On the public citation graph

Optimization of Linear Projects Using Linear Scheduling Method as Scheduling Technique

0 signed · 19 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1016/j.advengsoft.2007.08.002openalex-extracted
Genetic algorithm-based multi-objective model for scheduling of linear construction projects
inferredcites →https://doi.org/10.1016/j.aei.2005.01.004openalex-extracted
Comparison among five evolutionary-based optimization algorithms
inferredcites →https://doi.org/10.1016/j.autcon.2010.12.006openalex-extracted
Metaheuristics for project and construction management – A state-of-the-art review
inferredcites →https://doi.org/10.1016/j.autcon.2013.09.008openalex-extracted
Schedule control model for linear projects based on linear scheduling method and constraint programming
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1986)112:4(476)openalex-extracted
Application of Linear Scheduling
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1990)116:2(316)openalex-extracted
RPM: Repetitive Project Modeling
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1998)124:4(263)openalex-extracted
Linear Scheduling Model: Development of Controlling Activity Path
inferredcites →https://doi.org/10.1061/(asce)0733-9364(1998)124:4(269)openalex-extracted
Scheduling Projects with Repeating Activities
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2001)127:5(374)openalex-extracted
Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2007)133:6(417)openalex-extracted
Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects
inferredcites →https://doi.org/10.1061/(asce)0733-9364(2009)135:4(246)openalex-extracted
Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions
inferredcites →https://doi.org/10.1061/jcceaz.0000877openalex-extracted
Construction Planning for Linear Projects
inferredcites →https://doi.org/10.1080/01446193.2017.1410561openalex-extracted
Improving workflow and resource usage in construction schedules through location-based management system (LBMS)
inferredcites →https://doi.org/10.1080/15623599.2018.1505027openalex-extracted
Simultaneous multi-criteria optimization for scheduling linear infrastructure projects
inferredcites →https://doi.org/10.1108/ecam-10-2019-0590openalex-extracted
Optimized crew selection for scheduling of repetitive projects
inferredcites →https://doi.org/10.1109/4235.996017openalex-extracted
A fast and elitist multiobjective genetic algorithm: NSGA-II
inferredcites →https://doi.org/10.1111/mice.12277openalex-extracted
Scheduling Optimization of Linear Schedule with Constraint Programming
inferredcites →https://doi.org/10.1111/mice.12917openalex-extracted
Scenario‐oriented repetitive project scheduling optimization
inferredcites →https://doi.org/10.21315/jcdc2022.27.1.11openalex-extracted
Application of Linear Scheduling in Water Canal Construction with a Comparison of Critical Path Method
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.