On the public citation graph
Online Task Allocation and Scheduling in Multi-Manipulator System Considering Collision Constraints
0 signed · 31 inferred · view as graph
Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.
Is this your work? Sign in with ORCID and put your name on the
claims that are yours.
Reference health. See whether every reference in this work resolves to a
known work and none has been retracted — and get a dated CiteStamped
badge you can embed.
What this work says
Outgoing claims: the papers this work cites, builds on, or argues with.
inferredcites →https://doi.org/10.1007/978-3-642-18278-5_8openalex-extracted
Multi-robot Teams for Environmental Monitoring
inferredcites →https://doi.org/10.1007/978-3-642-83539-1_2openalex-extracted
An Overview of Quadtrees, Octrees, and Related Hierarchical Data Structures
inferredcites →https://doi.org/10.1007/s10514-021-09997-2openalex-extracted
Heterogeneous graph attention networks for scalable multi-robot scheduling with temporospatial constraints
inferredcites →https://doi.org/10.1007/s10951-008-0079-3openalex-extracted
Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm
inferredcites →https://doi.org/10.1016/j.aei.2005.06.002openalex-extracted
Multi-agent robot systems as distributed autonomous systems
inferredcites →https://doi.org/10.1016/j.cie.2018.03.039openalex-extracted
Real-time scheduling for a smart factory using a reinforcement learning approach
inferredcites →https://doi.org/10.1016/j.ejor.2007.10.040openalex-extracted
Project selection, scheduling and resource allocation with time dependent returns
inferredcites →https://doi.org/10.1016/j.matpr.2022.04.522openalex-extracted
Real-time Automated Guided vehicles scheduling with Markov Decision Process and Double Q-Learning algorithm
inferredcites →https://doi.org/10.1016/j.rcim.2016.05.008openalex-extracted
Coordination of several robots based on temporal synchronization
inferredcites →https://doi.org/10.1016/j.robot.2021.103905openalex-extracted
Multi-robot task allocation in disaster response: Addressing dynamic tasks with deadlines and robots with range and payload constraints
inferredcites →https://doi.org/10.1016/j.robot.2022.104289openalex-extracted
Balanced task allocation and collision-free scheduling of multi-robot systems in large spacecraft structure manufacturing
inferredcites →https://doi.org/10.1023/b:jims.0000037710.80847.b6openalex-extracted
A linearized polynomial mixed integer programming model for the integration of process planning and scheduling
inferredcites →https://doi.org/10.1080/10867651.1997.10487480openalex-extracted
Efficient Collision Detection of Complex Deformable Models using AABB Trees
inferredcites →https://doi.org/10.1080/10867651.1999.10487502openalex-extracted
A Fast and Robust GJK Implementation for Collision Detection of Convex Objects
inferredcites →https://doi.org/10.1109/aim52237.2022.9863369openalex-extracted
Where to Install the Manipulator: Optimal Installation Pose Planning Based on Whale Algorithm
inferredcites →https://doi.org/10.1109/jproc.2006.876927openalex-extracted
Distributed Multirobot Exploration and Mapping
inferredcites →https://doi.org/10.1109/lra.2019.2929983openalex-extracted
An Efficient Scheduling Algorithm for Multi-Robot Task Allocation in Assembling Aircraft Structures
inferredcites →https://doi.org/10.1109/lra.2020.3002198openalex-extracted
Learning Scheduling Policies for Multi-Robot Coordination With Graph Attention Networks
inferredcites →https://doi.org/10.1109/lra.2021.3093874openalex-extracted
Online Sequential Task Assignment With Execution Uncertainties for Multiple Robot Manipulators
inferredcites →https://doi.org/10.1109/tase.2013.2285813openalex-extracted
Energy Efficient Use of Multirobot Production Lines in the Automotive Industry: Detailed System Modeling and Optimization
inferredcites →https://doi.org/10.1109/tase.2023.3266889openalex-extracted
Online and Scalable Motion Coordination for Multiple Robot Manipulators in Shared Workspaces
inferredcites →https://doi.org/10.1109/tro.2009.2022423openalex-extracted
Consensus-Based Decentralized Auctions for Robust Task Allocation
inferredcites →https://doi.org/10.1109/tsmcb.2004.832155openalex-extracted
Multirobot Systems: A Classification Focused on Coordination
inferredcites →https://doi.org/10.1177/0278364904045564openalex-extracted
A Formal Analysis and Taxonomy of Task Allocation in Multi-Robot Systems
inferredcites →https://doi.org/10.1177/0278364913496484openalex-extracted
A comprehensive taxonomy for multi-robot task allocation
inferredcites →https://doi.org/10.15607/rss.2013.ix.049openalex-extracted
Fast Scheduling of Multi-Robot Teams with Temporospatial Constraints
inferredcites →https://doi.org/10.15607/rss.2020.xvi.094openalex-extracted
Heterogeneous Graph Attention Networks for Scalable Multi-Robot Scheduling with Temporospatial Constraints
inferredcites →https://doi.org/10.1609/aaai.v29i1.9440openalex-extracted
Multi-Robot Auctions for Allocation of Tasks with Temporal Constraints
inferredcites →https://doi.org/10.1609/aaai.v30i1.9945openalex-extracted
Monte Carlo Tree Search for Multi-Robot Task Allocation
inferredcites →https://doi.org/10.5555/2936924.2937082openalex-extracted
Iterated Multi-Robot Auctions for Precedence-Constrained Task Scheduling
inferredcites →https://doi.org/10.5772/57313openalex-extracted
A Survey and Analysis of Multi-Robot Coordination
Editorial review for independent work. ICSAC — the Institute for Complexity
Science and Advanced Computing — runs a structured editorial panel for researchers
publishing outside journals, and publishes on CiteStamp rails. Submission is free
and goes through ORCID: icsacinstitute.org/submit.