On the public citation graph

Scheduling Optimization of Linear Schedule with Constraint Programming

0 signed · 144 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1002/9780470611227openalex-snapshot
Resource‐Constrained Project Scheduling
inferredcites →https://doi.org/10.1002/9780470912171openalex-snapshot
Construction Project Scheduling and Control
inferredcites →https://doi.org/10.1007/978-1-4614-9056-2openalex-snapshot
Essays in production, project planning and scheduling : a festschrift in honor of Salah Elmaghraby
inferredcites →https://doi.org/10.1007/978-1-4615-5533-9_7openalex-snapshot
Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis
inferredcites →https://doi.org/10.1007/b101924openalex-snapshot
Project Scheduling: A Research Handbook
inferredcites →https://doi.org/10.1016/0045-7949(95)00047-kopenalex-snapshot
A neural dynamics model for structural optimization—Application to plastic design of structures
inferredcites →https://doi.org/10.1016/0045-7949(95)00048-lopenalex-snapshot
A neural dynamics model for structural optimization—Theory
inferredcites →https://doi.org/10.1016/j.autcon.2003.12.005openalex-snapshot
Simulation-based optimization for dynamic resource allocation
inferredcites →https://doi.org/10.1016/j.autcon.2004.11.001openalex-snapshot
Model-based dynamic resource management for construction projects
inferredcites →https://doi.org/10.1016/j.autcon.2006.08.004openalex-snapshot
Optimization model for resource assignment problems of linear construction projects
inferredcites →https://doi.org/10.1016/j.autcon.2007.10.005openalex-snapshot
Evolutionary resource scheduler for linear projects
inferredcites →https://doi.org/10.1016/j.autcon.2008.04.006openalex-snapshot
Resource-constrained construction project scheduling model for profit maximization considering cash flow
inferredcites →https://doi.org/10.1016/j.autcon.2008.11.003openalex-snapshot
A two-phase GA model for resource-constrained project scheduling
inferredcites →https://doi.org/10.1016/j.autcon.2008.11.005openalex-snapshot
A genetic algorithm-based method for scheduling repetitive construction projects
inferredcites →https://doi.org/10.1016/j.autcon.2009.02.001openalex-snapshot
Fuzzy-based MOGA approach to stochastic time–cost trade-off problem
inferredcites →https://doi.org/10.1016/j.autcon.2009.04.007openalex-snapshot
Entropy-based scheduling of resource-constrained construction projects
inferredcites →https://doi.org/10.1016/j.autcon.2010.12.006openalex-snapshot
Metaheuristics for project and construction management – A state-of-the-art review
inferredcites →https://doi.org/10.1016/j.autcon.2011.12.009openalex-snapshot
Optimizing linear project scheduling with multi-skilled crews
inferredcites →https://doi.org/10.1016/j.autcon.2012.05.014openalex-snapshot
Advanced linear scheduling program with varying production rates for pipeline construction projects
inferredcites →https://doi.org/10.1016/j.autcon.2012.11.014openalex-snapshot
Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
inferredcites →https://doi.org/10.1016/j.autcon.2013.09.008openalex-snapshot
Schedule control model for linear projects based on linear scheduling method and constraint programming
inferredcites →https://doi.org/10.1016/j.autcon.2014.03.003openalex-snapshot
A new approach for automation of location-based earthwork scheduling in road construction projects
inferredcites →https://doi.org/10.1016/j.ejor.2004.11.018openalex-snapshot
A multi-objective resource allocation problem in PERT networks
inferredcites →https://doi.org/10.1016/j.ejor.2005.01.065openalex-snapshot
Experimental investigation of heuristics for resource-constrained project scheduling: An update
inferredcites →https://doi.org/10.1016/j.ejor.2007.10.040openalex-snapshot
Project selection, scheduling and resource allocation with time dependent returns
inferredcites →https://doi.org/10.1016/j.ejor.2009.11.005openalex-snapshot
A survey of variants and extensions of the resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2010.03.037openalex-snapshot
Project scheduling with finite or infinite number of activity processing modes – A survey
inferredcites →https://doi.org/10.1016/j.ejor.2013.08.021openalex-snapshot
An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ijproman.2005.03.003openalex-snapshot
Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding
inferredcites →https://doi.org/10.1016/j.ijproman.2008.10.009openalex-snapshot
A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution
inferredcites →https://doi.org/10.1016/s0377-2217(01)00097-2openalex-snapshot
A review of the contribution of Operational Research to Project Management
inferredcites →https://doi.org/10.1016/s0377-2217(98)00364-6openalex-snapshot
Constraint satisfaction problems: Algorithms and applications
inferredcites →https://doi.org/10.1016/s0926-5805(99)00011-4openalex-snapshot
Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
inferredcites →https://doi.org/10.1016/s1574-6526(06)x8001-xopenalex-snapshot
Handbook of Constraint Programming
inferredcites →https://doi.org/10.1017/cbo9780511615320openalex-snapshot
Principles of Constraint Programming
inferredcites →https://doi.org/10.1023/a:1010902015091openalex-snapshot
Project Scheduling with Multiple Modes: A Genetic Algorithm
inferredcites →https://doi.org/10.1046/j.1365-232x.1998.00068.xopenalex-snapshot
Linear scheduling: past research efforts and future directions
inferredcites →https://doi.org/10.1057/jors.1980.134openalex-snapshot
Two Approaches to Problems of Resource Allocation Among Project Activities — A Comparative Study
inferredcites →https://doi.org/10.1057/palgrave.jors.2600489openalex-snapshot
Cost/time trade-off analysis for the critical path method: a derivation of the network flow approach
inferredcites →https://doi.org/10.1057/palgrave.jors.2600634openalex-snapshot
New computational results on the discrete time/cost trade-off problem in project networks
inferredcites →https://doi.org/10.1057/palgrave.jors.2600730openalex-snapshot
Comparing Constraint Programming and Mathematical Programming Approaches to Discrete Optimisation-The Change Problem
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1986)112:3(411)openalex-snapshot
Line‐of‐Balance Scheduling in Pavement Construction
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1986)112:4(476)openalex-snapshot
Application of Linear Scheduling
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1990)116:2(316)openalex-snapshot
RPM: Repetitive Project Modeling
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1997)123:3(233)openalex-snapshot
Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1997)123:4(450)openalex-snapshot
Scheduling/Cost Optimization and Neural Dynamics Model for Construction
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1998)124:1(18)openalex-snapshot
Regularization Neural Network for Construction Cost Estimation
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1998)124:3(232)openalex-snapshot
Resource Leveling of Linear Schedules Using Integer Linear Programming
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1998)124:4(263)openalex-snapshot
Linear Scheduling Model: Development of Controlling Activity Path
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1998)124:4(269)openalex-snapshot
Scheduling Projects with Repeating Activities
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1999)125:3(167)openalex-snapshot
Optimization of Resource Allocation and Leveling Using Genetic Algorithms
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1999)125:5(361)openalex-snapshot
OO Information Model for Construction Project Management
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1999)125:5(368)openalex-snapshot
CONSCOM: An OO Construction Scheduling and Change Management System
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1999)125:6(420)openalex-snapshot
GA-Based Multicriteria Optimal Model for Construction Scheduling
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2001)127:1(28)openalex-snapshot
Resource Scheduling Using Neural Dynamics Model of Adeli and Park
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2001)127:4(255)openalex-snapshot
Linear Scheduling Model: Float Characteristics
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2002)128:2(139)openalex-snapshot
Incorporating Practicability into Genetic Algorithm-Based Time-Cost Optimization
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2002)128:6(513)openalex-snapshot
Constraint Programming Approach to Precast Production Scheduling
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2004)130:6(869)openalex-snapshot
Use of Genetic Algorithms in Resource Scheduling of Construction Projects
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2009)135:1(42)openalex-snapshot
Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2009)135:4(246)openalex-snapshot
Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions
inferredcites →https://doi.org/10.1061/(asce)0887-3801(2001)15:4(292)openalex-snapshot
Algorithm for Determining Controlling Path Considering Resource Continuity
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000244openalex-snapshot
Integrating Efficient Resource Optimization and Linear Schedule Analysis with Singularity Functions
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000261openalex-snapshot
Efficient Hybrid Genetic Algorithm for Resource Leveling via Activity Splitting
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000320openalex-snapshot
Linear Scheduling Model with Varying Production Rates
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000492openalex-snapshot
Construction Resource Allocation and Leveling Using a Threshold Accepting–Based Hyperheuristic Algorithm
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000716openalex-snapshot
Multiresource Leveling in Line-of-Balance Scheduling
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000862openalex-snapshot
Two-Stage Scheduling Model for Resource Leveling of Linear Projects
inferredcites →https://doi.org/10.1061/jcceaz.0000960openalex-snapshot
Linear Scheduling Method for Highway Construction
inferredcites →https://doi.org/10.1080/00207540600800326openalex-snapshot
Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art
inferredcites →https://doi.org/10.1080/01446193.2013.845305openalex-snapshot
Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling
inferredcites →https://doi.org/10.1108/09699980410535813openalex-snapshot
Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling
inferredcites →https://doi.org/10.1108/eb005544openalex-snapshot
ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS
inferredcites →https://doi.org/10.1111/j.1467-8667.2005.00420.xopenalex-snapshot
Multimode Project Scheduling Based on Particle Swarm Optimization
inferredcites →https://doi.org/10.1111/mice.12038openalex-snapshot
Resource Leveling in Line-of-Balance Scheduling
inferredcites →https://doi.org/10.1201/9781315214764openalex-snapshot
Neurocomputing for Design Automation
inferredcites →https://doi.org/10.1201/9781482267686openalex-snapshot
Construction Scheduling, Cost Optimization and Management
inferredcites →https://doi.org/10.1287/mnsc.27.9.1040openalex-snapshot
Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
inferredcites →https://doi.org/10.1287/mnsc.28.10.1197openalex-snapshot
Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
inferredcites →https://doi.org/10.1287/opre.27.2.225openalex-snapshot
A Dynamic Programming Algorithm for Decision CPM Networks
inferredcites →https://doi.org/10.2307/2581688openalex-snapshot
Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
inferredcites →https://doi.org/10.31274/rtd-180813-10183openalex-snapshot
Linear scheduling model: the development of a linear scheduling model with micro computer applications for highway construction project control
inferredcites →https://doi.org/10.5281/zenodo.1083620openalex-snapshot
Solving An Extended Resource Leveling Problem With Multiobjective Evolutionary Algorithms
inferredcites →https://doi.org/10.5860/choice.33-1577openalex-snapshot
Artificial intelligence: a modern approach

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.4664600openalex-extracted
Optimization of Linear Projects Using Linear Scheduling Method as Scheduling Technique
inferred← citeshttps://doi.org/10.1002/eng2.70022openalex-snapshot
Whale Algorithm for Schedule Optimization of Construction Projects Employing Building Information Modeling
inferred← citeshttps://doi.org/10.1007/978-981-15-3588-8_35openalex-snapshot
Comparative Study and Hybrid Modeling of Vehicle Routing Problem and Job Shop Scheduling Problem
inferred← citeshttps://doi.org/10.1007/978-981-99-5455-1_12openalex-snapshot
Optimizing Timeline of Parallel Finishing Activities in High-Rise Building Projects Using Linear Scheduling
inferred← citeshttps://doi.org/10.1007/978-981-99-7545-7_4openalex-snapshot
Research Review on Application of Genetic Algorithms for Multi-Objective Optimal Management of Building Construction
inferred← citeshttps://doi.org/10.1007/s10462-018-9667-6openalex-snapshot
A state of the art review of intelligent scheduling
inferred← citeshttps://doi.org/10.1007/s12205-020-1429-8openalex-snapshot
A Fixed Start Scheduling Approach for Repetitive Construction Projects
inferred← citeshttps://doi.org/10.1016/j.autcon.2018.09.022openalex-snapshot
Generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction
inferred← citeshttps://doi.org/10.1016/j.autcon.2019.102990openalex-snapshot
A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic
inferred← citeshttps://doi.org/10.1016/j.autcon.2021.103601openalex-snapshot
Tetris-inspired approach for generating tightly-packed repetitive schedules
inferred← citeshttps://doi.org/10.1016/j.autcon.2022.104256openalex-snapshot
Multi-objective optimization for improved project management: Current status and future directions
inferred← citeshttps://doi.org/10.1016/j.autcon.2024.105567openalex-snapshot
Modeling and optimizing linear projects using LSM and Non-dominated Sorting Genetic Algorithm (NSGA-II)
inferred← citeshttps://doi.org/10.1016/j.autcon.2025.106272openalex-snapshot
Cost optimization of repetitive project scheduling through a constraint programming-based relax-and-solve algorithm
inferred← citeshttps://doi.org/10.1016/j.cie.2024.110751openalex-snapshot
Minimizing durations in repetitive projects through adaptive large neighborhood search
inferred← citeshttps://doi.org/10.1016/j.cie.2026.112053openalex-snapshot
Time-cost tradeoff optimization for railway construction project with non-preemptive activity splitting
inferred← citeshttps://doi.org/10.1016/j.cie.2026.112094openalex-snapshot
Flexible allocation strategy for repetitive project scheduling based on constraint programming
inferred← citeshttps://doi.org/10.1016/j.dibe.2024.100512openalex-snapshot
Digital twin-enabled synchronized construction management: A roadmap from construction 4.0 towards future prospect
inferred← citeshttps://doi.org/10.1016/j.eswa.2019.02.026openalex-snapshot
Optimization of University Course Scheduling Problem using Particle Swarm Optimization with Selective Search
inferred← citeshttps://doi.org/10.1016/j.rineng.2025.107100openalex-snapshot
Optimizing construction scheduling using the sine cosine algorithm (SCA) with building information modeling (BIM)
inferred← citeshttps://doi.org/10.1038/s41598-026-42832-1openalex-snapshot
Agent-based simulation for multi-resource-constrained scheduling of scattered atypical repetitive projects
inferred← citeshttps://doi.org/10.1061/(asce)co.1943-7862.0002348openalex-snapshot
Multiobjective Robust Optimization Model for Generating Stable and Makespan-Protective Repetitive Schedules
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-15279openalex-snapshot
A Flexible Scheduling Framework for Repetitive Construction Projects Based on Constraint Programming
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-16397openalex-snapshot
Work Section Planning for Accompanying Construction of Extra-Long Tunnel and Ballastless Track of Mountainous High-Speed Railways
inferred← citeshttps://doi.org/10.1061/jcemd4.coeng-16431openalex-snapshot
A Constrained Planning Method: Considering Storage Space Limitations and Soft Logic for Cruise Cabin Assembly Scheduling
inferred← citeshttps://doi.org/10.1080/0305215x.2023.2215711openalex-snapshot
Dynamic schedule model and algorithm optimization method for linear engineering projects
inferred← citeshttps://doi.org/10.1080/0305215x.2024.2361261openalex-snapshot
Scheduling optimization model for linear projects with resource transfer in diverse construction scenarios
inferred← citeshttps://doi.org/10.1080/15623599.2023.2276650openalex-snapshot
Multimode variable resource-constrained time/cost trade-off problem in repetitive projects with adjustment strategy
inferred← citeshttps://doi.org/10.1080/15623599.2026.2724960openalex-snapshot
A multi-objective constraint programming–satisfiability model for non-unit repetitive construction scheduling
inferred← citeshttps://doi.org/10.1108/ecam-07-2024-0986openalex-snapshot
Dynamic scheduling optimization model and algorithm for linear projects considering local rescheduling
inferred← citeshttps://doi.org/10.1108/ecam-08-2022-0703openalex-snapshot
Resource-constrained repetitive project scheduling with soft logic
inferred← citeshttps://doi.org/10.1108/ecam-09-2023-0910openalex-snapshot
Fuzzy repetitive scheduling for construction projects considering risk preferences and time-cost tradeoffs
inferred← citeshttps://doi.org/10.1108/ecam-10-2020-0843openalex-snapshot
Time-cost optimization in repetitive project scheduling with limited resources
inferred← citeshttps://doi.org/10.1108/ecam-11-2019-0595openalex-snapshot
Work continuity constraints in repetitive project scheduling considering soft logic
inferred← citeshttps://doi.org/10.1109/access.2020.3027058openalex-snapshot
Float-Based Resource Leveling Optimization of Linear Projects
inferred← citeshttps://doi.org/10.1109/access.2020.3042329openalex-snapshot
Expressway Project Cost Estimation With a Convolutional Neural Network Model
inferred← citeshttps://doi.org/10.1109/ccdc49329.2020.9164810openalex-snapshot
Modeling and Analysis Method of Nondeterministic Activity Network in Linear Project
inferred← citeshttps://doi.org/10.1109/hnicem64917.2024.11258758openalex-snapshot
Series Integer Linear Programming-Based Scheduling for Subterranean Characteristic Scale Development Using Mixed ERT and CRI Imaging
inferred← citeshttps://doi.org/10.1109/iceect61758.2024.10739290openalex-snapshot
Genetic Algorithm-Based Time-Table Creation System
inferred← citeshttps://doi.org/10.1111/mice.12356openalex-snapshot
The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
inferred← citeshttps://doi.org/10.1111/mice.12446openalex-snapshot
Dynamic headway control for high-frequency bus line based on speed guidance and intersection signal adjustment
inferred← citeshttps://doi.org/10.1111/mice.12504openalex-snapshot
Optimal transportation planning for prefabricated products in construction
inferred← citeshttps://doi.org/10.1111/mice.12593openalex-snapshot
Drone scheduling for construction site surveillance
inferred← citeshttps://doi.org/10.1111/mice.12824openalex-snapshot
Segment-condition-based railway track maintenance schedule optimization
inferred← citeshttps://doi.org/10.1111/mice.12917openalex-snapshot
Scenario‐oriented repetitive project scheduling optimization
inferred← citeshttps://doi.org/10.1111/mice.13134openalex-snapshot
On the role of time‐of‐use electricity price in charge scheduling for electric bus fleets
inferred← citeshttps://doi.org/10.1111/mice.13483openalex-snapshot
Resource leveling strategy integrating soft logic and crew interruption in repetitive projects
inferred← citeshttps://doi.org/10.1155/2018/6534021openalex-snapshot
A Biobjective Optimization Model for Deadline Satisfaction in Line-of-Balance Scheduling with Work Interruptions Consideration
inferred← citeshttps://doi.org/10.11648/j.jccee.20230805.11openalex-snapshot
Repetitive Projects Scheduling to Minimize Idle Time: A Case Study of Libyan Electricity Infrastructure Projects
inferred← citeshttps://doi.org/10.2139/ssrn.7322879openalex-snapshot
Criticality-Guided Memetic NSGA-II for University Course Timetabling: A Multi-Objective Flexible Job Shop Scheduling Approach
inferred← citeshttps://doi.org/10.21683/1729-2646-2025-25-1-19-27openalex-snapshot
Developing a graph-based algorithm for optimising scheduling and network planning as part of subway construction subject to limited resources
inferred← citeshttps://doi.org/10.24200/j30.2021.54796.2680openalex-snapshot
ارتقاء برنامهریزی پروژههای ساخت خط لوله گاز
inferred← citeshttps://doi.org/10.3390/app13169407openalex-snapshot
Linear Project-Scheduling Optimization Considering a Reverse Construction Scenario
inferred← citeshttps://doi.org/10.3390/app14062580openalex-snapshot
Optimization of Tunnel Construction Schedule Considering Soft Logic
inferred← citeshttps://doi.org/10.3390/buildings13092139openalex-snapshot
Research on Optimization of Project Design Management Process Based on BIM
inferred← citeshttps://doi.org/10.3390/buildings14072073openalex-snapshot
A Constraint Programming Approach for Discrete Time–Cost Tradeoff Problems in a Time-Constrained Activity Network
inferred← citeshttps://doi.org/10.3390/math9192492openalex-snapshot
Non-Sequential Linear Construction Project Scheduling Model for Minimizing Idle Equipment Using Constraint Programming (CP)
inferred← citeshttps://doi.org/10.3390/s25113435openalex-snapshot
Scheduling Optimization of Electric Rubber-Tired Vehicles in Underground Coal Mines Based on Constraint Programming
inferred← citeshttps://doi.org/10.36548/jitdw.2026.1.003openalex-snapshot
Design of a Smart Timetable Generator Using Artificial Intelligence for NEP 2020 Multidisciplinary Learning Models
inferred← citeshttps://doi.org/10.3846/jcem.2023.17568openalex-snapshot
RESOURCE LEVELLING IN REPETITIVE CONSTRUCTION PROJECTS WITH INTERRUPTIONS: AN INTEGRATED APPROACH
inferred← citeshttps://doi.org/10.46990/iquatro.2023.14.5.10openalex-snapshot
Capitulo 10. MRP II y Cumplimiento de la programación para elevadores de cangilones en una Mype metal mecánica.
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.