On the public citation graph
IT projects success factors: a literature review
0 signed · 216 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1002/pmj.20137openalex-snapshot
Project Success as a Topic in Project Management Journals
inferredcites →https://doi.org/10.1002/pmj.21372openalex-snapshot
From Every Direction–-How Personality Traits and Dimensions of Project Managers Can Conceptually Affect Project Success
inferredcites →https://doi.org/10.1016/0167-9236(94)00041-2openalex-snapshot
Design and natural science research on information technology
inferredcites →https://doi.org/10.1016/0263-7863(88)90043-9openalex-snapshot
Measurement of project success
inferredcites →https://doi.org/10.1016/0263-7863(95)00064-xopenalex-snapshot
A new framework for determining critical success/failure factors in projects
inferredcites →https://doi.org/10.1016/j.accinf.2008.04.001openalex-snapshot
Management based critical success factors in the implementation of Enterprise Resource Planning systems
inferredcites →https://doi.org/10.1016/j.csi.2004.09.002openalex-snapshot
An AHP-based methodology to rank critical success factors of executive information systems
inferredcites →https://doi.org/10.1016/j.csi.2016.04.002openalex-snapshot
An analysis of the factors determining software product quality: A comparative study
inferredcites →https://doi.org/10.1016/j.dss.2010.11.005openalex-snapshot
An empirical investigation of the impacts of internal/external facilitators on the project success of ERP: A structural equation model
inferredcites →https://doi.org/10.1016/j.eswa.2006.01.032openalex-snapshot
Modelling IT projects success with Fuzzy Cognitive Maps
inferredcites →https://doi.org/10.1016/j.ijproman.2004.10.002openalex-snapshot
The success of international development projects, trust and communication: an African perspective
inferredcites →https://doi.org/10.1016/j.ijproman.2005.07.004openalex-snapshot
Framing of project critical success factors by a systems model
inferredcites →https://doi.org/10.1016/j.ijproman.2009.06.002openalex-snapshot
A project contingency framework based on uncertainty and its consequences
inferredcites →https://doi.org/10.1016/j.ijproman.2012.09.011openalex-snapshot
Factors associated with the software development agility of successful projects
inferredcites →https://doi.org/10.1016/j.ijproman.2013.02.006openalex-snapshot
Different stakeholder groups and their perceptions of project success
inferredcites →https://doi.org/10.1016/j.ijproman.2016.12.007openalex-snapshot
Towards a design for the project-based organization
inferredcites →https://doi.org/10.1016/j.im.2017.09.005openalex-snapshot
Opening the black box: Managers’ perceptions of IS project success mechanisms
inferredcites →https://doi.org/10.1016/j.indmarman.2005.09.008openalex-snapshot
Justifying CRM projects in a business-to-business context: The potential of the Benefits Dependency Network
inferredcites →https://doi.org/10.1016/j.infsof.2016.05.008openalex-snapshot
A survey on the characteristics of projects with success in delivering client benefits
inferredcites →https://doi.org/10.1016/j.is.2011.10.010openalex-snapshot
Identification and classification of ERP critical failure factors in Iranian industries
inferredcites →https://doi.org/10.1016/j.jss.2007.08.020openalex-snapshot
A survey study of critical success factors in agile software projects
inferredcites →https://doi.org/10.1016/j.jss.2011.11.010openalex-snapshot
Factors affecting the success of Open Source Software
inferredcites →https://doi.org/10.1016/j.jss.2013.02.027openalex-snapshot
A survey study of critical success factors in agile software projects in former Yugoslavia IT companies
inferredcites →https://doi.org/10.1016/j.technovation.2006.12.006openalex-snapshot
Modelling IT projects success: Emerging methodologies reviewed
inferredcites →https://doi.org/10.1016/s0048-7333(02)00088-4openalex-snapshot
No project is an island: linking projects to history and context
inferredcites →https://doi.org/10.1016/s0166-4972(03)00013-0openalex-snapshot
Auditing best practice for effective product innovation management
inferredcites →https://doi.org/10.1016/s0263-7863(01)00067-9openalex-snapshot
The “real” success factors on projects
inferredcites →https://doi.org/10.1016/s0263-7863(01)00075-8openalex-snapshot
Critical failure factors in information system projects
inferredcites →https://doi.org/10.1016/s0263-7863(02)00020-0openalex-snapshot
On the nature of the project as a temporary organization
inferredcites →https://doi.org/10.1016/s0263-7863(02)00112-6openalex-snapshot
The Project Excellence Model®: linking success criteria and critical success factors
inferredcites →https://doi.org/10.1016/s0263-7863(03)00008-5openalex-snapshot
The success dimensions of international development projects: the perceptions of African project coordinators
inferredcites →https://doi.org/10.1016/s0263-7863(97)00011-2openalex-snapshot
Effects of human resource management on project effectiveness and success: Toward a new conceptual framework
inferredcites →https://doi.org/10.1016/s0263-7863(98)00040-4openalex-snapshot
Criteria of project success: an exploratory re-examination
inferredcites →https://doi.org/10.1016/s0263-7863(98)00069-6openalex-snapshot
Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
inferredcites →https://doi.org/10.1016/s0263-7863(99)00022-8openalex-snapshot
Revisiting the golden triangle of cost, time and quality: the role of NPV in project control, success and failure
inferredcites →https://doi.org/10.1016/s0950-5849(01)00217-8openalex-snapshot
Case study: factors for early prediction of software development success
inferredcites →https://doi.org/10.1057/ejis.2008.37openalex-snapshot
Defining information systems as work systems: implications for the IS field
inferredcites →https://doi.org/10.1057/palgrave.jit.2000044openalex-snapshot
Toward Predicting Software Development Success from the Perspective of Practitioners: An Exploratory Bayesian Model
inferredcites →https://doi.org/10.1080/07421222.2003.11045748openalex-snapshot
The DeLone and McLean Model of Information Systems Success: A Ten-Year Update
inferredcites →https://doi.org/10.1080/08874417.2011.11645536openalex-snapshot
Managers' Perceptions of Information System Project Success
inferredcites →https://doi.org/10.1080/09537287.2016.1217571openalex-snapshot
Information systems project failure – analysis of causal links using interpretive structural modelling
inferredcites →https://doi.org/10.1080/10580530.2014.854033openalex-snapshot
Quantifying Success Factors for IT Projects—An Expert-Based Bayesian Model
inferredcites →https://doi.org/10.1108/01443570910925343openalex-snapshot
ERP implementation at SMEs: analysis of five Canadian cases
inferredcites →https://doi.org/10.1108/02635570610710809openalex-snapshot
The attribution of success and failure in IT projects
inferredcites →https://doi.org/10.1108/17410391211272829openalex-snapshot
A model of critical success factors for software projects
inferredcites →https://doi.org/10.1108/17538371211269040openalex-snapshot
Critical success factors in projects
inferredcites →https://doi.org/10.1108/ijmpb-03-2015-0025openalex-snapshot
The impact of project methodologies on project success in different project environments
inferredcites →https://doi.org/10.1108/ijmpb-09-2017-0107openalex-snapshot
What is the Iron Triangle, and how has it changed?
inferredcites →https://doi.org/10.1109/17.97444openalex-snapshot
An exploratory analysis relating the software project management process to project success
inferredcites →https://doi.org/10.1109/emr.2006.261387openalex-snapshot
A retrospective look at our evolving understanding of project success
inferredcites →https://doi.org/10.1109/hicss.2012.147openalex-snapshot
Celebrating IT Projects Success: A Multi-domain Analysis
inferredcites →https://doi.org/10.1109/tem.1987.6498856openalex-snapshot
Critical factors in successful project implementation
inferredcites →https://doi.org/10.1109/tem.2003.822468openalex-snapshot
Toward Preprototype User Acceptance Testing of New Information Systems: Implications for Software Project Management
inferredcites →https://doi.org/10.1145/1562764.1562794openalex-snapshot
Balancing four factors in system development projects
inferredcites →https://doi.org/10.11591/ijece.v5i2.pp271-279openalex-snapshot
Measurement of Information System Project Success Based on Perceptions of the Internal Stakeholders
inferredcites →https://doi.org/10.1177/875697280503600403openalex-snapshot
A Retrospective look at our Evolving Understanding of Project Success
inferredcites →https://doi.org/10.1177/875697289903000405openalex-snapshot
The Logical Framework Method for Defining Project Success
inferredcites →https://doi.org/10.1201/1078.10580530/46352.23.4.20060901/95112.6openalex-snapshot
Exploring the Linkage Between the Characteristics of it Project Leaders and Project Success
inferredcites →https://doi.org/10.12821/ijispm020201openalex-snapshot
Ladder to success – eliciting project managers’ perceptions of IS project success criteria
inferredcites →https://doi.org/10.12821/ijispm040201openalex-snapshot
Improving intercultural competency in global IT projects through recognition of culture-based behaviors
inferredcites →https://doi.org/10.12821/ijispm040204openalex-snapshot
A qualitative study of success criteria in Norwegian agile software projects from suppliers’ perspective
inferredcites →https://doi.org/10.12821/ijispm060401openalex-snapshot
The many facets of information systems (+projects) success
inferredcites →https://doi.org/10.1287/inte.1060.0203openalex-snapshot
Achieving Success in Large Projects: Implications from a Study of ERP Implementations
inferredcites →https://doi.org/10.1287/isre.3.1.60openalex-snapshot
Information Systems Success: The Quest for the Dependent Variable
inferredcites →https://doi.org/10.1287/mnsc.46.2.186.11926openalex-snapshot
A Theoretical Extension of the Technology Acceptance Model: Four Longitudinal Field Studies
inferredcites →https://doi.org/10.1287/mnsc.47.3.394.9772openalex-snapshot
One Size Does Not Fit All Projects: Exploring Classical Contingency Domains
inferredcites →https://doi.org/10.12928/telkomnika.v13i2.1323openalex-snapshot
Influences of the Input Factors towards Success of An Information System Project
inferredcites →https://doi.org/10.1504/ijbis.2009.026699openalex-snapshot
ERP systems implementation success factors: IS and non-IS managers' perceptions
inferredcites →https://doi.org/10.1504/ijbis.2016.10000261openalex-snapshot
Measurement of the information system project success of the higher education institutions in Indonesia: a pilot study
inferredcites →https://doi.org/10.1504/ijmed.2006.009083openalex-snapshot
An empirical study of critical success factors in IT projects
inferredcites →https://doi.org/10.1515/orga-2016-0014openalex-snapshot
A Primary Human Critical Success Factors Model for the ERP System Implementation
inferredcites →https://doi.org/10.17705/1jais.00296openalex-snapshot
The Past, Present, and Future of “IS Success”
inferredcites →https://doi.org/10.21608/auej.2025.336575.1735openalex-snapshot
CRITICAL SUCCESS FACTORS ACROSS THE PROJECT LIFE CYCLE
inferredcites →https://doi.org/10.2197/ipsjjip.22.689openalex-snapshot
Factors Affecting Project Performance of IS Development: Evidence from Japanese IT Vendors
inferredcites →https://doi.org/10.4135/9781452229249openalex-snapshot
The Contingency Theory of Organizations
inferredcites →https://doi.org/10.5539/ijbm.v3n9p3openalex-snapshot
What is Project Success: A Literature Review
inferredcites →https://doi.org/10.5539/mas.v9n5p133openalex-snapshot
Key Success Factors Analysis in the Context of Enterprise Resourcesplanning Systems Projects Implementation
inferredcites →https://doi.org/10.5755/j01.ee.27.5.13208openalex-snapshot
Measurement of ERP-Project Success: Findings from Germany and Austria
inferredcites →https://doi.org/10.5860/choice.34-1636openalex-snapshot
A Guide to the project management body of knowledge
inferredcites →https://doi.org/10.5897/sre10.1171openalex-snapshot
Critical success factors for software projects: A comparative study
What points at this work
Incoming claims: where this work appears in other papers’ reference lists and arguments.
inferred← citeshttps://doi.org/10.2139/ssrn.4830735openalex-extracted
Value of Continuity: The Empirical Study of CEO Leadership Delay on Firms’ Digital Transformation
inferred← citeshttps://doi.org/10.1002/nml.21609openalex-snapshot
Identifying key barriers to nonprofit organizations' adoption of technology innovations
inferred← citeshttps://doi.org/10.1002/smr.2735openalex-snapshot
A Study of Factors That Influence the Software Project Success
inferred← citeshttps://doi.org/10.1007/978-3-030-63396-7_52openalex-snapshot
IS Project Management Success in Developing Countries
inferred← citeshttps://doi.org/10.1007/978-3-031-27099-4_35openalex-snapshot
What Drives Success in Data Science Projects: A Taxonomy of Antecedents
inferred← citeshttps://doi.org/10.1007/978-3-031-71139-8_1openalex-snapshot
Empowering Software Project Success: Guidelines to Enhance the Impact of Human Critical Success Factors
inferred← citeshttps://doi.org/10.1007/s10664-026-10824-4openalex-snapshot
Decoding success: an empirical study of critical success factors in software projects
inferred← citeshttps://doi.org/10.1007/s11518-026-5727-7openalex-snapshot
A Rough-Set Theory based Approach for the Detection of Requirements Discordances among Stakeholders of an Information System
inferred← citeshttps://doi.org/10.1016/j.eswa.2024.125141openalex-snapshot
Smart recommender for the configuration of software project development teams
inferred← citeshttps://doi.org/10.1016/j.heliyon.2022.e11977openalex-snapshot
Models and methods for information systems project success evaluation – A review and directions for research
inferred← citeshttps://doi.org/10.1016/j.heliyon.2024.e40619openalex-snapshot
Information systems project success surveys - Insights from the last 30 years
inferred← citeshttps://doi.org/10.1016/j.ijproman.2022.04.002openalex-snapshot
Success Management – From theory to practice
inferred← citeshttps://doi.org/10.1016/j.ijproman.2025.102750openalex-snapshot
The elephant actually talks - Project organisation from a communication perspective
inferred← citeshttps://doi.org/10.1016/j.jer.2026.07.021openalex-snapshot
A critical success factor measurement framework for enhancing decision making in software projects
inferred← citeshttps://doi.org/10.1016/j.jik.2023.100336openalex-snapshot
The impact of selected components of industry 4.0 on project management
inferred← citeshttps://doi.org/10.1016/j.jss.2022.111408openalex-snapshot
Perceptions of the human and social factors that influence the productivity of software development teams in Colombia: A statistical analysis
inferred← citeshttps://doi.org/10.1016/j.procs.2021.11.074openalex-snapshot
Failure of AI projects: understanding the critical factors
inferred← citeshttps://doi.org/10.1016/j.procs.2021.12.091openalex-snapshot
Employee learning in the digitalization context: An evaluation from team members’ and project managers’ perspectives
inferred← citeshttps://doi.org/10.1016/j.procs.2021.12.154openalex-snapshot
Critical success factors for ICT project: A case study in project colocation government data center
inferred← citeshttps://doi.org/10.1016/j.procs.2024.06.251openalex-snapshot
Developing role clarity in projects with a hybrid approach
inferred← citeshttps://doi.org/10.1016/j.procs.2024.06.336openalex-snapshot
Integrating Lean Thinking into Project Management: A Conceptual Model for the IT Sector
inferred← citeshttps://doi.org/10.1016/j.procs.2025.02.143openalex-snapshot
IT Outsourcing Success Management
inferred← citeshttps://doi.org/10.1016/j.procs.2025.02.323openalex-snapshot
CrEISPS - A framework of criteria for evaluating success in information systems projects
inferred← citeshttps://doi.org/10.1016/j.procs.2026.02.459openalex-snapshot
Socio-Technical Success Criteria in the Public Sector – a Strategic Projects View
inferred← citeshttps://doi.org/10.1016/j.procs.2026.03.180openalex-snapshot
Different Perception of National-Level Projects According to Region, Theme and Sector
inferred← citeshttps://doi.org/10.1016/j.procs.2026.03.186openalex-snapshot
Project budget, end user community size, and organizational goal clarity as predictors of project success: An empirical analysis
inferred← citeshttps://doi.org/10.1016/j.ress.2020.107303openalex-snapshot
Team Resilience Model: An Empirical Examination of Information Systems Projects
inferred← citeshttps://doi.org/10.1016/j.sftr.2025.101095openalex-snapshot
Success factors of public sector information systems projects in developing countries
inferred← citeshttps://doi.org/10.1051/e3sconf/202340301030openalex-snapshot
Development of a mathematical model for planning team readiness for IT solution implementation projects
inferred← citeshttps://doi.org/10.1063/5.0307940openalex-snapshot
The need to implement an intelligent knowledge management system in the companies of the railway industry of kazakhstan for effective management of investment projects
inferred← citeshttps://doi.org/10.1080/00207543.2025.2540450openalex-snapshot
Blockchain success in the post-adoption phase: extending the information systems success model with supply chain complexity
inferred← citeshttps://doi.org/10.1080/01930826.2023.2240193openalex-snapshot
Implementing a Library Services Platform Using an Organizational Framework
inferred← citeshttps://doi.org/10.1080/09537287.2022.2089265openalex-snapshot
Interchange roles of formal and informal project management on business operational success
inferred← citeshttps://doi.org/10.1080/10429247.2025.2492921openalex-snapshot
Conflicting Perceptions of Project Success and Failure Relationships: A Systematic Literature Review
inferred← citeshttps://doi.org/10.1080/10429247.2025.2539325openalex-snapshot
Unveiling the Facets of IT Projects: A New Conceptual Model
inferred← citeshttps://doi.org/10.1080/10580530.2021.1887982openalex-snapshot
Evaluation of Information Systems Project Success – Insights from Practitioners
inferred← citeshttps://doi.org/10.1080/23311975.2024.2336273openalex-snapshot
Managing success criteria and success factors in a BPM project: an approach using PRINCE2 and Success Management on the public sector
inferred← citeshttps://doi.org/10.1093/jamia/ocac182openalex-snapshot
Medical informatics and climate change: a framework for modeling green healthcare solutions
inferred← citeshttps://doi.org/10.1108/bpmj-09-2021-0619openalex-snapshot
A value chain development model for the public sector
inferred← citeshttps://doi.org/10.1108/ijlss-11-2023-0198openalex-snapshot
A proposed conceptual model for linking Lean thinking and project management in the IT sector
inferred← citeshttps://doi.org/10.1108/ijmpb-02-2021-0045openalex-snapshot
Control of project data and team satisfaction as results of PMO effort in new product development projects
inferred← citeshttps://doi.org/10.1108/ijmpb-03-2025-0078openalex-snapshot
Effects of project management information systems (PMIS) on project manager’s performance: the moderating role of PMO
inferred← citeshttps://doi.org/10.1108/ijmpb-04-2025-0115openalex-snapshot
Smart working in project-based organizations: a sociotechnical perspective integrating workforce agility and information system success
inferred← citeshttps://doi.org/10.1108/ijmpb-10-2024-0251openalex-snapshot
Harnessing information processing theory: key organizational initiatives for digital transformation projects success
inferred← citeshttps://doi.org/10.1108/ijppm-12-2024-0862openalex-snapshot
The synergy of shared leadership: unveiling the role of innovative work behavior and knowledge management in project success
inferred← citeshttps://doi.org/10.1108/ijqrm-02-2022-0055openalex-snapshot
The quality of servitization in project-oriented organizations
inferred← citeshttps://doi.org/10.1108/ijqrm-10-2020-0353openalex-snapshot
ISO 21500 and success management: an integrated model for project management
inferred← citeshttps://doi.org/10.1108/jsit-08-2017-0070openalex-snapshot
Most used project management tools and techniques in information systems projects
inferred← citeshttps://doi.org/10.1108/tqm-07-2020-0170openalex-snapshot
Information systems project team members: factors for high performance
inferred← citeshttps://doi.org/10.1108/tqm-08-2020-0192openalex-snapshot
Proposing total quality management as a buffer between global software development challenges and project success
inferred← citeshttps://doi.org/10.1109/access.2024.3494613openalex-snapshot
Investigating Critical Success Factors for Effective Management of IT Projects
inferred← citeshttps://doi.org/10.1109/access.2025.3540975openalex-snapshot
The Role of Accuracy and Validation Effectiveness in Conversational Business Analytics
inferred← citeshttps://doi.org/10.1109/argencon55245.2022.9940124openalex-snapshot
Métricas para Metodologías de Gestión de Proyectos: planificación de calidad y equipo de gestión
inferred← citeshttps://doi.org/10.1109/cinti63048.2024.10830858openalex-snapshot
Catalog for IT Project Management Auditing
inferred← citeshttps://doi.org/10.1109/icic56845.2022.10006933openalex-snapshot
Analysis of Critical Success Factors in Information Technology Projects: A National Shipping Company Case Study
inferred← citeshttps://doi.org/10.1109/icoco67189.2025.11334108openalex-snapshot
Incorporating Green Software and Waste Elements for Environmental Sustainability
inferred← citeshttps://doi.org/10.1109/ieem55944.2022.9989687openalex-snapshot
Examining Recommended Practices for Information System Development Projects and the Effect of Standardization Frameworks: An Empirical Study
inferred← citeshttps://doi.org/10.1109/iraset64571.2025.11008278openalex-snapshot
Exploring Privacy as a Success Factor in Information Systems Projects: a Position Paper
inferred← citeshttps://doi.org/10.1145/3761819openalex-snapshot
Success Factors for Public Sector Information Systems Projects
inferred← citeshttps://doi.org/10.1145/3786158.3788554openalex-snapshot
Public IS procurement stakeholders' views on success – A Delphi study
inferred← citeshttps://doi.org/10.1145/3802463.3802477openalex-snapshot
Critical Success Factor in Disaster Recovery Center Relocation Project Evidence from The Banking Sector
inferred← citeshttps://doi.org/10.11591/csit.v5i1.p7-12openalex-snapshot
The impact of usability in information technology projects
inferred← citeshttps://doi.org/10.11591/csit.v5i1.p7-18openalex-snapshot
The impact of usability in information technology projects
inferred← citeshttps://doi.org/10.11591/csit.v5i1.pp7-12openalex-snapshot
The impact of usability in information technology projects
inferred← citeshttps://doi.org/10.11591/csit.v5i1.pp7-18openalex-snapshot
The impact of usability in information technology projects
inferred← citeshttps://doi.org/10.1177/02666669241264740openalex-snapshot
Building project management tools and techniques capacity to drive Information and Communications Technology projects in the Department of Social Development, South Africa
inferred← citeshttps://doi.org/10.1177/21582440251355046openalex-snapshot
ISO 21502 and Success Management: A Required Marriage in Project Management
inferred← citeshttps://doi.org/10.12688/f1000research.152308.1openalex-snapshot
Bibliometric analysis on the factors that affect the cycle of formulation, evaluation, and management of social project
inferred← citeshttps://doi.org/10.12821/ijispm080301openalex-snapshot
MIDST: an enhanced development environment that improves the maintainability of a data science analysis
inferred← citeshttps://doi.org/10.12821/ijispm080401openalex-snapshot
Social media in project management: A systematic narrative literature review
inferred← citeshttps://doi.org/10.12821/ijispm080403openalex-snapshot
Continual learning with a Bayesian approach for evolving the baselines of a leagile project portfolio
inferred← citeshttps://doi.org/10.12821/ijispm080404openalex-snapshot
Expecting the unexpected during ERP implementations: a complexity view
inferred← citeshttps://doi.org/10.12821/ijispm090103openalex-snapshot
Skills of junior project management professionals and project success achieved by them
inferred← citeshttps://doi.org/10.12821/ijispm090302openalex-snapshot
In whom do we trust? Critical success factors impacting intercultural communication in multicultural project teams
inferred← citeshttps://doi.org/10.12821/ijispm090303openalex-snapshot
Measures related to social and human factors that influence productivity in software development teams
inferred← citeshttps://doi.org/10.12821/ijispm090402openalex-snapshot
Project success/failure rates in Turkey
inferred← citeshttps://doi.org/10.12821/ijispm090404openalex-snapshot
Information systems project management success
inferred← citeshttps://doi.org/10.12821/ijispm100203openalex-snapshot
Hybrid project management – a systematic literature review
inferred← citeshttps://doi.org/10.12821/ijispm100304openalex-snapshot
Executives' role in digital transformation
inferred← citeshttps://doi.org/10.12821/ijispm110104openalex-snapshot
Improving the evaluation of change requests using past cases
inferred← citeshttps://doi.org/10.12821/ijispm110301openalex-snapshot
Using the PMO to enforce and standardize the attention of software project managers to needs of software project teams
inferred← citeshttps://doi.org/10.12821/ijispm110302openalex-snapshot
Failure factors of AI projects: results from expert interviews
inferred← citeshttps://doi.org/10.1371/journal.pone.0281936openalex-snapshot
The impact of identified agility components on project success—ICT industry perspective
inferred← citeshttps://doi.org/10.1504/ijpom.2023.132711openalex-snapshot
Using scenarios for the development of personal communication competence in project management
inferred← citeshttps://doi.org/10.15295/bmij.v11i3.2271openalex-snapshot
Havacılık, uzay ve savunma sanayisinde proje yönetimi uygulamaları üzerine nitel bir araştırma: Deneyimli proje liderlerinin görüşleri
inferred← citeshttps://doi.org/10.15388/22-infor488openalex-snapshot
Project Management Processes – Impact on the Success of Information Systems Projects
inferred← citeshttps://doi.org/10.15446/dyna.v92n236.117173openalex-snapshot
Project management performance in Ecuador: proposal for a structural model
inferred← citeshttps://doi.org/10.17163/ret.n27.2024.09openalex-snapshot
Validación de un instrumento de evaluación de proyectos latinoamericanos
inferred← citeshttps://doi.org/10.17705/1jais.00791openalex-snapshot
Digital Transformation as Collective Social Action
inferred← citeshttps://doi.org/10.18485/epmj.2021.11.2.3openalex-snapshot
Success Factors of ICT Projects in Digital Transformation
inferred← citeshttps://doi.org/10.18510/hssr.2021.941openalex-snapshot
IMPLEMENTATION OF THE DIGITAL GREEN CERTIFICATE (COVID PASSPORT) AS A KEY ICT PROJECT IN THE EUROPEAN UNION – A SCIENTIFIC COMMENT
inferred← citeshttps://doi.org/10.20532/cit.2022.1005543openalex-snapshot
Investigating the Role of Critical Success Factors in Achieving the Success of Agile Projects in the Gaza Strip
inferred← citeshttps://doi.org/10.2139/ssrn.5038139openalex-snapshot
Use of Project Management Tools and Techniques in Information Systems Projects: Individual and Contextual Influencing Variables
inferred← citeshttps://doi.org/10.21608/alat.2022.266227openalex-snapshot
تحديد أولويات معايير نجاح مشروعات تطوير البرمجيات بالتطبيق على شركات تطوير البرمجيات الحاصلة على شهادة CMMI-DEV بجمهورية مصر العربية
inferred← citeshttps://doi.org/10.22201/fca.24488410e.2024.4807openalex-snapshot
Validation of a measurement instrument to assess the 10 elements for successful organizational transformations in Colombia's Valle del Cauca region
inferred← citeshttps://doi.org/10.32620/reks.2024.2.18openalex-snapshot
Solving the problem of ranking applicants for a project team with fuzzy assessment of competencies and requirements
inferred← citeshttps://doi.org/10.3311/ppso.23032openalex-snapshot
Identifying Cross-Cultural Communication Barriers on Global IT Rollout Projects
inferred← citeshttps://doi.org/10.33271/nvngu/2023-3/137openalex-snapshot
Evaluation and control of data relevance in information systems of the transport industry management
inferred← citeshttps://doi.org/10.3390/bs13030202openalex-snapshot
Effects of a New Soft Skills Metacognition Training Program on Self-Efficacy and Adaptive Performance
inferred← citeshttps://doi.org/10.3390/electronics11223827openalex-snapshot
Classification of Task Types in Software Development Projects
inferred← citeshttps://doi.org/10.3390/ijerph20031725openalex-snapshot
Towards an Understanding of Successes of the Psychiatric Nurses in Caring for Children with Mental Health Problems: An Appreciative Inquiry
inferred← citeshttps://doi.org/10.3390/info13020048openalex-snapshot
Lack of Awareness of IT Adoption and Use Theories by IT/IS Project Managers: Poor Relevance, Unfocused Research or Deficient Education?
inferred← citeshttps://doi.org/10.3390/su142113862openalex-snapshot
Measuring the Effectiveness of the Project Management Information System (PMIS) on the Financial Wellness of Rural Households in the Hill Districts of Uttarakhand, India: An IS-FW Model
inferred← citeshttps://doi.org/10.3390/su16073014openalex-snapshot
Data-Driven Decision Making for Sustainable IT Project Management Excellence
inferred← citeshttps://doi.org/10.3390/systems12050149openalex-snapshot
The Impact of a Skill-Driven Model on Scrum Teams in Software Projects: A Catalyst for Digital Transformation
inferred← citeshttps://doi.org/10.34149/jmbr.v19i1.310openalex-snapshot
Analisis Pengaruh Faktor Kritis pada Keberhasilan Proyek Data Desa Presisi
inferred← citeshttps://doi.org/10.37394/232026.2025.7.3openalex-snapshot
Study of Critical Success Factors for Scrum Teams on Delivering IT Projects Success
inferred← citeshttps://doi.org/10.3844/jcssp.2021.724.737openalex-snapshot
Structural Equation Model (SEM) for Evaluating Factors Affecting ICT4D Project Success
inferred← citeshttps://doi.org/10.4018/978-1-6684-7684-0.ch008openalex-snapshot
Metrics for Project Management Methodologies Elicitation
inferred← citeshttps://doi.org/10.4018/978-1-7998-7872-8.ch004openalex-snapshot
Project Success Criteria, Critical Success Factors (CSF), and Agile Projects
inferred← citeshttps://doi.org/10.4018/978-1-7998-9687-6.ch008openalex-snapshot
Toward Comprehensive IS Project Alignment
inferred← citeshttps://doi.org/10.4018/979-8-3693-0458-7.ch002openalex-snapshot
Process-Oriented Model for Managing Software Development Projects Using the PRINCE2 Method
inferred← citeshttps://doi.org/10.4018/979-8-3693-8719-1.ch012openalex-snapshot
Benefits and Project Management to Improve Success of IS/IT Projects in Healthcare
inferred← citeshttps://doi.org/10.4018/ijamtr.2021070101openalex-snapshot
Integrating the Information Systems Success Model With Project Success Management Process
inferred← citeshttps://doi.org/10.4018/ijitpm.386592openalex-snapshot
The Impact of Information Systems on Project Success in a Hybrid Work Environment
inferred← citeshttps://doi.org/10.46289/cw44pu34openalex-snapshot
The Relation of Social Identity and Transformational Leadership in Project Teams: An Examination in the IT Industry in Germany.
inferred← citeshttps://doi.org/10.46338/ijetae0722_06openalex-snapshot
Critical Success Factors in Information Technology Projects
inferred← citeshttps://doi.org/10.46554/1993-0453-2026-7-261-88-101openalex-snapshot
Comparative analysis of problems and barriers in IT project management in Russian and international practice in the context of digital transformation
inferred← citeshttps://doi.org/10.47738/jads.v5i1.145openalex-snapshot
Developing the Readiness and Success Model of Information System Implementation in the Indonesian Equestrian Industry
inferred← citeshttps://doi.org/10.52260/2304-7216.2023.4(53).41openalex-snapshot
Analysis of the impact of human factors on the efficiency of information systems development projects in Kazakhstan
inferred← citeshttps://doi.org/10.55737/trt/v-vi.290openalex-snapshot
Beyond the Iron Triangle: Revisiting Project Manager Competencies and Their Link to Project Success; A Thematic Synthesis of Empirical Evidence, 2015-2024
inferred← citeshttps://doi.org/10.5585/2025.28101openalex-snapshot
Aprimorando a comunicação entre TI e Negócios em uma empresa de varejo em Portugal: um estudo de caso aplicando o framework TIDE
inferred← citeshttps://doi.org/10.56294/dm2025950openalex-snapshot
IT Management Framework for Municipalities
inferred← citeshttps://doi.org/10.56726/irjmets30362openalex-snapshot
CRITICAL SUCCESS FACTORS IN PROJECT MANAGEMENT
inferred← citeshttps://doi.org/10.56889/isqm3875openalex-snapshot
THE IMPACT OF WORKFORCE AGILITY ON PROJECT SUCCESS: RESEARCH PROPOSAL
inferred← citeshttps://doi.org/10.56889/sqxk2217openalex-snapshot
Research on Construction Method and Application of IT Project Management Knowledge Map Oriented to Risk Discovery
inferred← citeshttps://doi.org/10.59324/ejtas.2024.2(4).67openalex-snapshot
The Delay and Failure of ICT Related Projects: Empirical Impediments in Ministries, Departments and Agencies in Tanzania
inferred← citeshttps://doi.org/10.5937/jemc2402125sopenalex-snapshot
The role of IT projects within the strategy: How effectively do we use them?
inferred← citeshttps://doi.org/10.5937/tehnika2405625popenalex-snapshot
Trends in the appllinaction of machine learning algorithms for predicting software project success
inferred← citeshttps://doi.org/10.62270/jirms.v5i1.61openalex-snapshot
Decoding Success in IT projects: a Multi-Stakeholder Perspective
inferred← citeshttps://doi.org/10.63053/ijmea.5openalex-snapshot
Identification and prioritization of factors causing delays in ICT projects based on PMBOK standards using Fuzzy Delphi & Fuzzy Delphi hierarchical analysis
inferred← citeshttps://doi.org/10.64534/commer.2025.515openalex-snapshot
Software Project Complexity and Project Success: Mediating Role of Project Dynamism and Moderating Role of Agility-Based Project Management
inferred← citeshttps://doi.org/10.7769/gesec.v16i6.5003openalex-snapshot
Modelo de Avaliação de Desempenho Técnico de Servidores da Área de Desenvolvimento e Manutenção de Sistemas de um Setor Público
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.