization and Neural Dynamics Model for Construction
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1998)124:4(263)openalex-snapshot
Linear Scheduling Model: Development of Controlling Activity Path
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2001)127:1(28)openalex-snapshot
Resource Scheduling Using Neural Dynamics Model of Adeli and Park
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2001)127:3(183)openalex-snapshot
Cost Optimization in Projects with Repetitive Nonserial Activities
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2001)127:5(374)openalex-snapshot
Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2005)131:4(477)openalex-snapshot
Time-Cost-Quality Trade-Off Analysis for Highway Construction
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2008)134:4(253)openalex-snapshot
Efficient Repetitive Scheduling for High-Rise Construction
inferredcites →https://doi.org/10.1061/(asce)0742-597x(2006)22:1(11)openalex-snapshot
Optimal Planning and Scheduling for Repetitive Construction Projects
inferredcites →https://doi.org/10.1061/(asce)0893-1321(1994)7:1(104)openalex-snapshot
Augmented Lagrangian Genetic Algorithm for Structural Optimization
inferredcites →https://doi.org/10.1061/(asce)0893-1321(1995)8:3(156)openalex-snapshot
Distributed Genetic Algorithm for Structural Optimization
inferredcites →https://doi.org/10.1061/(asce)1076-0342(2005)11:4(250)openalex-snapshot
Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction/Traffic Analysis
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000167openalex-snapshot
Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0001107openalex-snapshot
Repetitive Scheduling Method: Requirements, Modeling, and Implementation
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0001510openalex-snapshot
Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0001911openalex-snapshot
Enhanced Repetitive-Scheduling Computation and Visualization
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0001979openalex-snapshot
Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0002072openalex-snapshot
Multiobjective Optimization Model for Planning Repetitive Construction Projects
inferredcites →https://doi.org/10.1061/(asce)cp.1943-5487.0000606openalex-snapshot
Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem
inferredcites →https://doi.org/10.1061/(asce)cp.1943-5487.0000718openalex-snapshot
Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems
inferredcites →https://doi.org/10.1061/(asce)me.1943-5479.0000338openalex-snapshot
Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects
inferredcites →https://doi.org/10.1061/(asce)me.1943-5479.0000374openalex-snapshot
Multiobjective Construction Schedule Optimization Using Modified Niched Pareto Genetic Algorithm
inferredcites →https://doi.org/10.1080/00401706.1991.10484810openalex-snapshot
Quality Engineering Using Robust Design
inferredcites →https://doi.org/10.1080/01446190903117793openalex-snapshot
Automated trade‐off between time and cost in planning repetitive construction projects
inferredcites →https://doi.org/10.1080/01446193.2013.845305openalex-snapshot
Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling
inferredcites →https://doi.org/10.1080/01446193.2019.1590615openalex-snapshot
A many-objective optimization model for construction scheduling
inferredcites →https://doi.org/10.1080/15623599.2018.1505027openalex-snapshot
Simultaneous multi-criteria optimization for scheduling linear infrastructure projects
inferredcites →https://doi.org/10.1108/ecam-05-2018-0217openalex-snapshot
Multi-objective optimization for repetitive scheduling under uncertainty
inferredcites →https://doi.org/10.1108/ecam-08-2012-0080openalex-snapshot
Framework for enhanced progress tracking and control of linear projects
inferredcites →https://doi.org/10.1108/ecam-10-2019-0590openalex-snapshot
Optimized crew selection for scheduling of repetitive projects
inferredcites →https://doi.org/10.1109/4235.996017openalex-snapshot
A fast and elitist multiobjective genetic algorithm: NSGA-II
inferredcites →https://doi.org/10.1109/access.2020.3027058openalex-snapshot
Float-Based Resource Leveling Optimization of Linear Projects
inferredcites →https://doi.org/10.1109/iccubea47591.2019.9129081openalex-snapshot
Evolutionary Computing Approaches for Solving Multi-Objective and Many-Objective Optimization Problems: A Review
inferredcites →https://doi.org/10.1109/tcyb.2021.3102642openalex-snapshot
Many-Objective Job-Shop Scheduling: A Multiple Populations for Multiple Objectives-Based Genetic Algorithm Approach
inferredcites →https://doi.org/10.1109/tevc.2013.2281534openalex-snapshot
An Evolutionary Many-Objective Optimization Algorithm Using Reference-Point Based Nondominated Sorting Approach, Part II: Handling Constraints and Extending to an Adaptive Approach
inferredcites →https://doi.org/10.1109/tevc.2013.2281535openalex-snapshot
An Evolutionary Many-Objective Optimization Algorithm Using Reference-Point-Based Nondominated Sorting Approach, Part I: Solving Problems With Box Constraints
inferredcites →https://doi.org/10.1109/tevc.2014.2350987openalex-snapshot
Two_Arch2: An Improved Two-Archive Algorithm for Many-Objective Optimization
inferredcites →https://doi.org/10.1109/tevc.2015.2433266openalex-snapshot
Many-Objective Evolutionary Algorithm: Objective Space Reduction and Diversity Improvement
inferredcites →https://doi.org/10.1109/tevc.2015.2459718openalex-snapshot
A Unified Evolutionary Optimization Procedure for Single, Multiple, and Many Objectives
inferredcites →https://doi.org/10.1109/tevc.2018.2871362openalex-snapshot
Multiphase Balance of Diversity and Convergence in Multiobjective Optimization
inferredcites →https://doi.org/10.1111/exsy.12255openalex-snapshot
Meta‐heuristic multi‐ and many‐objective optimization techniques for solution of machine learning problems
inferredcites →https://doi.org/10.1111/exsy.12357openalex-snapshot
Smart bacteria‐foraging algorithm‐based customized kernel support vector regression and enhanced probabilistic neural network for compaction quality assessment and control of earth‐rock dam
inferredcites →https://doi.org/10.1111/mice.12148openalex-snapshot
An Advanced Stochastic Time‐Cost Tradeoff Analysis Based on a CPM‐Guided Genetic Algorithm
inferredcites →https://doi.org/10.1111/mice.12277openalex-snapshot
Scheduling Optimization of Linear Schedule with Constraint Programming
inferredcites →https://doi.org/10.1111/mice.12356openalex-snapshot
The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
inferredcites →https://doi.org/10.1111/mice.12383openalex-snapshot
Resource Leveling Based on Line of Balance and Constraint Programming
inferredcites →https://doi.org/10.1111/mice.12518openalex-snapshot
Network-level scheduling of road construction projects considering user and business impacts
inferredcites →https://doi.org/10.1111/mice.12547openalex-snapshot
Construction project scheduling under workspace interference
inferredcites →https://doi.org/10.1111/mice.12637openalex-snapshot
Methodology for analyzing the trade‐offs associated with multi‐objective optimization in transportation asset management under uncertainty
inferredcites →https://doi.org/10.1111/mice.12668openalex-snapshot
Stochastic resource leveling optimization method for trading off float consumption and project completion probability
inferredcites →https://doi.org/10.1111/mice.12740openalex-snapshot
Contract bundling considerations in urban road project scheduling
inferredcites →https://doi.org/10.1137/s1052623496307510openalex-snapshot
Normal-Boundary Intersection: A New Method for Generating the Pareto Surface in Nonlinear Multicriteria Optimization Problems
inferredcites →https://doi.org/10.1142/s0218001415390012openalex-snapshot
Harmony Search Algorithm and its Variants
inferredcites →https://doi.org/10.1142/s0218213016300015openalex-snapshot
Simulated Annealing, Its Variants and Engineering Applications
inferredcites →https://doi.org/10.1145/2729974openalex-snapshot
Many-Objective Software Remodularization Using NSGA-III
inferredcites →https://doi.org/10.1201/9781482267686openalex-snapshot
Construction Scheduling, Cost Optimization and Management
inferredcites →https://doi.org/10.3846/13923730.2016.1232306openalex-snapshot
APPLICATIONS OF GRAVITATIONAL SEARCH ALGORITHM IN ENGINEERING
What points at this work
Incoming claims: where this work appears in other papers’ reference lists and arguments.
inferred← citeshttps://doi.org/10.2139/ssrn.4664600openalex-extracted
Optimization of Linear Projects Using Linear Scheduling Method as Scheduling Technique
inferred← citeshttps://doi.org/10.1016/j.autcon.2024.105567openalex-snapshot
Modeling and optimizing linear projects using LSM and Non-dominated Sorting Genetic Algorithm (NSGA-II)
inferred← citeshttps://doi.org/10.1016/j.autcon.2025.106272openalex-snapshot
Cost optimization of repetitive project scheduling through a constraint programming-based relax-and-solve algorithm
inferred← citeshttps://doi.org/10.1016/j.autcon.2026.106957openalex-snapshot
Deep learning and heuristic exploration for risk-aware scheduling in construction projects
inferred← citeshttps://doi.org/10.1016/j.cie.2024.110751openalex-snapshot
Minimizing durations in repetitive projects through adaptive large neighborhood search
inferred← citeshttps://doi.org/10.1016/j.cie.2026.112053openalex-snapshot
Time-cost tradeoff optimization for railway construction project with non-preemptive activity splitting
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-16431openalex-snapshot
A Constrained Planning Method: Considering Storage Space Limitations and Soft Logic for Cruise Cabin Assembly Scheduling
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-17139openalex-snapshot
Time–Cost Trade-Off Optimization in Ultralong Tunnel Construction Based on Working Face Planning
inferred← citeshttps://doi.org/10.1080/0305215x.2023.2215711openalex-snapshot
Dynamic schedule model and algorithm optimization method for linear engineering projects
inferred← citeshttps://doi.org/10.1080/15623599.2026.2724960openalex-snapshot
A multi-objective constraint programming–satisfiability model for non-unit repetitive construction scheduling
inferred← citeshttps://doi.org/10.1109/tem.2024.3394852openalex-snapshot
Reactive Scheduling for Repetitive Projects Based on Integrated Crew Interruption and Soft Logic Strategies
inferred← citeshttps://doi.org/10.1111/mice.13273openalex-snapshot
365‐day sectional work zone schedule optimization for road networks considering economies of scale and user cost
inferred← citeshttps://doi.org/10.1111/mice.13462openalex-snapshot
Short‐term prediction of railway track degradation using ensemble deep learning
inferred← citeshttps://doi.org/10.1111/mice.13483openalex-snapshot
Resource leveling strategy integrating soft logic and crew interruption in repetitive projects
inferred← citeshttps://doi.org/10.1111/mice.70070openalex-snapshot
Supervised parameter updating of deformation analyses for rockfill dams using prior knowledge
inferred← citeshttps://doi.org/10.2139/ssrn.7506403openalex-snapshot
AI-Driven Risk-Aware Scheduling for High-Speed Rail Construction: A Deep Learning and Graph Attention Framework
inferred← citeshttps://doi.org/10.22158/ibes.v6n2p274openalex-snapshot
Review of Research on Uncertain Repetitive Project Scheduling
inferred← citeshttps://doi.org/10.3390/app14062580openalex-snapshot
Optimization of Tunnel Construction Schedule Considering Soft Logic
inferred← citeshttps://doi.org/10.3390/buildings13122944openalex-snapshot
Big Data, Data Science, and Artificial Intelligence for Project Management in the Architecture, Engineering, and Construction Industry: A Systematic Review
inferred← citeshttps://doi.org/10.3390/systems13030168openalex-snapshot
Dynamic Optimization of Tunnel Construction Scheduling in a Reverse Construction Scenario
inferred← citeshttps://doi.org/10.62227/as/74213openalex-snapshot
Optimization Study of Construction Repetitive Project Scheduling Based on Big Data Background
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.