A Matheuristic-Oriented Iterated Greedy Algorithm for Multi-Mode Resource-Constrained Project Scheduling Problem Under Uncertainty

https://doi.org/10.2139/ssrn.4760922
0 signed · 42 inferred · view as graph

Inferred edges come from two machine sources: sweeps of open repository metadata (mostly SSRN and Zenodo), and a bulk OpenAlex citation snapshot. Every row below is labelled with the one it came from. Neither is a complete citation index — absence here is not evidence of absence.

Is this your work? Sign in with ORCID and put your name on the claims that are yours.
Claim with ORCID
Reference health. See whether every reference in this work resolves to a known work and none has been retracted — and get a dated CiteStamped badge you can embed.
See reference health

What this work says

Outgoing claims: the papers this work cites, builds on, or argues with.

inferredcites →https://doi.org/10.1007/s10479-018-2899-7openalex-extracted
Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1007/s10479-023-05403-5openalex-extracted
A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
inferredcites →https://doi.org/10.1007/s10479-023-05775-8openalex-extracted
An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem
inferredcites →https://doi.org/10.1007/s10696-012-9147-2openalex-extracted
Robust optimization for resource-constrained project scheduling with uncertain activity durations
inferredcites →https://doi.org/10.1007/s10696-015-9210-xopenalex-extracted
An estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1007/s10845-014-0980-xopenalex-extracted
Uncertain project scheduling problem with resource constraints
inferredcites →https://doi.org/10.1007/s10951-017-0553-xopenalex-extracted
The proactive and reactive resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.amc.2007.04.096openalex-extracted
A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
inferredcites →https://doi.org/10.1016/j.asoc.2011.09.007openalex-extracted
Multi-mode renewable resource-constrained allocation in PERT networks
inferredcites →https://doi.org/10.1016/j.asoc.2021.107480openalex-extracted
A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem
inferredcites →https://doi.org/10.1016/j.cie.2018.11.031openalex-extracted
An effective mirror-based genetic algorithm for scheduling multi-mode resource constrained projects
inferredcites →https://doi.org/10.1016/j.cie.2019.01.033openalex-extracted
Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.cie.2021.107322openalex-extracted
Stochastic resource-constrained project scheduling problem with time varying weather conditions and an improved estimation of distribution algorithm
inferredcites →https://doi.org/10.1016/j.cie.2021.107592openalex-extracted
A matheuristic approach to the multi-mode resource constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.cor.2009.09.019openalex-extracted
A double genetic algorithm for the MRCPSP/max
inferredcites →https://doi.org/10.1016/j.cor.2018.01.001openalex-extracted
A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.cor.2020.104905openalex-extracted
Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: A multi-objective approach
inferredcites →https://doi.org/10.1016/j.ejor.2009.03.034openalex-extracted
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2011.04.018openalex-extracted
Iterated greedy for the maximum diversity problem
inferredcites →https://doi.org/10.1016/j.ejor.2013.10.012openalex-extracted
An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
inferredcites →https://doi.org/10.1016/j.ejor.2018.04.025openalex-extracted
Efficient priority rules for the stochastic resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.ejor.2019.09.052openalex-extracted
A robust optimization approach for the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1016/j.engappai.2023.106398openalex-extracted
Robust scheduling of EMU first-level maintenance in a stub-end depot under stochastic uncertainties
inferredcites →https://doi.org/10.1016/j.eswa.2020.114475openalex-extracted
Multi-mode resource-constrained project scheduling with uncertain activity cost
inferredcites →https://doi.org/10.1016/j.eswa.2022.119188openalex-extracted
Critical chain based Proactive-Reactive scheduling for Resource-Constrained project scheduling under uncertainty
inferredcites →https://doi.org/10.1016/j.ijpe.2008.11.002openalex-extracted
An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
inferredcites →https://doi.org/10.1016/j.omega.2016.09.009openalex-extracted
An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
inferredcites →https://doi.org/10.1016/j.orp.2017.01.002openalex-extracted
On the generalization of constraint programming and boolean satisfiability solving techniques to schedule a resource-constrained project consisting of multi-mode jobs
inferredcites →https://doi.org/10.1016/s0377-2217(99)00485-3openalex-extracted
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1061/(asce)co.1943-7862.0000232openalex-extracted
Errata for “Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm” by Jin-Lee Kim and Ralph D. Ellis Jr.
inferredcites →https://doi.org/10.1080/00207543.2020.1857450openalex-extracted
Performance evaluation of scheduling policies for the dynamic and stochastic resource-constrained multi-project scheduling problem
inferredcites →https://doi.org/10.1080/00207543.2021.1924411openalex-extracted
Various extensions in resource-constrained project scheduling with alternative subgraphs
inferredcites →https://doi.org/10.1080/00207543.2022.2135629openalex-extracted
A matheuristic for flexible job shop scheduling problem with lot-streaming and machine reconfigurations
inferredcites →https://doi.org/10.1080/0305215x.2016.1197610openalex-extracted
Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1109/tsg.2019.2922355openalex-extracted
Linearized Hybrid Stochastic/Robust Scheduling of Active Distribution Networks Encompassing PVs
inferredcites →https://doi.org/10.1109/tste.2021.3080707openalex-extracted
Security-Constrained Optimal Sizing and Siting of BESS in Hybrid AC/DC Microgrid Considering Post-Contingency Corrective Rescheduling
inferredcites →https://doi.org/10.1111/itor.12644openalex-extracted
Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic
inferredcites →https://doi.org/10.1287/ijoc.1040.0121openalex-extracted
A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem
inferredcites →https://doi.org/10.1504/ejie.2017.089101openalex-extracted
An adaptive large neighbourhood search as a matheuristic for the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.1504/ijor.2015.070859openalex-extracted
Using a meta-heuristic algorithm for solving the multi-mode resource-constrained project scheduling problem
inferredcites →https://doi.org/10.3390/math11020337openalex-extracted
A Formulation for the Stochastic Multi-Mode Resource-Constrained Project Scheduling Problem Solved with a Multi-Start Iterated Local Search Metaheuristic

What points at this work

Incoming claims: where this work appears in other papers’ reference lists and arguments.

inferred← citeshttps://doi.org/10.2139/ssrn.5367133openalex-snapshot
Frequent Extensions of the Resource-Constrained Project Scheduling Problem: A Systematic Literature Review
Editorial review for independent work. ICSAC — the Institute for Complexity Science and Advanced Computing — runs a structured editorial panel for researchers publishing outside journals, and publishes on CiteStamp rails. Submission is free and goes through ORCID: icsacinstitute.org/submit.